Greenwich · SE3 SE10

Splashbacks and upstands in Westcombe Park

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Westcombe Park kitchens

The kitchens we meet in Westcombe Park

Nearly all the splashback jobs we quote in Westcombe Park start with the same conversation about what is already in the kitchen and what is staying. Wide Edwardian semis and villas with generous rear rooms, most kitchens are already knocked through into the old dining room or extended into the garden, giving long straight runs of 3.5m and up and a genuine island rather than a peninsula. Every quote we write for Westcombe Park starts with somebody looking at the actual run, not with an assumption about what is behind the units.

Gas, waste and later wiring were boxed in against the wall long after the house was built, and that boxing is what the run has to clear. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. Behind the hob is where full height earns its cost.

Ceilings are high in these, so wall unit heights and splashback heights are open choices rather than things the room has already decided. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. The wall build-up sets the depth of the return.

What the surveys keep coming back to is late Victorian villa, Edwardian bay-fronted semi and 1930s detached. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • late Victorian villa
  • Edwardian bay-fronted semi
  • 1930s detached

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
Borough
Greenwich
Postcodes
SE3, SE10
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Westcombe Park is its own job

There is nothing clever about a fit in Westcombe Park going smoothly, only a survey that asked the right things beforehand. Mostly straightforward: wide front paths, off-street parking on a fair number of plots and gently sloping roads down toward the railway, though streets nearest the station fill with commuter parking through the day. This is island country, pieces are big and heavy, so check the floor structure and whether the route round the side of the house beats the hallway. It gets measured, drawn, agreed and priced, in that order, and you sign the drawing off before the workshop puts a blade near the slab.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. Where a run is longer than one sheet will cover, the break is put on a vertical that has a reason to be there, and the two edges are cut as a pair so the seam closes without filler. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

An upstand is a low strip of the same material standing on the worktop against the wall, usually about a hundred millimetres; a splashback carries on up to the wall units or the extractor. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. A hand's width, or all of it.

Waterfall ends See the options

The money

What it costs in Westcombe Park

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. That £110 to £550 per square metre buys the slab and nothing else. Templating, machining, edges, cut-outs and the fitting day are counted and charged one by one. The cut-outs are counted, not estimated.

period detached houses and villas

The carry, and what it rules out

Whether the kitchen sits straight ahead or off a turn at the end of the hall changes the maximum piece far more than the hall width does. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. They stand upright in the van and stay upright until they are on the wall.

period detached houses and villas

Westcombe Park in the housing figures

In this corner of the borough, the inter-war semi is not the local type, so the rear-addition return that defines those houses is uncommon. The same wall build-up comes up again and again, so what works on one holds for the next. Cut to the wall as found.

period detached houses and villas

What Westcombe Park asks for

Honestly, this is not what we do most on this patch. Worktop installation and worktop fabrication come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Access

Getting stone into a Westcombe Park kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Westcombe Park is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Westcombe Park

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Westcombe Park, or just list it?

Yes. Westcombe Park is on the patch, and the postcodes we work here are SE3, SE10. It is worked on our south east London run, along with the rest of Greenwich. A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Distance from tail lift to door is the whole risk here. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop splashbacks & upstands in a Westcombe Park kitchen?

The bay at the front and the back addition at the rear were built to different standards, and the kitchen is nearly always in the weaker of the two. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Nothing goes on a wall that will not hold it. Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. A breast return is scribed on three edges.

03

How would you get a worktop into a property in Westcombe Park?

Boxed-in pipework running along the skirting looks harmless until a loaded trolley has to pass it. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A door frame catches a tall panel long before a short one. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. A long carry turns a light piece into an awkward one.

04

Do you get much worktop splashbacks & upstands work in Westcombe Park?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop installation and worktop fabrication. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Upstands turn batch offcuts into finished rooms. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. The cheap way to make eight kitchens look specified.

05

What moves the number on a quote around here?

Whether it comes off the same slab as the run behind it or needs one of its own is settled by laying both against the usable area of the slab, not by adding the metres up. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Scribe to the wall rather than stretch the panel. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What state does a Westcombe Park kitchen have to be in before you template?

Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Set it proud on a subframe and the gap becomes deliberate. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Whoever manages the block controls the lift booking, the bin store and the visitor parking, and none of that sits in the gift of the household whose kitchen it is. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Full height is decided before fabrication, not after.

07

Will you fit stone onto units that are not level?

The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Levelling belongs in the carcasses, on their own legs and packers. A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes.

08

How much upkeep is a stone worktop?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. Marble is the one people underestimate. It is porous, like granite, and wants sealing. A bay-fronted terrace has a long hall running past the stairs to the kitchen, so the hall turn caps the piece length before the run length does. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The age of the plaster decides the fixing, not the finish.

09

How do you cut out for an undermounted sink?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A tap under a window board still needs room for its handle to lift, which is checked at the template. Two bowls means two cut-outs and a bridge of stone between them, which decides where the sink can go. The offcut taken out of the middle for a hob is a large usable piece, and it is worth deciding early whether it becomes an upstand or goes in the skip. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Tall panels are what push a job into a second slab.

10

What if the stairs turn too tightly for the stone?

A join forced by the route still sits over a gable, so it is no poorer a join for that. If a piece cannot be got in at all, we say so at the template rather than on the day. Where the staircase comes down into the hall the bottom treads project into the width, and nothing about that can be moved for the day. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Splashbacks and upstands in Westcombe Park, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.