Bexley · DA1

Worktop replacement in Crayford

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The same kitchen from the doorway, Arctic Starburst turning both corners past the induction hob to the tall units

Crayford kitchens

The kitchens we meet in Crayford

Two kitchens a street apart in Crayford can turn worktop replacement into two quite different pieces of work, which is why nothing is priced from the doorstep. Terraces built for the works have small back-addition kitchens under 2.5m with a yard door, the interwar estates above the town have the usual rear kitchen and dining room, and the newer riverside flats have compact open-plan runs with a peninsula. Ask for the design and quotation visit. It is free, it carries no obligation, and it settles all of this properly.

The original openings were sized for goods, but the residential doors dropped into them were not. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. Units checked before stone goes on them.

Windows are large industrial openings with deep sills, and a run finishing at one meets a reveal a full brick deep. Where brickwork bows enough that a full-depth piece cannot go back tight, the units move forward and the front overhang changes. What the last fitter did to the wall shows up on strip-out.

The kitchens we see here sit in Victorian industrial workers terrace, 1930s semi, postwar council estate and 2000s riverside flats. The wall build-up is different in each, and the scribe follows the wall.

Polished stone edge profile close up
  • Victorian industrial workers terrace
  • 1930s semi
  • postwar council estate
  • 2000s riverside flats

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Bexley
Postcodes
DA1
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Crayford is its own job

Fitting stone in Crayford is a question of what the building will allow, and we would rather find that out early. The town is split by the main road and the river, with a steep hill up from the high street and terraced streets parked nose-to-tail; the riverside blocks have their own gated parking. The old works terraces have very low ceilings in the rear addition, check head height over the run before specifying tall upstands or a splashback. That is the sort of thing we come and look at in Crayford before we quote, not after you have committed.

The work

What worktop replacement involves

Replacement suits a kitchen that works but has a surface past saving, burnt, swollen at the joints, or lifting where water has found its way into the board underneath. We take the old surface off, check the carcasses are sound and level, and fit the new tops the same day. Disposal of the old worktop is a separate line on the quote rather than folded into the price. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

Replacement is the job where the tiling, the sink and the wall behind them all get settled at the same time as the worktop. Laminate lifts light and long, so the difficulty is turning a three-metre length in a small room rather than carrying its weight. Runs are long and open, so the old top comes out in fewer pieces than usual and needs more hands to move. You keep the kitchen; only the top is new.

Edge profiles See the options

The money

What it costs in Crayford

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. The spread from £110 to £550 per square metre is the width of the catalogue rather than vagueness about price, and where you land in it is a decision about material. No surprises pulled out from under the old top.

warehouse and wharf conversions

Crayford in the housing figures

Taken across Crayford and the roads either side of it, upper-band homes are rare in the stock. The units stay and only the surface changes, so the whole job turns on what the carcasses will take. A strip-out, not a refit.

warehouse and wharf conversions

What Crayford asks for

Consent for the work sits with the freeholder or the managing body, and getting it in writing first avoids a crew arriving to a locked door. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Void periods do not extend to suit a lead time.

More of our week goes on this than on worktop fabrication put together.

Access

Getting stone into a Crayford kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Crayford is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Crayford

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Crayford?

Yes. Crayford is on the patch, and the postcodes we work here are DA1. It is worked on our south east London run, along with the rest of Bexley. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Half a day of parking buys half a job. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

Why would worktop replacement in Crayford be any different from anywhere else?

Services run on the surface in these buildings, so conduit and pipework cross the wall behind the units and stand proud of it. Converted warehouses put the kitchen against original brick or blockwork that has never been made flat, so scribes of 15 to 20mm along a run are normal and every piece is templated to the wall exactly as it is rather than to a drawing. The units have settled with the floor and get re-levelled. Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. This is the commonest reason a replacement turns out to need more than a straight swap. What is behind the old top decides the day.

03

What is the carry like in Crayford?

Where the parking court sits behind the block the carry crosses open ground and gets boarded, because loaded trolleys and block paving do not agree. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Old material is stacked outside rather than left along the route. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The carry happens twice here, so the distance counts twice.

04

Is worktop replacement the job you do most in Crayford?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop fabrication. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Same day, because the void is the whole budget. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The carcasses have to be sound, because stone is several times the weight of what is coming off. Repairable in place beats replaced whole.

05

Where does the money go on a Crayford worktop?

Peninsulas frequently land on a lightweight partition or on units that were never fixed down, and stone needs proper support under it before it goes on. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Joins move onto the gables this time round. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What needs to be ready before you come to Crayford?

A window board sitting below finished worktop height leaves two choices, drop the top under it or notch the stone around it, and both cost more than a straight run. We would rather find it at template than on the morning, which is why the templater looks behind the units. The beading was covering a bowed wall. Book the goods lift and loading bay for the day, clear a straight route through the open plan, and have a plumber on hand for the island services coming up through the floor. These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Strip-out and fit inside one access window.

07

What happens when the route into a Crayford kitchen is tighter than the worktop?

If a piece cannot be got in at all, we say so at the template rather than on the day. Where there is a lift, whether it can be booked out and padded matters as much as its size. Booked delivery windows on a managed estate run to an hour, and a worktop install does not happen inside an hour. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. Whether the strip-out is a cut-up job is settled at template.

08

Do you cut drainer grooves on Crayford kitchens?

The bowl position has to be settled before templating, since the grooves are set out from it. Which side of the bowl they go is about how you stand at the sink, and it is settled before cutting. Painted brick is flat nowhere, and raked-back mortar joints leave a line no straightedge agrees with. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Whatever the old top hid comes to light.

09

Is templating a separate visit from fitting?

Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. The template is taken in your kitchen after the units are in and fixed, never before. Exposed brick and steel is the whole job here, because neither of them presents a flat plane to scribe to. Taking the old tops off is also the first honest look at what has been going on underneath them. Same carcasses, straighter lines.

10

How many joins will a Crayford kitchen need?

Slabs come in finite sizes, so a long run needs a join whatever the room looks like. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. There are only ever a few legal positions, and the one taken is furthest from the light. Because a peninsula is seen from both sides, the underside of any overhang gets the same edge treatment as the top, which is easy to leave out of a spec. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The return is remeasured even where it looks unchanged.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Worktop replacement in Crayford, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.