Bexley · DA16

Worktop replacement in Welling

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The whole kitchen from the garden doors, the Enzo island running down the middle towards the ovens

Welling kitchens

The kitchens we meet in Welling

Getting worktop replacement in Welling right is mostly a matter of knowing what you are dealing with before the order goes in, and that means looking properly. Long stretches of interwar semis behind the main road, kitchens roughly 2.4m by 3m at the rear with a side door to the alley; the typical job is a knock-through into the dining room, with a smaller number of full-width rear extensions carrying an island. The tape measure decides it, not the description above, and not anything anybody says over the telephone.

Suspended floors at the front meet a solid slab in the extension somewhere in the middle, and the units sit across the change. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. Stone is far heavier than what is coming off.

The scullery floor was quarry tile bedded on concrete and it is often still under a laminate, sitting lower than the boards in the room it now joins. The cill over the sink is checked against the new upstand height before anything is cut. Chipboard that has taken water will not take stone.

Most of what we quote on here is 1930s ribbon-development semi, interwar terrace, postwar infill and flats over shops. What the units are screwed to varies between them, and that decides the fixings.

Worktop join finished flush against a wall
  • 1930s ribbon-development semi
  • interwar terrace
  • postwar infill
  • flats over shops

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
Borough
Bexley
Postcodes
DA16
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Welling is its own job

Getting a worktop into a kitchen in Welling and getting it to sit right are the parts worth planning properly. The main roads are bus-heavy with waiting restrictions, but the residential streets behind have drives and space; flats above the shopping parades are stair-only. The 1930s side door into the alley usually lands mid-run, either it gets blocked up or the worktop stops short of it. The awkward conversation belongs at your kitchen table at the quote stage, not over a half-fitted worktop.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. The surface is cleared and the route out protected before anything is unfixed, because a top that has been sealed and screwed down for years leaves the house in pieces with edges on them. You end up with cut-outs machined for the sink and hob you have now, which is not always what the old top was cut for, and a run that meets the wall as it stands today.

A replacement is measured against the kitchen standing in the room today rather than the layout it was fitted to years ago. Brackets, battens and any timber sub-frame come out with the top, and what was screwed into the wall gets filled. The larder recess usually holds an odd short length that has to be dealt with at the same time or lived with afterwards. You keep the kitchen; only the top is new.

Corners and joins See the options

The money

What it costs in Welling

The saving on a replacement is that you keep the units. The risk is what is found under the old top, and that is checked before a deposit rather than after. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. No surprises pulled out from under the old top.

1930s and inter-war semis

Welling in the housing figures

On the Welling streets we cover, most of the stock dates from the building boom of the twenties and thirties. Repeated stock means repeated units, and if they are sound the rest is straightforward. Booked around what the stock actually is.

1930s and inter-war semis

What Welling asks for

Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Where the doors and drawer fronts are staying, the new surface is chosen against them rather than in isolation. Cam-lock carcasses get braced before stone lands.

The housing here makes this the default job rather than worktop installation.

Access

Getting stone into a Welling kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Welling is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Welling

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Welling far enough out to be a problem for you?

Yes. Welling is on the patch, and the postcodes we work here are DA16. It is worked on our south east London run, along with the rest of Bexley. Where the drive is shared, the half-hour the van spends in the way is agreed with the neighbour in advance rather than apologised for at the time. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste leaves with us, so the van has to still be there. You never have to visit anything or collect anything: we template in your kitchen and fit in your kitchen.

02

Why would worktop replacement in Welling be any different from anywhere else?

The classic arrangement is the original back room with a later extension bolted onto it, so the kitchen is two ages of building in one room. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. The floor has dropped since the kitchen went in. Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The stack was boxed in after the kitchen went in.

03

What is the carry like in Welling?

A fitted stair carpet is either lifted or covered, because grit trodden into it under work boots does more harm than the carry itself. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. A stone top coming out whole needs the same crew as one going in. A step up from the drive to the threshold turns the last two metres into a lift, and a lift is where two pairs of hands become the minimum. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Both loads want the same few metres of kerb.

04

Is worktop replacement what Welling rings about?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Housings set out for laminate are checked first. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The carcasses have to be sound, because stone is several times the weight of what is coming off. A builder-finish kitchen upgrades in a morning.

05

Where does the money go on a Welling worktop?

Whether it comes off the same slab as the run behind it or needs one of its own is settled by laying both against the usable area of the slab, not by adding the metres up. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The shape is measured again, not copied off the old top. Supply-only material is £110 to £550 per square metre, and templating, fabrication and fitting are quoted separately rather than rolled in.

06

What needs to be ready before you come to Welling?

A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. We would rather find it at template than on the morning, which is why the templater looks behind the units. A postformed top swallowed the fall. This will not. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Because the money comes out of a household rather than a maintenance budget, phasing is common: tops now, island or splashbacks later, quoted so the second visit still matches the first. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Sequenced around access rather than around the workshop.

07

Is templating a separate visit from fitting?

On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. Nothing changes hands until after the template. If the units run late the template moves, not the fit: the gap between them is fabrication. The rear extension is usually the newest and truest part of the building, so it is the older half of the kitchen that gives the trouble. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Units checked before stone goes on them.

08

Do you take the old worktop away?

On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. The units below stay exactly as they are; only the surface is replaced. If you want the old top kept for a garage or a utility, say so and it stays on site. Where the van cannot turn on the plot it has to arrive already facing the right way, so the approach along the street is part of the plan. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. Half a day of parking buys half a job.

09

What is not included in the quoted figure?

What moves the figure after templating is a change you make: a different edge, an extra cut-out, a bigger sink chosen late. Cut-outs, edge profile and join count are itemised, so taking one out removes a line rather than starting an argument. Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. The alcove was never square and it still is not.

10

Do you do undermounted sinks in Welling?

Each cut-out is priced on its own line, so a range, a bowl and a half, a boiling tap and a drainer are four items rather than one. The sink, tap and hob have to be physically in the room at the template, not merely ordered, because the cut-out is machined to the item itself. The offcut taken out of the middle for a hob is a large usable piece, and it is worth deciding early whether it becomes an upstand or goes in the skip. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Laminate hides what the gables are really doing.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review

Next step

Worktop replacement in Welling, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.