Kingston upon Thames · KT2

Worktop replacement in Canbury

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Canbury kitchens

The kitchens we meet in Canbury

One kitchen in Canbury might take a single run along a back wall and the next an island as well, which is why worktop replacement is never quoted blind. A tight grid of Victorian terraces between the station and the river, nearly all with side-return or full-width rear extensions - a 3.2m run along the flank, a small 1.6m island or a peninsula, and rooflights that make the client want a low-reflectance finish. The quotation visit costs nothing and commits you to nothing. It is also the simplest way to find out which you have.

Ceilings are generous and the rooms are narrow, so the runs are long, the aisle is tight and there is nowhere to stand a slab on edge. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. A single day, planned properly.

The step down from the main house into the addition is commonly a hundred to a hundred and fifty millimetres, which gives the kitchen a different floor datum from the rest of the ground floor. Each piece is offered up and eased in rather than dropped, because nothing in the room is straight enough to drop into. The fabric gets checked while it is open.

What we are cutting for, here, is Victorian terrace, Edwardian terrace, converted riverside works and modern riverside flats. Each of those puts the services somewhere else, and the cut-outs follow.

Polished stone edge profile close up
  • Victorian terrace
  • Edwardian terrace
  • converted riverside works
  • modern riverside flats

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • The new material is guaranteed for 25 years and the labour for five.
  • New stone is fitted five to ten working days after the measure.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
Borough
Kingston upon Thames
Postcodes
KT2
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Canbury is its own job

We are in Canbury most weeks, and it is the building rather than the stone that decides how a job here runs. Narrow gridded streets with parking on both sides and a controlled zone all day, plus a river frontage that limits through routes; front-door carries with a stair newel to negotiate are standard. Extensions here are almost all steel-framed with a glazed rear, so the flank wall is the only true reference line - level off that, not the floor. Every run, cut-out, edge and join goes on its own line of the quote, so you can see exactly what you are paying for.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. The template and the fit are separate visits with three to seven working days between them, so the kitchen is only out of action on the day the old surface comes off. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

A replacement is measured against the kitchen standing in the room today rather than the layout it was fitted to years ago. A bonded stone top is broken down where it sits before it is taken out, because it will not come away from the cabinets whole. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. Sink and hob settled before the templater attends.

Edge profiles See the options

The money

What it costs in Canbury

The saving on a replacement is that you keep the units. The risk is what is found under the old top, and that is checked before a deposit rather than after. A side return gives length rather than width, so the runs are long, the joins are few and the slab has to be used efficiently. Supply-only material is £110 to £550 per square metre. The more useful question is not which end of that you are at, but how many operations the cut list carries. Priced on the kitchen you have, not the one on the plan.

Victorian and Edwardian terraces

Canbury in the housing figures

On the Canbury streets we cover, almost nothing dates from between the wars, which leaves the stock either older or newer and rarely in between. Repeated stock means repeated units, and if they are sound the rest is straightforward. What is behind the old top is checked, not assumed.

Victorian and Edwardian terraces

What Canbury asks for

Infrequent work for this area, though we do it whenever it is asked for. Worktop installation are the commoner calls. Nothing about the method or the standard varies with frequency.

Victorian and Edwardian terraces

The building, and what it does to the job

A brick pier standing into the run divides it in two, and the join goes against the pier where a clear wall would have needed no join at all. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. It is the usual surprise, and it is a known one.

Access

Getting stone into a Canbury kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Canbury is covered on our south west London run, along with the rest of Kingston upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Canbury

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Canbury?

Yes. Canbury is on the patch, and the postcodes we work here are KT2. It is worked on our south west London run, along with the rest of Kingston upon Thames. Applying for a suspension means naming a length of kerb and a date, and moving the date generally means applying for it again. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste leaves with us, so the van has to still be there. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

What is different about worktop replacement in Canbury?

Where the addition is single storey the ceiling follows a lean-to roof, so one side of the room loses height and a full-height panel has a sloping stop. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Old fixings come out of soft brick and better ones go in. Where the structure cannot be cut into, the stone is relieved instead, and a relief that deep changes both the yield off the slab and how the piece is handled. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. It was there long before we were.

03

Is access a problem in Canbury?

Sintered stone at 12mm changes what a staircase can take, because the same run arrives at roughly half the weight of the granite equivalent. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Waste goes out the way the stone came in, so the route stays clear. A suspension is charged by the bay and by the day, so the number of metres asked for is worth getting right the first time. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Both loads want the same few metres of kerb.

04

Do you get much worktop replacement work in Canbury?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop installation. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The carcasses have to be sound, because stone is several times the weight of what is coming off. Chosen against the doors that are staying. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Old tops out in the morning, new stone down and sealed the same afternoon. Old top out Tuesday, tenant in on Friday.

05

What makes one Canbury kitchen dearer than the next?

Side-return kitchens are long and narrow with one outside wall, and the wall the run sits against is often the oldest, least straight surface in the house. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. A corner that was butted can be mitred this time. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What holds a template up more often than anything else?

An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. This is the commonest reason a replacement turns out to need more than a straight swap. The old top hid it. The drawing will not. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. One staircase can serve an owner on the first floor and a managed tenancy on the second, so the access arrangement changes at every landing while the building stays the same. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Void periods do not extend to suit a lead time.

07

What is the order of events on a Canbury kitchen?

The template is taken in your kitchen after the units are in and fixed, never before. A template on a normal kitchen takes two to three hours in the room. The same firm templates and fits. Nobody else is brought in to install. Suspended timber floors flex underfoot, and anything that moves beneath a unit shows up later as a lipped join. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. What comes off tells you what goes on.

08

Is one material less trouble than another for a Canbury kitchen?

Sealing is the one maintenance job that genuinely differs by material, and it is worth knowing which you are buying before the slab is chosen. No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. A seal is not waterproofing. It only buys time to wipe a spill up. Original quarry tiles survive under a later vinyl in many of these, and lifting the units off them shows how far the floor has fallen towards the garden end. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. Everything the last fit ignored is visible for a morning.

09

Is the quote a fixed price or an estimate?

The quote is written from the template drawing. Before that it works from what you have described. Ask for the lines rather than the total. One number for a kitchen tells you nothing you can check. The edge profile is its own line, so a shaped edge and a square one are two different figures. Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. We would rather find it at template than on the morning, which is why the templater looks behind the units. Nothing about it is a discovery on fitting day.

10

What is the difference between an upstand and a splashback?

If it is a decision for later, say so at the template: the match is a question about the batch. Tiling and stone can meet, but where they meet is decided before the template rather than after. An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. The outrigger shares a party wall with the addition next door for its whole length, so one long side of the kitchen is solid brick with another kitchen on the far side of it. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. The shell is the constant here; the surface is not.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review

Next step

Worktop replacement in Canbury, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.