The housing stock
What we are usually working with in Bromley Town Centre
A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Twenty years of settlement is measured, not argued with.
Flats mean loading bays with time limits, a goods lift booking and a building manager to clear it with, and no chance of leaving the van on the High Street. Half the work is measuring twice for lift dimensions before we cut, because a 3m piece will not go into a lot of these blocks in one length and a joint has to be designed in from the start.
There is a solid base under the old scullery end and suspended timber where the addition meets the house, and the two part company along that joint. The old top ran under the tiles, so taking it out brings the bottom course with it and the upstand covers what is left. The building has kept moving; the new template catches up.
What the surveys keep coming back to is Victorian terrace, 1930s semi, 2010s apartment block and office-to-residential conversion. The join count is decided by which of those the room sits in.
Access. The terraces have no off-street parking and a controlled parking zone, so slabs come off the van at the kerb and go through the house rather than round the side.
There is nothing to visit in Bromley Town Centre. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.