The housing stock
What we are usually working with in Limehouse
Riser panels, wall boxes and the boiler cupboard sit in fixed positions the developer will not move for a worktop. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. The last piece down is the one nearest the door.
Basin-side buildings have secure gates and some blocks are only reachable across pedestrian bridges, which rules out trolleying and makes it a carry. The main east-west road is a red route with a tunnel approach, so all loading happens on the residential side streets which are CPZ-controlled with tight bays. Waterside flats have balcony thresholds and glazing right at the end of the run, so the last 300mm of the top usually needs a bespoke cut rather than a square end.
Floor-to-ceiling glazing lights the worktop from one side all day, which shows every ripple in a polished surface and every gap at a scribe. The lift is measured before the piece is loaded, and once inside the flat the fitting is quick by comparison. Movement joints in the shell stay movement joints.
The stock behind these kitchens runs to Georgian and Victorian terrace, canal basin apartment block, wharf conversion and post-war estate. The one you have sets the piece length before the kitchen does.
There is nothing to visit in Limehouse. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.