Bromley · BR1

Splashbacks and upstands in Bickley

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The whole kitchen from the garden doors, the Enzo island running down the middle towards the ovens

Bickley kitchens

The kitchens we meet in Bickley

Customers looking at splashback and upstand work in Bickley usually want to know two things first: what it will cost and what has to come out to make room for it. Big detached houses with kitchen-diners that were often knocked through from the old scullery and breakfast room, so you get an island of 2.4m or more plus a separate utility and often a boot room. Runs of 4m against a rear wall are normal and second sinks in the utility are common. Guessing at this stage would only put a wrong number in front of you, so we do not do it.

Old flues run inside the wall behind the run, so a deep fixing finds a void about as often as it finds brick. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. A bowed wall gets measured at three heights first.

Arts and Crafts houses have deep eaves, low windows and inglenook recesses, so the kitchen has more corners and reveals than its floor area suggests. Behind a range cooker with gas burners, granite or sintered stone is the sensible pick; quartz has a resin binder and does not enjoy sustained radiant heat at close range, so keep it out of the immediate hob zone or specify a different material for that panel. Dry lining behind a panel needs a fixing plan of its own.

What we are cutting for, here, is late-Victorian villa, Edwardian detached, 1930s detached and 1970s executive detached. None of them is harder than the others; they are awkward in different ways.

Polished stone edge profile close up
  • late-Victorian villa
  • Edwardian detached
  • 1930s detached
  • 1970s executive detached

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
Borough
Bromley
Postcodes
BR1
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Bickley is its own job

The work we do in Bickley has taught us which details to write down at the survey and which to allow extra for. Wide roads, in-and-out gravel drives and generous frontages mean the van gets close to the door, but the front steps on the older villas are often deep and the kitchen sits at the back down a long hallway. The stock here justifies thicker material and mitred waterfall ends, and clients expect the island to be a single piece, so we plan the slab layout around the island first and let the perimeter take the joints. That is why we survey Bickley kitchens first and quote second. Working the other way round is how deposits turn into arguments.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Fitting them is a couple of hours with no water, gas or electricity touched, which is why it usually comes back as a short return visit. Height is taken from the finished surface up to the underside of the wall units, so a stretch with nothing above it has no obvious answer and gets asked about. There is often a window over the sink and another along the run, so the strip becomes four short returns instead of one continuous length. Machined to the room, not trimmed to it.

Edge profiles See the options

The money

What it costs in Bickley

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. A per square metre figure of £110 to £550 describes stone, not a worktop. What turns one into the other is machining and a fitting day, and both are listed as themselves. The cut-outs are counted, not estimated.

period detached houses and villas

What Bickley asks for

A second kitchen or a kitchenette in an annexe is a small job with the same fixed template, fabrication and fitting lines as a large one. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Cut as a set, so one can replace another.

This is not the commonest thing we do here. Worktop fabrication and worktop installation come up more. It is a fact about the local building stock, not about the standard or the price of the work.

period detached houses and villas

Bickley in the housing figures

Around Bickley, the share of homes lived in by their owners is among the larger ones in the capital. The joint to the worktop is siliconed rather than grouted, which matters more in a let property than an owner expects. The height is a decision, not a default.

Access

Getting stone into a Bickley kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Bickley is covered on our south east London run, along with the rest of Bromley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Bickley

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Bickley, or is it a subcontractor?

Yes. Bickley is on the patch, and the postcodes we work here are BR1. It is worked on our south east London run, along with the rest of Bromley. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Distance from tail lift to door is the whole risk here. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

Is there anything about Bickley buildings that catches worktop splashbacks & upstands out?

Handmade brick and lime plaster move visibly along a run, and a straight-cut back edge shows it immediately. These runs are long and often include a range recess, so the splashback is nearly always more than one piece and the joint placement matters, put it in a corner or over a hob centre line, not randomly in the middle of a clear run. Old plaster rarely gives you a flat metre. Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Scribe the top edge too or it stands off.

03

What do you check about the route into a Bickley property?

Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. The panel is sized to the turn, not to the wall alone. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A long carry turns a light piece into an awkward one.

04

Would you call Bickley a worktop splashbacks & upstands area?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop fabrication and worktop installation. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. Where an annexe has been built or converted, its floor and its walls are newer than the main house and behave differently under the same run. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The offcuts finish the room. Extended households run kitchens hard, and that pushes the specification towards granite or sintered stone rather than a light quartz. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Less to clean, for whoever cleans it.

05

Why do two Bickley kitchens the same size price differently?

Island units are rarely fixed to anything at first fix, so they get screwed to the floor and levelled against the perimeter run before the stone is measured at all. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Height is agreed before the cut list closes. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What has to be finished before you can template?

Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The sill caps the upstand before anything else does. The range and extractor must be sited and the window cill finished before the template, as both fix the vertical limits of the splashback. Because the money comes out of a household rather than a maintenance budget, phasing is common: tops now, island or splashbacks later, quoted so the second visit still matches the first. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Two budgets, settled before anything is cut.

07

What happens if a piece will not go up the stairs?

The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. An external stair, a side return or a rear garden counts as carry and is measured the same way. What decides it is not the width of the stairwell but the length of piece that can be turned in it. Carrying through the house means protecting the whole route first: floor boarded, banister padded, and the front door held open on a wedge rather than by hand. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It travels on edge, so the clearance is checked on edge.

08

What if I have already sourced the slab?

Remnants bought elsewhere are the awkward case, because the drawing is then made to fit the stone. Sinks, taps and hobs are yours to buy in any case, and they only have to be in the room for the template. If your own slab breaks there is no matching replacement to hand, and that is the real difference. Two households cooking in one kitchen means two of most things, and the run has to carry a second sink or a second oven without losing its working length. Upstands are the cheapest way to finish several kitchens consistently, and they come out of the offcuts the tops leave behind. Panels for every unit, cut in one go.

09

What is the order of events on a Bickley kitchen?

The template is taken in your kitchen after the units are in and fixed, never before. The design and quotation visit comes first. It is free and carries no obligation. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. Lime plaster on nine inch brick has been patched with gypsum wherever a radiator or a socket has moved, and the two finish at different depths. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Full height needs a flat wall and a finished electrician.

10

What if the units in a Bickley kitchen have moved since they went in?

If the carcasses are corrected, the template is taken again, since a drawing off units that then moved is worthless. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. A downstand sets the panel height, not the wall units.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Splashbacks and upstands in Bickley, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.