Greenwich · SE7

Splashbacks and upstands in Charlton

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Charlton kitchens

The kitchens we meet in Charlton

We turn down very few splashback jobs in Charlton, but we do insist on seeing the kitchen first, and the reason for that is in the rooms themselves. Steep streets of Victorian and Edwardian terraces with rear-addition kitchens, plus interwar semis higher up the hill where the kitchen is a small square room off the hall that owners usually open into the dining room. Runs are typically 2.4m to 3m in an L, islands only where a rear extension has gone in. If that sounds like guesswork, it is not: it is measured on the day, in your kitchen, before anything is cut.

Original quarry tile is often still down under two or three later floor coverings, which is why the finished floor height is rarely what anyone expects. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. Twenty millimetres of packing behind a panel is not a fix.

The larder under the stairs is usually still there and still opens into the kitchen, so the run stops at a door that cannot be moved. Where an upstand meets a window reveal the return is mitred rather than butted, so the joint does not open as the wall moves. Solid plaster on brick takes a panel; a hollow wall wants thought.

What the job sheets keep listing is Victorian terrace, Edwardian bay-fronted terrace, 1930s semi and postwar council maisonette. That mix is why two jobs on the same road can run completely differently.

Polished stone edge profile close up
  • Victorian terrace
  • Edwardian bay-fronted terrace
  • 1930s semi
  • postwar council maisonette

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
Borough
Greenwich
Postcodes
SE7
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Charlton is its own job

When we take on a kitchen in Charlton the first thing we work out is how the stone reaches the room it is going in. The roads climb hard from the riverside up to the village and parking on the terraced streets is nose-to-tail; the interwar semis higher up usually have a drive, which changes the job completely. Some of the steepest carries in the borough are here, if the van can't get above the house, budget for pushing a slab up a 1-in-8 pavement. We do not quote Charlton from a plan and a postcode. We come out, we measure, and then we price it.

The work

What worktop splashbacks & upstands involves

Splashbacks and upstands put the same stone on the wall behind your worktop instead of tiles, which takes the grout line out of the kitchen. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

The survey for these pieces is a separate visit with a separate drawing, made after the tops are in and the room has stopped changing. Internal corners are butt-jointed rather than mitred, and the vertical is put where the light does not rake across it. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. The panel clears the extractor before it is machined.

Edge profiles See the options

The money

What it costs in Charlton

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Supply-only material sits between £110 and £550 per square metre, which is one input into the quote rather than the quote. Height is a decision with a figure against it.

Victorian and Edwardian terraces

Charlton in the housing figures

Around Charlton, the council tax banding sits at the bottom of the London range. Ordered later, from a different batch, the match is not reliable where the pieces meet. Cut from the same batch as the surface below.

Victorian and Edwardian terraces

What Charlton asks for

These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. Where a specification names an upstand height we cut to it exactly, because a height that matches across several kitchens is the whole point of naming one. Agreed with whoever is paying for both.

It would be overstating it to call this a speciality on this patch. Worktop replacement and worktop installation are far commoner. None of that changes the survey, the cut list or the fit.

Access

Getting stone into a Charlton kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Charlton is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Charlton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Charlton?

Yes. Charlton is on the patch, and the postcodes we work here are SE7. It is worked on our south east London run, along with the rest of Greenwich. With no scheme to work with there is nothing to book and nobody to ring, so the only levers left are an early arrival and a word with the neighbours. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Wind on an open street matters more than the walk does. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop splashbacks & upstands in Charlton?

Where a side return has been infilled, the join between old brick and new blockwork lands mid-run and the two faces are never in one plane. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. A chimney breast breaks the run and the panels follow it. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail.

03

Is access a problem in Charlton?

The front door is often the cheapest hundred millimetres on the route, because a door lifted off its hinges gives back the width its own thickness was taking. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Break positions are chosen for the carry. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Standing a panel on the pavement is the last resort.

04

Do you get much worktop splashbacks & upstands work in Charlton?

Not really, and there is no sense dressing it up. What the research on this patch actually lists is worktop replacement and worktop installation. That is a statement about the local housing rather than about the work. It gets quoted, cut and fitted exactly as it would anywhere else on the patch. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Full height behind the hob is less for a tenant to scrub. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Grout lines are the first thing to fail in a let.

05

What makes one Charlton kitchen dearer than the next?

Where an overhang is too deep for steel on its own the choice is a leg at the end or a bracket underneath, and a bracket that lands where a knee goes is worse than no bracket at all. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What holds a template up more often than anything else?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Access is arranged through a managing agent or a scheme office rather than with the household directly, so a date gets confirmed once in writing and moving it costs a fortnight. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The wall has to be ready.

07

What if a worktop will not physically fit through the building?

A join added to get stone into the room is a different thing from a join added because the slab ran out, and the quote says which is which. Hoisting through a window is occasionally the answer, and it is a decision made at the template, not improvised on the fitting day. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. An inward-opening door swinging back against the wall leaves less clear opening than the frame measures, and a storm porch in front of it is tighter again. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A tall panel cannot be tilted to clear a turn, so it is sized not to need to.

08

Is taking the old top off part of the job?

What comes out goes by the same route the new stone comes in by, which is why that route is walked before anything is lifted. Take the old tops off yourself if you would rather, and the quote simply carries one line fewer. The carcasses stay. Only the surface changes. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. Handling is where these pieces get damaged.

09

Can a Charlton worktop be done in one piece?

An island often runs in one piece where a wall run cannot. Slabs come in finite sizes, so a long run needs a join whatever the room looks like. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. A corbel on show under an overhang is a decision about how the piece looks from a stool, so it gets settled alongside the edge profile rather than left to whoever fits it. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The run decides where that joint falls.

10

What is the difference between an upstand and a splashback?

An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. If it is a decision for later, say so at the template: the match is a question about the batch. A full-height piece behind the hob has to allow for the extractor, so that gets settled first. A semi has a side passage, and whether it is wide enough to carry a piece flat and turn it in at the back door is the first thing worth measuring. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Where the plaster undulates, the shorter piece wins.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Excellent service and top quality workmanship. The worktop looks absolutely amazing and the attention to detail is impressive. The team was professional, punctual, and very easy to work with. Highly recommended for anyone looking for a premium kitchen worktop! 👌”
Costin RomanGoogle review
★★★★★
“Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5”
Kam 98Google review
★★★★★
“We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer any questions. The new worktops have completely transformed our kitchen and look amazing. Highly recommend Worktop WorX to anyone looking for high quality kitchen worktops, bespoke workmanship, and excellent customer service.”
Gabriel TivadarGoogle review · Laurent Gold sintered stone

Next step

Splashbacks and upstands in Charlton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.