The place
Why Bromley Town Centre is its own job
Most of the work of a fit in Bromley Town Centre happens before the van is loaded, in what we have already checked and allowed for. Flats mean loading bays with time limits, a goods lift booking and a building manager to clear it with, and no chance of leaving the van on the High Street. The terraces have no off-street parking and a controlled parking zone, so slabs come off the van at the kerb and go through the house rather than round the side. Half the work is measuring twice for lift dimensions before we cut, because a 3m piece will not go into a lot of these blocks in one length and a joint has to be designed in from the start. Three to seven working days sit between the template and the fit, and everything difficult gets solved in that gap.

