Bexley · DA1

Splashbacks and upstands in Crayford

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Crayford kitchens

The kitchens we meet in Crayford

Nine times out of ten the splashback jobs in Crayford that go smoothly are the ones where somebody asked awkward questions about the room at the start. Terraces built for the works have small back-addition kitchens under 2.5m with a yard door, the interwar estates above the town have the usual rear kitchen and dining room, and the newer riverside flats have compact open-plan runs with a peninsula. Whichever of those your kitchen turns out to be, the job in Crayford runs the same way: survey, template, fit.

These read as easy from the outside and rarely are, since the flat entrance is often tighter than the goods lift. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. A bowed wall gets measured at three heights first.

Steel columns and downstands land where the frame put them, which is frequently in the middle of what would otherwise be a clean run. Scribing to brick means relieving the back of the panel, and that is worth doing only where the wall has a consistent plane. The wall makes that decision, not the brochure.

The buildings themselves are mostly Victorian industrial workers terrace, 1930s semi, postwar council estate and 2000s riverside flats. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • Victorian industrial workers terrace
  • 1930s semi
  • postwar council estate
  • 2000s riverside flats

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
Borough
Bexley
Postcodes
DA1
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Crayford is its own job

We are in Crayford most weeks, and it is the building rather than the stone that decides how a job here runs. The town is split by the main road and the river, with a steep hill up from the high street and terraced streets parked nose-to-tail; the riverside blocks have their own gated parking. The old works terraces have very low ceilings in the rear addition, check head height over the run before specifying tall upstands or a splashback. The point of the free visit is that we see the Crayford job for ourselves rather than guessing at it from an email.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with a wall that gets wiped down in the same pass as the worktop, because it is the same material carrying on upward rather than a different one starting.

An upstand is a low strip of the same material standing on the worktop against the wall, usually about a hundred millimetres; a splashback carries on up to the wall units or the extractor. Height is taken from the finished surface up to the underside of the wall units, so a stretch with nothing above it has no obvious answer and gets asked about. Exposed brick is the reason people buy these flats and the reason a tall sheet stops where it does, because stone will not lie flat over it. Machined to the room, not trimmed to it.

Waterfall ends See the options

The money

What it costs in Crayford

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. Priced by the edge and the openings, not the wall.

warehouse and wharf conversions

What Crayford asks for

The housing on this patch does not throw up much of this. It throws up worktop replacement and worktop fabrication. When it does come up, it gets the same template, the same bench and the same crew.

warehouse and wharf conversions

Crayford in the housing figures

Around here the banding is well below the London middle. Splashbacks are cut from the same slab run as the tops, so the decision has to be made before fabrication starts. Cut from the same batch as the surface below.

warehouse and wharf conversions

The carry, and what it rules out

Estate roads are often too tight for a long-wheelbase van to turn, so the carry starts a good deal further from the door than a map suggests. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Panel size is checked against the tightest point rather than the average one.

Access

Getting stone into a Crayford kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Crayford is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Crayford

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Crayford, or just list it?

Yes. Crayford is on the patch, and the postcodes we work here are DA1. It is worked on our south east London run, along with the rest of Bexley. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What do the kitchens in Crayford do to worktop splashbacks & upstands?

The goods lift is generous and the flat entrance often is not, so the tightest point on the route is inside the flat rather than in the building. Exposed brick is the defining issue: the face is uneven by 10mm or more across a bay, so a stone splashback either scribes to it, which means the back of the panel has to be relieved, or it is deliberately set proud on a subframe with a shadow reveal all round. Cut from the same slab run as the tops. Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The sill caps the upstand before anything else does.

03

Do you have trouble getting long pieces into Crayford kitchens?

Sign-in at the gate, a permit on the dash and a named contact are usually wanted before anything comes off the van. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. They come in last so nothing is carried past them. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three.

04

Would you call Crayford a worktop splashbacks & upstands area?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop replacement and worktop fabrication. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Grout lines are the first thing to fail in a let. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Six kitchens, one socket layout, one panel drawing.

05

What decides the price of a worktop in Crayford?

The free end is what needs deciding early: square edge, mitred apron down the end, or a full waterfall to the floor, and a waterfall is cut in sequence off the same part of the slab. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. A joint behind a tap is a joint on show. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What do I need to sort out first?

Casement handles and stays swing down into the space above the worktop, so the clearance that counts is the one measured with the window open. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A downstand sets the panel height, not the wall units. Decide and build the backing method, scribe, subframe or board, before the template, because the templater is measuring to that face and not to the brick. Planned programmes run several kitchens in sequence, so template, fabrication and fitting move as a rolling operation and one uncollected key holds up more than one flat. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Upstand height taken from the specification.

07

Where will the joins be?

What you get is a line rather than a step, because the pieces are levelled to each other first. A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. Join count is a question about slab size and run length, nothing else. Peninsulas frequently land on a lightweight partition or on units that were never fixed down, and stone needs proper support under it before it goes on. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Panels come off the same slab area as the run.

08

What happens between the template and the fitting day?

Nothing is payable in advance of the template. Between the template and the fit the slab is nested, cut, mitred and dry-assembled on the bench, which is work you never see and is most of the wait. The design and quotation visit comes first. It is free and carries no obligation. Services coming up through a floor slab mean the island cannot move to suit the stone, so the stone is cut to suit the island. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Full height needs a flat wall and a finished electrician.

09

Will you fit stone onto units that are not level?

An island is where this usually shows, standing free with no wall to level against. Levelling belongs in the carcasses, on their own legs and packers. Packing takes up small variation. It is not there to hide something that belongs in the units. A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Behind the boxing it becomes two pieces.

10

What do you need from me for the sink and hob cut-outs?

Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Because a peninsula is seen from both sides, the underside of any overhang gets the same edge treatment as the top, which is easy to leave out of a spec. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Window reveals take a piece of their own.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Splashbacks and upstands in Crayford, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.