
Merton · SW19
Kitchen worktops in Wimbledon Park
The terraces on the streets sloping down to the lake are the classic side-return job: the alley is filled in, the kitchen widens to about 3.6m and takes a long run under a rooflight with a modest island opposite. Where houses are split into upper and lower conversions, the top flat usually keeps a narrow galley in the old back bedroom.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
The housing stock
What we are usually working with in Wimbledon Park
The terraces on the streets sloping down to the lake are the classic side-return job: the alley is filled in, the kitchen widens to about 3.6m and takes a long run under a rooflight with a modest island opposite. Where houses are split into upper and lower conversions, the top flat usually keeps a narrow galley in the old back bedroom.
Permit-holder bays fill up from mid-morning and the streets are narrow enough that a parked van blocks a lane.
Extension floors here are often laid before the units go in and settle unevenly, so the base cabinets need packing and re-levelling on template day or the joint on a long run opens up.
Upper conversion flats are reached by a straight but tight internal stair with a half-landing turn, so long lengths have to be measured against the stairwell diagonal before ordering.
What we are usually templating in is Edwardian terrace, Victorian terrace and Purpose-built 1930s flat. Each of those behaves differently once the old top comes off.
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Two to three hours on site, once the units are fitted, fixed and level. Units fitted, fixed and level first.
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. The day is planned backwards from the hall. The slow parts are slow for a reason.
These kitchens are full of boxed soil stacks, gas risers and heating pipework, and the boxing usually stops short of the ceiling. Anything that has to stay accessible - stopcocks, gas meters, riser access panels - is marked on the template so the stone is cut around it instead of over it. No stone is ever cut from a plan.
A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. The back edge is eased in progressively rather than offered up once and forced. It is the slow part of the day and it should be.
Access. Permit-holder bays fill up from mid-morning and the streets are narrow enough that a parked van blocks a lane. Upper conversion flats are reached by a straight but tight internal stair with a half-landing turn, so long lengths have to be measured against the stairwell diagonal before ordering.
At a glance
- Borough
- Merton
- Postcodes
- SW19
- Covered on
- our south west London run
- Lead time
- 3–7 working days from template
There is nothing to visit in Wimbledon Park. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Wimbledon Park
Six services, ordered by what Wimbledon Park's housing stock actually asks for most.
Nearby
We also work around Wimbledon Park
Questions
Working in Wimbledon Park
Do you fit kitchen worktops in Wimbledon Park?
Yes. The terraces on the streets sloping down to the lake are the classic side-return job: the alley is filled in, the kitchen widens to about 3.6m and takes a long run under a rooflight with a modest island opposite. Where houses are split into upper and lower conversions, the top flat usually keeps a narrow galley in the old back bedroom. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Old tops out and new stone in, both through the same gap.
What kind of kitchens do you usually work on in Wimbledon Park?
Edwardian terrace, Victorian terrace and Purpose-built 1930s flat. Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. That is the shape of the day.
Is access difficult in Wimbledon Park?
Permit-holder bays fill up from mid-morning and the streets are narrow enough that a parked van blocks a lane. Upper conversion flats are reached by a straight but tight internal stair with a half-landing turn, so long lengths have to be measured against the stairwell diagonal before ordering. Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. The fitting day is planned backwards from that point, before anything comes off the van. That is what the morning is planned around.
What do you get asked for most in Wimbledon Park?
Worktop templating, worktop installation and worktop replacement, in that order. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project. Extension floors here are often laid before the units go in and settle unevenly, so the base cabinets need packing and re-levelling on template day or the joint on a long run opens up.
What decides the price of a worktop in Wimbledon Park?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The template records every angle in that shape as it actually is rather than as the plan drew it. One datum for the whole room. Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Dry-lay, mark, cut, then bond. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Wimbledon Park?
A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A half-day of access is not a fitting day, and it is better to say so at booking than to find out at eleven. Access for the whole slot, or a different day. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Wimbledon Park kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.