Wandsworth · SW11
Kitchen worktops in Between the Commons
This is the densest concentration of side-return and full-width rear extensions in the borough — the alley is infilled, the rear wall is pushed back, and the result is a 4m to 5m wide kitchen with a long run plus a 2.4m to 3m island under a flat rooflight. Islands almost always carry a hob and a mitred end panel.
The housing stock
What we are usually working with in Between the Commons
This is the densest concentration of side-return and full-width rear extensions in the borough — the alley is infilled, the rear wall is pushed back, and the result is a 4m to 5m wide kitchen with a long run plus a 2.4m to 3m island under a flat rooflight. Islands almost always carry a hob and a mitred end panel.
The island is the whole job here — get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.
The stock behind these kitchens runs to Late Victorian terrace and Edwardian terrace. A quote that ignores which one you have is guessing.
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. What that does to a quote is move the number away from square metreage and towards slab yield, join count and time on site. Itemised, and nothing payable until we template.
A long piece has to come through the front door, down the hall, round the newel post and through a doorway with a step down into the addition. The laser plots the bow along the back of the run, which is why a tape reading taken beforehand never matches. No stone is ever cut from a plan.
A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Two to three hours on site, with the sink, tap and hob physically present. The room as it is, not as it was drawn.
Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. The template happens when the units are in, fixed and level, whoever is fitting them. No stone is cut from a plan.
Access. Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.
At a glance
- Borough
- Wandsworth
- Postcodes
- SW11
- Covered from
- New Malden patch
- Lead time
- 3–7 working days from template
There is nothing to visit in Between the Commons. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Between the Commons
Six services, ordered by what Between the Commons's housing stock actually asks for most.
Nearby
We also work around Between the Commons
Questions
Working in Between the Commons
Do you fit kitchen worktops in Between the Commons?
Yes. This is the densest concentration of side-return and full-width rear extensions in the borough — the alley is infilled, the rear wall is pushed back, and the result is a 4m to 5m wide kitchen with a long run plus a 2.4m to 3m island under a flat rooflight. Islands almost always carry a hob and a mitred end panel. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. The templater needs a proper stop, not a pause.
What kind of kitchens do you usually work on in Between the Commons?
Late Victorian terrace and Edwardian terrace. A long piece has to come through the front door, down the hall, round the newel post and through a doorway with a step down into the addition. The laser plots the bow along the back of the run, which is why a tape reading taken beforehand never matches. No stone is ever cut from a plan.
Is access difficult in Between the Commons?
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. It goes on the drawing with the run dimensions.
What do you get asked for most in Between the Commons?
Worktop design & quotation, worktop templating and worktop installation, in that order. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Two to three hours on site, with the sink, tap and hob physically present. The room as it is, not as it was drawn. The island is the whole job here — get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.
What decides the price of a worktop in Between the Commons?
If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. Slab yield is worked out at quote stage, so if the layout forces a second slab you hear it before you commit rather than after. The join count is stated with its reason. Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. One measurement never describes it, which is why a tape reading taken before the visit rarely matches the template. Measured at worktop height, nowhere else. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Between the Commons?
Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. The template happens when the units are in, fixed and level, whoever is fitting them. No stone is cut from a plan. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Between the Commons kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.