Wandsworth · SW8 SW11

Kitchen worktops in Nine Elms

Almost entirely new-build apartment kitchens: handleless slab doors, an integrated appliance wall, and either a straight peninsula or a small island, all built to the developer's original dimensions. Work here is upgrading a builder-grade top to stone or fitting out shell-and-core units rather than reconfiguring rooms.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Arctic Starburst carried round a U-shaped kitchen in pale grey handleless units, pendants over the breakfast bar

The housing stock

What we are usually working with in Nine Elms

Services coming up through a floor slab mean the island cannot move to suit the stone, so the stone is cut to suit the island. The old tops come off in pieces, and what is under them decides whether the units need levelling before anything new goes on. Door fronts and drawers get checked against the new thickness.

Get the goods lift internal dimensions in writing before cutting, because a 2.8m piece that will not stand up in the lift car has to be re-cut at the workshop, not on the loading bay. Every building is managed, loading bay booking, a service lift with a stated internal length, dock time limits and a site induction before anyone goes up. The lift diagonal, not the door, is what limits slab size.

Services run on the surface in these buildings, so conduit and pipework cross the wall behind the units and stand proud of it. The goods lift is often industrial and generous, but the flat entrance and any internal turn into a mezzanine or split level can be tighter than anything in the building, so we walk the full route with a tape before unloading. The building moved decades ago and the fit allows for it.

Most of what we quote on here is 2010s and 2020s high-rise apartment and Converted power station and industrial building. Each of those behaves differently once the old top comes off.

Access. The lift diagonal, not the door, is what limits slab size.

There is nothing to visit in Nine Elms. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Wandsworth
Postcodes
SW8, SW11
Covered on
our south west London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 2010s and 2020s high-rise apartment
  • Converted power station and industrial building

Wandsworth

Getting stone into the room

Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. Moving the van mid-fit costs an hour nobody budgeted.

Nine Elms in the housing figures

Locally the great majority of homes sit in blocks rather than on their own plot. Service voids and boxed pipework turn up in the same places. The old tops have to leave the way the new ones arrive, and a laminate run is easier to remove whole than to carry whole. The kitchen goes back into use the same evening.

Waterfall ends See the options

Nearby

We also work around Nine Elms

Nine Elms is one of 21 places we cover in Wandsworth. Everything in Wandsworth

The whole New Malden patch

Questions

Working in Nine Elms

01

Do you come out to Nine Elms for a worktop?

Yes. Almost entirely new-build apartment kitchens: handleless slab doors, an integrated appliance wall, and either a straight peninsula or a small island, all built to the developer's original dimensions. Work here is upgrading a builder-grade top to stone or fitting out shell-and-core units rather than reconfiguring rooms. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. Everything comes indoors before the loading window closes.

02

What kind of kitchens do you usually work on in Nine Elms?

2010s and 2020s high-rise apartment and Converted power station and industrial building. Many of these kitchens are a fitted pod dropped into open floor, so three sides are free and only the fourth is ever scribed. These read as easy from the outside and rarely are. Nothing is screwed into plasterboard and hoped for.

03

How hard is it to get stone into a Nine Elms kitchen?

Every building is managed, loading bay booking, a service lift with a stated internal length, dock time limits and a site induction before anyone goes up. The lift diagonal, not the door, is what limits slab size. Where only one car serves the building a breakdown on the morning halts the job outright, so the fallback route is worked out at template rather than on the landing. The fitting day is planned backwards from that point, before anything comes off the van. Protection goes down along it first.

04

What do Nine Elms customers usually want done?

Worktop replacement, worktop installation and worktop fabrication, in that order. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Booked at short notice, because the notice is short. Get the goods lift internal dimensions in writing before cutting, because a 2.8m piece that will not stand up in the lift car has to be re-cut at the workshop, not on the loading bay.

05

What makes one Nine Elms kitchen cost more than another?

A downdraught extractor takes a long slot out of the middle of the piece and a motor housing out of the cabinet below it, so what sits under the top is settled before anything is cut. The nest is laid out around that, with joins placed over cabinet gables and kept clear of every cut-out. Every piece is labelled to its place in the run. Encased steel is always bigger than the steel inside it, so the casing is what gets plotted, and a casing is rarely square to the wall it sits against. The template drawing carries the real geometry through to the saw, and the piece is machined to it rather than trimmed to it later. Oversize on the scribe edge, always. Material starts at £110 per square metre supply only, and templating, fabrication and fitting sit on their own lines rather than inside one figure.

06

Are Nine Elms flats a problem for you?

Inventories record the condition of a kitchen at both ends of a tenancy, which is a practical argument for a surface that looks the same in its fifth year as its first. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Wear is what the next inventory records. Let us know the building when you book, and the lift, the stair turn and any freeholder notice are handled beforehand rather than on the fitting day.

07

What if a worktop will not physically fit through the building?

The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. If a piece cannot be got in at all, we say so at the template rather than on the day. Splitting a run costs a join, and that is the price of getting stone into the room at all. A car that answers every floor button pressed while a piece is standing in it needs to be held on the key, and the key usually lives at a desk that wants notice. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. Every piece is staged to it before fitting starts.

08

Do you cut drainer grooves on Nine Elms kitchens?

They are cut with a fall towards the bowl, which is why they cannot be added on site later. The grooves sit inside the depth of the top with stone left either side, so a shallow run limits them. Where there is no room for a separate drainer, grooves are usually what gets specified instead. Concrete or steel overhead means no fixings into the ceiling and no help from the structure for anything hung above the run. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. A thicker top changes what clears the top drawer.

09

Is taking the old top off part of the job?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. If you want the old top kept for a garage or a utility, say so and it stays on site. The template can be taken with the old top still down, which is why one visit covers both. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. A spotter on the van is a man off the tools.

10

Upstands or a full-height splashback?

The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. Socket and switch positions have to be final before templating, because the openings are machined rather than chopped out on the wall. Tiling and stone can meet, but where they meet is decided before the template rather than after. Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. These read as easy from outside and rarely are, because the flat entrance is tighter than the goods lift. Where the wall bellies, the top is eased in against it.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Get your Nine Elms kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.