The building, and what it does to the job
On these streets houses are the minority and blocks are the norm. No two kitchens are set out alike. The day is planned backwards from that before anything comes off the van. Protection down before the first piece comes through.
Peninsulas set into a structural opening need the finished opening measured after the steel is cased, because the casing adds 40 to 60mm each side that the architect's drawing ignores.
Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. The piece is offered up, marked, taken back out and cut, and that cycle can run twice before anything is bonded down. A scribe is a cut. It is not an adjustment.
