The building, and what it does to the job
On the Bow Common streets we cover, converted and purpose-built flats make up most of the stock. On a room that size the cut-outs cost more than the area. We plan the strip-out and the carry as one movement so the kitchen is out of use for a day rather than a week. Booked around what the stock actually is.
Kitchens sit one above another on the same line up the block, so the stack a sink joins is shared with the flats above and below it. That suits a full-height piece, because a large flat panel bonded across its back is more stable on concrete than a run of small tiles ever was. Height, returns and sockets, all settled on site.
Boilers and gas meters are frequently mounted in the run, so cut-outs and clearances need agreeing on site before anything is fabricated.
A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. Nothing about it is a discovery on fitting day.
