Wandsworth · SW11
Splashbacks and upstands in Between the Commons
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Between the Commons kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.
This is the densest concentration of side-return and full-width rear extensions in the borough — the alley is infilled, the rear wall is pushed back, and the result is a 4m to 5m wide kitchen with a long run plus a 2.4m to 3m island under a flat rooflight. Islands almost always carry a hob and a mitred end panel.
The island is the whole job here — get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.
The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. The wall makes that decision, not the brochure.
On these streets the housing is Late Victorian terrace and Edwardian terrace. The differences between them show up at template, not at enquiry.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the New Malden patch. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
What gets asked for here
This is not the local speciality and there is no point saying otherwise: worktop design & quotation, worktop templating and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.
Victorian and Edwardian terraces
Getting stone into the room
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.
Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged.
Access
Getting stone into a Between the Commons kitchen
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Between the Commons is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Between the Commons
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Between the Commons, or just list it?
Yes. Between the Commons is on the patch, and the postcodes we work here are SW11. It is run from the New Malden side, covering South West London & Surrey. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in Between the Commons?
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Cut from the same slab run as the tops. The island is the whole job here — get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.
Is access a problem in Between the Commons?
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is Between the Commons really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop design & quotation, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day.
What decides the price of a worktop in Between the Commons?
If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Same slab run as the tops.
Related
More around Between the Commons
Other work we do in Between the Commons
Next step
Splashbacks and upstands in Between the Commons, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.