Greenwich · SE3 SE7

Splashbacks and upstands in Blackheath Standard

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The whole kitchen from the garden doors, the Enzo island running down the middle towards the ovens

Blackheath Standard kitchens

The kitchens we meet in Blackheath Standard

A survey is where splashback and upstand work in Blackheath Standard stops being a guess, because until someone has stood in the kitchen nobody knows what it is going to ask for. Two very different jobs sit side by side: modest Victorian terraces with back-addition galleys, and the Span-designed 1960s houses around Vanbrugh Park where kitchens are compact, planned to the millimetre and open to the living space through a serving gap. Send through a photograph or two and the rough run length. We will tell you what you are probably dealing with.

Doorways are 762mm at best, and the turn from the hall into the kitchen is the pinch point rather than the front door. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. A chimney breast breaks a panel run regardless of the drawing.

These were built on a solid ground floor slab, so nothing bounces and nothing can be packed down, only up. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. Panels expose a wall; upstands forgive one.

The kitchens we see here sit in Victorian terrace, 1930s semi and 1960s Span estate at Vanbrugh Park. None of them is harder than the others; they are awkward in different ways.

Polished stone edge profile close up
  • Victorian terrace
  • 1930s semi
  • 1960s Span estate at Vanbrugh Park

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
Borough
Greenwich
Postcodes
SE3, SE7
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Blackheath Standard is its own job

A plan drawn off a floor plan will not tell you what a fit in Blackheath Standard actually involves, so we come and look. The Span courtyards are car-free with communal parking set back from the houses, so it is a barrow or carry across paving; the Victorian streets have permit bays and nothing else. On the Span houses keep to slim profiles and modest overhangs, the original joinery and window lines are tight and a chunky mitred edge reads wrong immediately. Everything above is looked at on the free design visit, and none of it is charged for until the template.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. The height is settled first, since a slim upstand and a full sheet up to the wall units are different pieces of work and the wall between them is where the decision shows. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Fitting them is a couple of hours with no water, gas or electricity touched, which is why it usually comes back as a short return visit. Openings in a tall sheet are given a radiused internal corner rather than a square one, because a sharp internal corner in thin material is where a crack begins. These kitchens put the hob and the sink almost within reach of each other, so one sheet covers both and there is nowhere sensible for a seam. Stone behind the hob, not grout.

Edge profiles See the options

The money

What it costs in Blackheath Standard

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Take £110 to £550 per square metre as a floor to reason from rather than a quote, since it covers material alone and every operation is added to it as a named line. Same slab run, and the quote says so.

Victorian and Edwardian terraces

What Blackheath Standard asks for

Common enough here to be routine, though worktop replacement is commoner still. Same lead time, same crew.

Victorian and Edwardian terraces

The building, and what it does to the job

Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. Upstands are scribed along their top edge as well as their bottom, which is slower than it looks and is the reason they sit tight. Scribed along the top edge as well.

Victorian and Edwardian terraces

Blackheath Standard in the housing figures

On the Blackheath Standard streets we cover, almost nothing has gone up in the last fifteen years, which makes the carcass check the first question rather than the last. A window return or a cooker recess turns one panel into several, and that is a fabrication question. Height agreed before anything is cut.

Access

Getting stone into a Blackheath Standard kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Blackheath Standard is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Blackheath Standard

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Blackheath Standard, or just list it?

Yes. Blackheath Standard is on the patch, and the postcodes we work here are SE3, SE7. It is worked on our south east London run, along with the rest of Greenwich. A controlled parking zone means either a visitor permit sorted in advance or a suspended bay, and a suspension is applied for days ahead rather than on the morning. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A panel carried past a live lane gets a second pair of hands. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

02

Is there anything about Blackheath Standard buildings that catches worktop splashbacks & upstands out?

A boiler in a cupboard on the kitchen wall is normal in this stock, and its position is fixed by its flue. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Old walls lean back, and a tall panel shows it. A window board sitting below finished worktop height leaves two choices, drop the top under it or notch the stone around it, and both cost more than a straight run. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The obstruction breaks the length, every time.

03

What do you check about the route into a Blackheath Standard property?

A Victorian hall arch sits lower than the ceiling either side of it, and it is the point a piece carried on edge meets first. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. The panel is sized to the turn, not to the wall alone. Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Nothing this long gets walked while a warden is circling.

04

Is worktop splashbacks & upstands common in Blackheath Standard?

It is one of the three that come up most, though worktop replacement comes up more. Nothing changes between them: same template, same workshop, same installers. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Less to clean, for whoever cleans it. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Panels for every unit, cut in one go.

05

Why do two Blackheath Standard kitchens the same size price differently?

A full-depth tall unit projects past the worktop line, and the run has to be scribed against its side panel instead of carrying on past it. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. External corners are mitred, not butted. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

06

What has to be finished before you can template?

A cill projecting forward of the plaster line pushes the back edge out, and the units then stand off the wall by that amount for the whole length. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A tall panel exposes what an upstand forgives. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Full height is decided before fabrication, not after.

07

Is templating a separate visit from fitting?

A template on a normal kitchen takes two to three hours in the room. The same firm templates and fits. Nobody else is brought in to install. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. Plaster over blockwork is thin and hollow in patches, so anything fixed back to the wall needs a sound spot found first. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Boxed pipework decides the panel width before taste does.

08

Will I have to look after it? What does a Blackheath Standard worktop need?

Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. Marble is the one people underestimate. It is porous, like granite, and wants sealing. Ceiling heights dropped after the war, so there is less wall between the worktop and the wall units than in anything older. Patched plaster next to original render sits at different depths, and that step is exactly what an upstand covers. Sockets in a stud wall move more easily than sockets in brick.

09

Do you take the old worktop away?

On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. The sink and hob are lifted out with the old top and kept aside if you are reusing them. Disposal means it goes in the van, not into the garden to wait for a collection. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. The crate stays on the van until the route in is clear.

10

Is the quote a fixed price or an estimate?

What is quoted is what the drawing says, and the figure does not move unless the drawing does. What moves the figure after templating is a change you make: a different edge, an extra cut-out, a bigger sink chosen late. Plumbing, gas and electrical work are not in the figure, because we do not do them. Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribe the top edge too or it stands off.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Splashbacks and upstands in Blackheath Standard, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.