Getting stone into the room
Cottage streets are narrow, fully permit-controlled and parked solid, with front doors opening straight onto a 1.2m pavement. Ceilings are low and the hall is short, so a slab cannot be swung, it goes in flat and low.
Two people will walk a two-metre piece in through a front door; the same hall with a three-metre piece wants four, purely because nobody can let go halfway. Pieces are staged in reverse fitting order so nothing has to be shuffled around in a tight space. The crew size follows from it.
Some zones are controlled for a short window in the middle of the day and open either side of it, which makes the timing of the visit the whole question. Getting the waste off site is the same question as getting the stone on site, because both go through the same gap on the same day. The strip-out waits until the new stone has somewhere to stand.