Greenwich · SE7

Worktop replacement in Charlton

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Charlton kitchens

The kitchens we meet in Charlton

A survey is where worktop replacement in Charlton stops being a guess, because until someone has stood in the kitchen nobody knows what it is going to ask for. Steep streets of Victorian and Edwardian terraces with rear-addition kitchens, plus interwar semis higher up the hill where the kitchen is a small square room off the hall that owners usually open into the dining room. Runs are typically 2.4m to 3m in an L, islands only where a rear extension has gone in. We would rather find an out of square wall at survey than on fitting day, so the survey is thorough and unhurried.

The rear wall of the addition carries both the back door and the window, which leaves very little unbroken wall for a run to sit against. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. A single day, planned properly.

A semi has a side passage, and whether it is wide enough to carry a piece flat and turn it in at the back door is the first thing worth measuring. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Sound carcasses are the one condition.

What the research records here is Victorian terrace, Edwardian bay-fronted terrace, 1930s semi and postwar council maisonette. The floor datum is the thing that changes most between them.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • Edwardian bay-fronted terrace
  • 1930s semi
  • postwar council maisonette

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Greenwich
Postcodes
SE7
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Charlton is its own job

Half of quoting a kitchen in Charlton is understanding the approach to it, which is why the survey is done in person. The roads climb hard from the riverside up to the village and parking on the terraced streets is nose-to-tail; the interwar semis higher up usually have a drive, which changes the job completely. Some of the steepest carries in the borough are here, if the van can't get above the house, budget for pushing a slab up a 1-in-8 pavement. None of that changes the price once the template is done. The number we agree at the template is the number you pay.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

Most of a replacement happens before any stone is unwrapped, because the removal and what it exposes set everything that follows. Sink and hob are settled before the templater attends, because a change to either changes the cut-outs and cannot be added later. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. Sink and hob settled before the templater attends.

Waterfall ends See the options

The money

What it costs in Charlton

What the old worktop was fixed to matters more to the price than what goes on top of it. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. The strip-out and the disposal are their own lines.

Victorian and Edwardian terraces

Charlton in the housing figures

Across this patch the banding is well below the London middle. A plumber disconnects before we arrive and reconnects after we have gone. Disposal is a line on the quote, not a surprise.

Victorian and Edwardian terraces

What Charlton asks for

Top of what this patch actually needs, ahead of worktop installation.

Victorian and Edwardian terraces

The shape of the run

Waterfall ends are cut in sequence off the length either side of the top so the vein carries down the leg, and that sequence is gone the moment a piece has to be recut. The shape is already there to be measured, which makes the template straightforward and leaves the strip-out as the part that actually needs planning. Where the seam went before is not where it goes now.

Access

Getting stone into a Charlton kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Charlton is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Charlton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Charlton?

Yes. Charlton is on the patch, and the postcodes we work here are SE7. It is worked on our south east London run, along with the rest of Greenwich. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Both loads want the same few metres of kerb. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What do the kitchens in Charlton do to worktop replacement?

The rear room is generous with a chimney breast in one corner, so the run gains a return and two scribed ends whatever the plan drew. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Off in the morning, on by the afternoon. Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The alcove was never square and it still is not.

03

Do you have trouble getting long pieces into Charlton kitchens?

Whether the kitchen sits straight ahead or off a turn at the end of the hall changes the maximum piece far more than the hall width does. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Whether the strip-out is a cut-up job is settled at template. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Half a day of parking buys half a job.

04

Is worktop replacement the job you do most in Charlton?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Old top out Tuesday, tenant in on Friday. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The carcasses have to be sound, because stone is several times the weight of what is coming off. The flat earns nothing while it sits empty.

05

What decides the price of a worktop in Charlton?

Everything on an island is fed from underneath, extraction, a socket run, a hob and sometimes a waste, and each of them wants its hole before the top is bonded down. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Stone wants gables where laminate needed none. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

06

What do I need to sort out first?

The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. This is the commonest reason a replacement turns out to need more than a straight swap. What passed for a fit in chipboard will not pass in stone. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Planned programmes run several kitchens in sequence, so template, fabrication and fitting move as a rolling operation and one uncollected key holds up more than one flat. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Units stay, so the flat is usable that evening.

07

Can I have stone up the wall in a Charlton kitchen?

Socket and switch positions have to be final before templating, because the openings are machined rather than chopped out on the wall. Tiling and stone can meet, but where they meet is decided before the template rather than after. The party wall is the straightest surface in the house and everything else has moved away from it over a century. Carcasses are checked for square and fixed back before a stone top goes on them. The old top hid it; the new one will not.

08

Will I be able to see the joins?

A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. Dark and heavily veined stone shows a join more than a pale even one, which is worth knowing before the slab is picked. An island often runs in one piece where a wall run cannot. Island units are rarely fixed to anything at first fix, so they get screwed to the floor and levelled against the perimeter run before the stone is measured at all. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The strip-out is the part worth planning.

09

How much upkeep is a stone worktop?

A seal is not waterproofing. It only buys time to wipe a spill up. Marble is the one people underestimate. It is porous, like granite, and wants sealing. Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. Each piece is offered up and eased in rather than dropped, because nothing in the room is straight enough to drop into. Same units, straighter line, better surface.

10

Do you take on fitting-only work in Charlton?

Templating, fabrication and fitting are the same three lines whether the stone came from us or from you. Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. Delivery to the workshop has to be arranged and dated, since nothing is nested until it is there. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Old tops out in the morning, new stone down and sealed the same afternoon. Same day, because the void is the whole budget.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Great work, super helpful team. I'd definitely recommend!”
Andreea TanaseGoogle review
★★★★★
“Great experience from this company, I am happy with the materials, fitting and the team.”
Rrahim BratiGoogle review
★★★★★
“Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not only stylish but also feels incredibly durable and practical for everyday use. Cam handled everything from start to finish and made the whole process smooth and stress-free. Professional, reliable, and clearly takes pride in the work. Highly recommend Worktop WorX. We couldn’t be happier with the result!”
Dawid MyszorGoogle review · Capri White

Next step

Worktop replacement in Charlton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.