Wandsworth · SW11

Worktop replacement in Between the Commons

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Between the Commons kitchens

The kitchens we meet in Between the Commons

If you are weighing up worktop replacement in Between the Commons, the first thing worth knowing is that the building decides more than the brochure does. This is the densest concentration of side-return and full-width rear extensions in the borough, the alley is infilled, the rear wall is pushed back, and the result is a 4m to 5m wide kitchen with a long run plus a 2.4m to 3m island under a flat rooflight. Islands almost always carry a hob and a mitred end panel. Plenty of kitchens do not match either description exactly, which is what the measured survey is there to sort out.

Sash windows sit low in the rear wall, and the sill often lands below the height a worktop wants to run past. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. How old the kitchen is decides how long preparation takes.

Where the addition is single storey the ceiling follows a lean-to roof, so one side of the room loses height and a full-height panel has a sloping stop. Carcasses are checked for square and fixed back before a stone top goes on them. The building has kept moving; the new template catches up.

The stock we template in here is Late Victorian terrace and Edwardian terrace. Which of those you have decides most of what follows.

Undermounted sink cut-out in a quartz worktop
  • Late Victorian terrace
  • Edwardian terrace

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
  • Templating happens in the room, and it is the measurement everything else is cut from.
Borough
Wandsworth
Postcodes
SW11
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Between the Commons is its own job

Every area has its own complications, and in Between the Commons these are the ones that decide the day. Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned. The island is the whole job here, get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land. That is why the quote is itemised: you can see what the building is costing you and what the stone is.

The work

What worktop replacement involves

The service assumes the units stay in place, so it is not a route to changing the layout. Moving a sink or a run of cabinets makes it a kitchen job with a worktop in it. The surface is cleared and the route out protected before anything is unfixed, because a top that has been sealed and screwed down for years leaves the house in pieces with edges on them. You end up with tiling, sealant and the wall line all finished against the new surface, so there is no strip of old grout left showing where the previous top used to sit.

Replacement sometimes runs in the reverse order to a new fit, because the old top has to come off before what is under it can be templated. Brackets, battens and any timber sub-frame come out with the top, and what was screwed into the wall gets filled. Original cabinets are long gone here, and what comes out is a flat-pack run that has spent fifteen years on a cold solid floor. The tiling line and the wall behind it are dealt with too.

Sink cut-outs See the options

The money

What it costs in Between the Commons

Most of the cost sits in the same places as a new fit (the cut list and the day) with the strip-out added and the units taken away. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. Supply-only material is £110 to £550 per square metre. The more useful question is not which end of that you are at, but how many operations the cut list carries. No surprises pulled out from under the old top.

Victorian and Edwardian terraces

What Between the Commons asks for

Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A void week is the entire schedule.

We are not going to claim this is the local speciality when the stock says otherwise. Worktop installation is what these streets actually ask for. The work itself is done exactly the same way.

Victorian and Edwardian terraces

The building, and what it does to the job

Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. It is the usual surprise, and it is a known one.

Access

Getting stone into a Between the Commons kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Between the Commons is covered on our south west London run, along with the rest of Wandsworth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Between the Commons

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Between the Commons?

Yes. Between the Commons is on the patch, and the postcodes we work here are SW11. It is worked on our south west London run, along with the rest of Wandsworth. Where a marked loading box sits on the red route the stop is legal but timed, so the unload runs as one movement with every hand on it. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. A timed bay does not cover a strip-out and a fit. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop replacement in a Between the Commons kitchen?

Original quarry tiles survive under a later vinyl in many of these, and lifting the units off them shows how far the floor has fallen towards the garden end. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. What is behind the old splashback decides the new one. A window board sitting below finished worktop height leaves two choices, drop the top under it or notch the stone around it, and both cost more than a straight run. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. It was there long before we were.

03

How would you get a worktop into a property in Between the Commons?

Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The room is cleared for the way out as much as the way in. A bus lane along the frontage brings its own hours with it, and stopping in one is enforced the same way the red route is. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Old stone is heavier going out than it looked coming in.

04

Is worktop replacement what Between the Commons is known for?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The carcasses have to be sound, because stone is several times the weight of what is coming off. A plumber either side of us. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Old tops out in the morning, new stone down and sealed the same afternoon. The fastest upgrade a sound kitchen has.

05

What moves the number on a quote around here?

An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. A corner that was butted can be mitred this time. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What state does a Between the Commons kitchen have to be in before you template?

A cill projecting forward of the plaster line pushes the back edge out, and the units then stand off the wall by that amount for the whole length. This is the commonest reason a replacement turns out to need more than a straight swap. The old top hid it. The drawing will not. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. One staircase can serve an owner on the first floor and a managed tenancy on the second, so the access arrangement changes at every landing while the building stays the same. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Disposal is named, not assumed.

07

What happens if my units are not level?

The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Levelling belongs in the carcasses, on their own legs and packers. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. We would rather find it at template than on the morning, which is why the templater looks behind the units. Nothing about it is a discovery on fitting day.

08

Does a stone worktop need sealing?

Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. The outrigger shares a party wall with the addition next door for its whole length, so one long side of the kitchen is solid brick with another kitchen on the far side of it. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. A new top on a settled run needs the run corrected first.

09

Who removes the old worktop in a Between the Commons kitchen?

Taking the old tops off and disposing of them is its own line on the quote rather than something folded into the stone price. If you want the old top kept for a garage or a utility, say so and it stays on site. The carcasses stay put. Only the surface changes. The van is not staying on a main road for the day, so once the stone is off it goes and parks properly somewhere else. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. The van has to stand through both halves of the day.

10

What happens between the template and the fitting day?

The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. The same firm templates and fits. Nobody else is brought in to install. The side return was an outside toilet and a coal store before it was ever a kitchen, and the walls left over from that are half a brick thick. Taking the old tops off is also the first honest look at what has been going on underneath them. A twenty-year-old run is replaced to its own shape.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The countertops look fantastic, and he even went above and beyond, using leftover quartz to create an extra counter in my bathroom. Genius. He’s kind, professional, reasonably priced, and just gets on with it. No fuss, no drama, just a job very well done. I wouldn’t hesitate to recommend him and will absolutely be using him again if the need arises. Happy to answer any questions.”
Susie WigginsGoogle review
★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite

Next step

Worktop replacement in Between the Commons, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.