Waltham Forest · E10 E17

Splashbacks and upstands in Bakers Arms

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

Bakers Arms kitchens

The kitchens we meet in Bakers Arms

We turn down very few splashback jobs in Bakers Arms, but we do insist on seeing the kitchen first, and the reason for that is in the rooms themselves. Terraces off the junction have back-addition kitchens of 2.2m to 2.8m, and the flats above the shopping parade have narrow kitchens fitted along one wall with limited daylight. Many terraces here have been converted to two flats, so kitchens sit in rooms never designed for them. If you are not sure, say so when you get in touch. It is a normal answer and we work with it.

Small, roughly square kitchens with a back door and a window in the middle of the run: short lengths, few joins, and a lot to work around. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Height is taken at the shortest point of the run.

The stair from the street is narrow with a tight turn at the top, which caps piece length well below anything the run itself needs. Patched plaster next to original render sits at different depths, and that step is exactly what an upstand covers. The wall gets made good first or the gap shows.

The buildings themselves are mostly Victorian terrace, flat over shop and post-war infill block. The run length that is easy in one is a join in another.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • flat over shop
  • post-war infill block

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
Borough
Waltham Forest
Postcodes
E10, E17
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Bakers Arms is its own job

When we take on a kitchen in Bakers Arms the first thing we work out is how the stone reaches the room it is going in. The junction is a major bus corridor with red route sections and loading bans, so drops happen on the side streets which are permit-controlled and busy. Above-shop flats have a shared side door, a steep straight stair and no lift, so anything over about 2.2m needs jointing. Rented and converted flats here mean a lot of like-for-like replacements around existing sinks and hobs, so the old top gets measured before it comes out. Better to know it at the design visit than to find out with a slab standing on the pavement.

The work

What worktop splashbacks & upstands involves

Splashbacks and upstands put the same stone on the wall behind your worktop instead of tiles, which takes the grout line out of the kitchen. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

Splashbacks and upstands are the part of the job that takes the grout line out of the kitchen, which is what most people are really asking for when they ask about stone behind the hob. Behind a hob the panel usually rises higher than the rest of the run and stops at the extractor instead of at the units. Wall units in these houses hang low, which keeps a tall sheet down to a manageable size and makes it the cheaper of the two options. Cut from the slab the worktop came out of.

Waterfall ends See the options

The money

What it costs in Bakers Arms

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. The supply rate of £110 to £550 per square metre reads the same for a small kitchen and a large one. Everything that makes them different jobs appears further down the quote. Height is a decision with a figure against it.

Victorian and Edwardian terraces

Bakers Arms in the housing figures

Locally the banding is well below the London middle. The plans vary house by house. Splashbacks are cut from the same slab run as the tops, so the decision has to be made before fabrication starts. Same slab run, same batch.

Victorian and Edwardian terraces

The carry, and what it rules out

Counting hands matters more than counting metres on a staircase, because a piece two people lift off a van still wants three on the flight and a fourth watching the trailing corner. Panels travel on edge in a frame, and the frame needs the same clearance the finished piece does. They stand upright in the van and stay upright until they are on the wall.

Victorian and Edwardian terraces

What Bakers Arms asks for

Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.

Access

Getting stone into a Bakers Arms kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Bakers Arms is covered on our east London run, along with the rest of Waltham Forest.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Bakers Arms

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Bakers Arms on your patch?

Yes. Bakers Arms is on the patch, and the postcodes we work here are E10, E17. It is worked on our east London run, along with the rest of Waltham Forest. A bus lane along the frontage brings its own hours with it, and stopping in one is enforced the same way the red route is. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Wind on an open street matters more than the walk does. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What do the kitchens in Bakers Arms do to worktop splashbacks & upstands?

The structure below is commercial, so the floor is often timber over a shop ceiling and the load path under an island is worth thinking about. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. Solid plaster on brick takes a panel; a hollow wall wants thought. Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Upstands sit tight because both edges are cut.

03

Do you have trouble getting long pieces into Bakers Arms kitchens?

Suction lifters earn their keep on a straight flight and become a liability on a winder, where a handle standing out from the face is one more thing to catch on a wall. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A door frame catches a tall panel long before a short one. The van is not staying on a main road for the day, so once the stone is off it goes and parks properly somewhere else. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Standing a panel on the pavement is the last resort.

04

Do Bakers Arms kitchens ask for worktop splashbacks & upstands much?

Yes, one of the three we see most, with worktop replacement ahead of it. Same visit to template, same workshop, same installers on the day. Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Full height behind the hob is less for a tenant to scrub. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Grout lines are the first thing to fail in a let.

05

What decides the price of a worktop in Bakers Arms?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The run decides where that joint falls. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What do I need to sort out first?

The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A breast return is scribed on three edges. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. Two flats with an identical layout can want entirely different things from the same run of worktop, which is why the quote follows the run rather than the address. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Plastering finishes on somebody else’s timescale.

07

What if the stairs turn too tightly for the stone?

What decides it is not the width of the stairwell but the length of piece that can be turned in it. The alternative to a join is a shorter run, which is usually the wrong thing to trade away. Timber nosings chip under a slipped edge, so the treads are covered along the whole flight rather than only at the landings. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

08

Do the template and the fit happen on the same visit?

Nothing is payable in advance of the template. The template produces a drawing, and the workshop cuts to that drawing once you agree it. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. A chimney breast breaks a panel run regardless of the drawing.

09

Which materials need sealing and which do not?

A seal is not waterproofing. It only buys time to wipe a spill up. No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Working hours are constrained by the business underneath, so noisy work has a window rather than a day. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. A chimney breast breaks the run and the panels follow it.

10

How do you cut out for an undermounted sink?

A Belfast or butler sink has to be installed and at its final height before the template, because the stone is cut to sit on it. We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The panel seam sits over the worktop seam.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Splashbacks and upstands in Bakers Arms, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.