Camden · NW6

Worktop replacement in West Hampstead

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

West Hampstead kitchens

The kitchens we meet in West Hampstead

No two streets in West Hampstead throw up the same problem, and the replacements we book there are priced off what is actually behind the units rather than off a floor plan. Heavy conversion-flat territory, with purpose-built Edwardian mansion flats where the kitchen sits fixed off the hall, plus terraced houses split into upper and lower flats. The recurring job is replacing a tired laminate galley run of 2.6-3.2m and adding upstands, rather than reconfiguring the room. A worktop that fits is a worktop that was measured. The description is background, the template is the actual instruction.

Sash windows sit low in the rear wall, and the sill often lands below the height a worktop wants to run past. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. A sound carcass takes stone; a soft one gets replaced first.

Ceilings in the principal rooms are three metres or more, so a full-height panel behind a hob is a taller piece here than the same kitchen would need anywhere else. Each piece is offered up and eased in rather than dropped, because nothing in the room is straight enough to drop into. The units have settled with the floor and get re-levelled.

What the research records here is Victorian terrace, Edwardian mansion block, conversion flat and modern development. What is behind the plaster is different in each, and it matters at fixing.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • Edwardian mansion block
  • conversion flat
  • modern development

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • The new material is guaranteed for 25 years and the labour for five.
  • New stone is fitted five to ten working days after the measure.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
Borough
Camden
Postcodes
NW6
Covered on
our central and north London run
Fitted
5–10 working days from template

The place

Why West Hampstead is its own job

Before we quote a length in West Hampstead we want to know how the stone gets in and what it will be sitting against. West End Lane is congested with buses and has almost no loading, so you work off the residential side streets under a Monday to Friday CPZ. Mansion blocks are commonly three or four storeys with no lift and a communal stair shared with other residents, which has to be cleared before any carrying starts. Replacement work here means templating over existing units, so check for out-of-level base cabinets before cutting, because decades of settlement in these blocks show up as a 10mm fall across a 3m run. The template is where the room stops being a drawing and starts being measurements, and the price follows the measurements.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. The template and the fit are separate visits with three to seven working days between them, so the kitchen is only out of action on the day the old surface comes off. You end up with cut-outs machined for the sink and hob you have now, which is not always what the old top was cut for, and a run that meets the wall as it stands today.

Replacement is the one worktop job where the survey and the demolition are the same piece of work. Brackets, battens and any timber sub-frame come out with the top, and what was screwed into the wall gets filled. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. The tiling line and the wall behind it are dealt with too.

Waterfall ends See the options

The money

What it costs in West Hampstead

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Supply-only material sits between £110 and £550 per square metre, which is one input into the quote rather than the quote. You keep the units, and you see what that saves.

Victorian and Edwardian terraces

The carry, and what it rules out

An inward-opening door swinging back against the wall leaves less clear opening than the frame measures, and a storm porch in front of it is tighter again. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Half a day can go on the strip-out where the way in is tight.

Victorian and Edwardian terraces

What West Hampstead asks for

The research on this patch puts this at the top of the list, above worktop splashbacks & upstands.

Victorian and Edwardian terraces

West Hampstead in the housing figures

Locally houses are the minority and blocks are the norm. The old tops have to leave the way the new ones arrive, and a laminate run is easier to remove whole than to carry whole. Any fall in the carcasses is packed out first.

Access

Getting stone into a West Hampstead kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central and north London patch

West Hampstead is covered on our central and north London run, along with the rest of Camden.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in West Hampstead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is West Hampstead on your patch?

Yes. West Hampstead is on the patch, and the postcodes we work here are NW6. It is worked on our central and north London run, along with the rest of Camden. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Nothing goes out until the route back to the van is clear. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What do the kitchens in West Hampstead do to worktop replacement?

A villa cut into flats leaves kitchens in rooms that were never kitchens, with services run to wherever they could physically be made to reach. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. A replacement is measured against the walls as they are now. A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The alcove was never square and it still is not.

03

Do you have trouble getting long pieces into West Hampstead kitchens?

A step up off the pavement means the piece is lifted to the threshold before it is carried anywhere, and that first lift is the one that wants four hands. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Nothing new comes down a hall still full of old top. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The old tops leave in one movement rather than piece by piece.

04

Is West Hampstead mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. The carcasses have to be sound, because stone is several times the weight of what is coming off. A builder-finish kitchen upgrades in a morning. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. Old tops out in the morning, new stone down and sealed the same afternoon. The doors are staying, so the colour answers to them.

05

What decides the price of a worktop in West Hampstead?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Old runs are rarely square, and stone will not forgive it. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What do I need to sort out first?

Once the carcasses are levelled the gap under the plinth varies along the run, and that varying gap is the honest record of what the floor is doing. This is the commonest reason a replacement turns out to need more than a straight swap. What passed for a fit in chipboard will not pass in stone. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. One owner can take a date next week while the flat below needs three weeks of notice, so several kitchens in one building end up scheduled by the slowest permission. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. The plumber is booked by whoever holds the contract.

07

When do I pay for a West Hampstead worktop?

Material is quoted supply only and templating, fabrication and fitting sit on their own lines, so it is visible which part is stone and which is labour. Plumbing, gas and electrical work are not in the figure, because we do not do them. Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. We would rather find it at template than on the morning, which is why the templater looks behind the units. Taking the top off is what exposes the floor.

08

What happens once you have templated in West Hampstead?

There is nothing to pay before the template visit. Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. The design and quotation visit comes first. It is free and carries no obligation. The side return was an outside toilet and a coal store before it was ever a kitchen, and the walls left over from that are half a brick thick. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. The wall behind the old top is rarely the wall on the drawing.

09

Is a full-height splashback practical in a West Hampstead kitchen?

A full-height piece shows a wall that is out more than an upstand does, over the extra height. It is quoted by area like the worktop, so a long run is a material line rather than a trim. An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. The flat entrance door and the internal doorways are usually tighter than the communal stairs, which is the opposite of what most people assume. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. Chipboard that has taken water will not take stone.

10

How do you cut out for an undermounted sink?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Where the seam went before is not where it goes now.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Worktop replacement in West Hampstead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.