Belmont kitchens
The kitchens we meet in Belmont
The honest way to talk about splashback and upstand work in Belmont is to talk about kitchens first and worktops second, because one sets the terms for the other. Consistent interwar semis around the circle, mostly still with the kitchen and dining room as separate rooms, and the common upgrade is knocking those two together for a 3.6m run with a breakfast peninsula rather than building outwards. Original serving hatches turn up regularly and get closed off during the refit. The survey answers it, the drawing records it, and you sign off the drawing before a single sheet is cut.
A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. Height is set off the units and the hob, not off the tile line that was there before. Siliconed to the top, never grouted.
The original room is timber over a ventilated void and the newer half is a slab, so the floor gives underfoot on one side of the junction and not on the other. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Solid plaster on brick takes a panel; a hollow wall wants thought.
What we are cutting for, here, is 1930s semi, 1930s parade with maisonettes and post-war infill housing. Each of those puts the services somewhere else, and the cut-outs follow.