Camden · NW6 NW3

Worktop replacement in South Hampstead

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

South Hampstead kitchens

The kitchens we meet in South Hampstead

Half of what we get asked about worktop replacement in South Hampstead could be answered by a tape measure and ten minutes in the room in question. Large villas divided into two or three flats, which leaves kitchens in odd positions such as a converted bedroom, a rear return or an extended half-landing, and rarely gives you two long parallel walls. Runs sit at 2.4-3m with a lot of fitted corner work around bay windows and blocked fireplace openings. The quotation visit costs nothing and commits you to nothing. It is also the simplest way to find out which you have.

Lime plaster on nine inch brick has been patched with gypsum wherever a radiator or a socket has moved, and the two finish at different depths. The old tops come off in pieces, and what is under them decides whether the units need levelling before anything new goes on. Units checked before stone goes on them.

Ceilings are high enough that an extractor over the island has a long drop, and its position is fixed before the island top is templated. How the veining runs across the joins matters more here than anywhere, because the room is seen from every side. Old fixings come out of soft brick and better ones go in.

The fabric of the place is Victorian villa conversion, red-brick mansion block and Edwardian terrace. Two of those can sit on the same street and quote a long way apart.

Undermounted sink cut-out in a quartz worktop
  • Victorian villa conversion
  • red-brick mansion block
  • Edwardian terrace

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Camden
Postcodes
NW6, NW3
Covered on
our central and north London run
Fitted
5–10 working days from template

The place

Why South Hampstead is its own job

Stone is heavy, unforgiving and cut to a millimetre, so what governs a job in South Hampstead is everything around it. Permit bays fill early and many villas sit back behind long front paths, so the carry is 15-25 metres before you even reach the door. No lifts in the conversions, and the original staircases are generous in width but have winders at the turn. Winder stairs are worse than narrow ones for slab work because the effective diagonal shrinks at the turn, so size pieces off the tightest tread rather than the landing. Far better to find it in South Hampstead with a tape measure in our hands than on the day the slab arrives.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. The surface is cleared and the route out protected before anything is unfixed, because a top that has been sealed and screwed down for years leaves the house in pieces with edges on them. You end up with the same kitchen and a completely different surface, in one fitting day rather than a kitchen refit that empties the room for a fortnight.

A replacement is priced in three parts: the new stone, the work of taking the old top out, and carting it away afterwards. Sink and hob are settled before the templater attends, because a change to either changes the cut-outs and cannot be added later. An island top in one of these is too heavy to walk out through the house, so it is broken down where it stands. Support goes in before the weight does.

Sink cut-outs See the options

The money

What it costs in South Hampstead

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. The rate is £110 to £550 per square metre supply only, though what you buy is slabs rather than square metres, which is why the material line follows the yield and not the tape. The strip-out and the disposal are their own lines.

period detached houses and villas

The carry, and what it rules out

Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Old pieces are carried out before new ones are carried in.

period detached houses and villas

What South Hampstead asks for

Judged on what the buildings actually are, this leads. Worktop installation sit behind it.

period detached houses and villas

South Hampstead in the housing figures

Locally the bulk of the stock was standing before the First World War. Stair turns and landing widths decide the piece list. What the old top was hiding is the real question, and it only answers on the day. What the stock predicts, the strip-out confirms.

Access

Getting stone into a South Hampstead kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central and north London patch

South Hampstead is covered on our central and north London run, along with the rest of Camden.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in South Hampstead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to South Hampstead?

Yes. South Hampstead is on the patch, and the postcodes we work here are NW6, NW3. It is worked on our central and north London run, along with the rest of Camden. A suspension is charged by the bay and by the day, so the number of metres asked for is worth getting right the first time. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The van has to stand through both halves of the day. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

Does the housing in South Hampstead change how worktop replacement works?

A large villa has wide doors, a generous hall and somewhere to park, so the joins that go in are chosen for layout rather than forced by the route. These are the multi-piece jobs: long runs, a large island and often a range cooker that cannot be moved, so the stone is templated in several pieces and how the vein runs across the joins matters. Everything the last fit ignored is visible for a morning. Old breasts carry a bulge low down where the original opening was closed up, and the units stand off it before the stone is measured at all. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The beading was covering a bowed wall.

03

How does the stone actually reach a kitchen in South Hampstead?

Every flight adds a set of handling movements, and handling is where stone gets damaged, so a fourth-floor walk-up is priced by the flight rather than by the metre. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Half a day can go on the strip-out where the way in is tight. Plenty of zones run at the weekend as well as through the week, so a Saturday date is not automatically the easier one to work. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. A one-hour window will not hold a two-way job.

04

Is South Hampstead mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Same day, because the void is the whole budget. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. The carcasses have to be sound, because stone is several times the weight of what is coming off. Repairable in place beats replaced whole.

05

What am I actually paying for, line by line?

A galley that is also the route to the back door is a corridor first and a kitchen second, and what the shape can take is set by the traffic going through it. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Any overhang gets underpinned first. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

Is there anything I have to finish before the template in South Hampstead?

Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. We would rather find it at template than on the morning, which is why the templater looks behind the units. Strip out first, then measure what is actually there. Have a fitter or joiner fix and level the island units beforehand, and get the sink, taps, hob and any range on site before templating so we cut to the actual appliances. The decision usually gets made standing in the room rather than at a desk, which is why a slab is worth viewing whole instead of choosing from a sample card. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Repeat flats take the same replacement specification.

07

How do you cut out for an undermounted sink?

A Belfast or butler sink has to be installed and at its final height before the template, because the stone is cut to sit on it. A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Two runs of similar length nest as a pair off one slab, and if one of them grows by a few hundred millimetres the pair stops fitting and the yield changes for both. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The shape is measured again, not copied off the old top.

08

Which materials need sealing and which do not?

A seal is not waterproofing. It only buys time to wipe a spill up. Marble is the one people underestimate. It is porous, like granite, and wants sealing. Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. These kitchens are big rooms with long perimeter runs and an island, so level has to hold across the whole floor rather than along one wall. Any island overhang past about 300mm will not carry weight on the carcass alone, so flat steel bar or brackets have to be let into the units first, and that is agreed at template stage, not on fit day. The shell is the constant here; the surface is not.

09

Will you fit stone onto units that are not level?

Packing takes up small variation. It is not there to hide something that belongs in the units. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. Levelling belongs in the carcasses, on their own legs and packers. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. The old carcasses are rarely level and never were.

10

What do drainer grooves add to the job?

The grooves sit inside the depth of the top with stone left either side, so a shallow run limits them. They read strongly across a dark stone and are nearly invisible on a pale one, so look before deciding. There is usually a cellar head or a hatch somewhere in the floor, and whatever sits above it has to stay liftable. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Whatever the old top hid comes to light.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Worktop replacement in South Hampstead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.