Bexley · DA8

Worktop replacement in Slade Green

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Slade Green kitchens

The kitchens we meet in Slade Green

Nine times out of ten the replacements in Slade Green that go smoothly are the ones where somebody asked awkward questions about the room at the start. Flat marshland ground with railway-era terraces and postwar estate housing; kitchens are narrow rear rooms of about 2m by 3m with a back door, and most jobs are like-for-like replacements rather than extensions. Photographs of the run and a rough length are usually enough for us to say which of those you are looking at.

Ceilings are generous and the rooms are narrow, so the runs are long, the aisle is tight and there is nowhere to stand a slab on edge. Taking the old tops off is also the first honest look at what has been going on underneath them. A thicker top changes what clears the top drawer.

Rear rooms of this date have a wide sash or a pair of garden doors, so a good deal of the wall the run wants is glass. Carcasses are checked for square and fixed back before a stone top goes on them. A replacement is measured against the walls as they are now.

The stock we template in here is Edwardian railway workers terrace, postwar council estate, 1960s-70s terrace and 2000s infill. The one you have sets the piece length before the kitchen does.

Undermounted sink cut-out in a quartz worktop
  • Edwardian railway workers terrace
  • postwar council estate
  • 1960s-70s terrace
  • 2000s infill

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Templating happens in the room, and it is the measurement everything else is cut from.
  • A run longer than a single slab arrives in pieces, with a join between them.
  • Up to four quartz samples are posted free before you commit to a colour.
Borough
Bexley
Postcodes
DA8
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Slade Green is its own job

Working in Slade Green regularly means we plan for what catches people out here rather than finding it on the day. Level throughout with wide estate roads and generally free parking, but the area is hemmed in by the railway and the marshes so there are few routes in and satnav often sends vans the long way round. Easy parking, but these houses sit on soft ground and the floors move, always recheck the units are level before templating. Whatever the building does to a straight line, it is measured on the template and drawn before anything is cut.

The work

What worktop replacement involves

A replacement is quoted the same way as a new kitchen: material per square metre supply-only, with templating, fabrication and fitting each written on their own line. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

A replacement is priced in three parts: the new stone, the work of taking the old top out, and carting it away afterwards. Tiles bedded on the old top tend to come away with it, so the bottom two courses are taken off deliberately rather than left to break. A kitchen in one of these has been re-fitted at least twice already, and every fit left something behind under the top. Support goes in before the weight does.

Sink cut-outs See the options

The money

What it costs in Slade Green

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. A per square metre figure of £110 to £550 describes stone, not a worktop. What turns one into the other is machining and a fitting day, and both are listed as themselves. The strip-out and the disposal are their own lines.

Victorian and Edwardian terraces

Slade Green in the housing figures

On the Slade Green streets we cover, the council tax banding sits at the bottom of the London range. Every room starts from scratch as a result. A heavier surface may need the cabinets braced, which is settled once the old laminate is lifted. No gap in the kitchen overnight.

Victorian and Edwardian terraces

What Slade Green asks for

Residents are given written notice before anyone attends, and that notice period rather than the workshop is what governs the earliest sensible start. A plumber disconnects before we arrive and reconnects after we leave, and that is worth booking early. Owners phase this work; a void period cannot.

If one job keeps us on this patch, it is this one.

Access

Getting stone into a Slade Green kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Slade Green is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Slade Green

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Slade Green?

Yes. Slade Green is on the patch, and the postcodes we work here are DA8. It is worked on our south east London run, along with the rest of Bexley. A skip, a delivery lorry or a run of scaffolding takes the frontage the van needed, so the street is worth a look the day before rather than on the morning. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Nothing goes out until the route back to the van is clear. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

02

What do the kitchens in Slade Green do to worktop replacement?

Internal walls are lath on timber studs while the flank walls are brick, so two walls in the same kitchen take a fixing completely differently. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Chipboard that has taken water will not take stone. Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. This is the commonest reason a replacement turns out to need more than a straight swap. Nothing about it is a discovery on fitting day.

03

Do you have trouble getting long pieces into Slade Green kitchens?

Sign-in at the gate, a permit on the dash and a named contact are usually wanted before anything comes off the van. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The van stands for both movements, not just the delivery. Where parking runs down both sides the road is left as a single lane, and a van standing in it has to be somewhere it does not stop a bin lorry. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The old tops leave in one movement rather than piece by piece.

04

Do you end up doing worktop replacement more than the rest in Slade Green?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop fabrication. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. The flat earns nothing while it sits empty. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The carcasses have to be sound, because stone is several times the weight of what is coming off. Same day, because the void is the whole budget.

05

What decides the price of a worktop in Slade Green?

A window at one end and a doorway at the other means one end of the run is lit from behind and the other is interrupted, so the two ends of the same length behave differently. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Any overhang gets underpinned first. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What do I need to sort out first?

Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate was scribed thin. Stone cannot be. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. A leaseholder paying for their own kitchen inside managed stock still needs the freeholder to consent, and that consent is about the building and the common parts rather than about the worktop. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. The gap between tenancies is the whole window.

07

What if the base units are out of level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. An island is where this usually shows, standing free with no wall to level against. Units have to be fixed down as well as levelled. A loose carcass moves under stone. A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. What is behind the old top decides the day.

08

Can you machine drainer grooves into the stone?

Grooves are machined into the surface rather than applied to it, so there is nothing to come loose later. Grooves are machined in the workshop at the same time as the bowl cut-out, because they cannot be done well in a kitchen. Suspended timber floors flex underfoot, and anything that moves beneath a unit shows up later as a lipped join. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. The units are relevelled before anything new is bedded.

09

How do you cut out for an undermounted sink?

Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. Two bowls means two cut-outs and a bridge of stone between them, which decides where the sink can go. The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. The two runs are rarely the same length, and the shorter one often carries the sink, which puts the cut-outs in the piece with the least material to spare. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The shape is measured again, not copied off the old top.

10

When do I pay for a Slade Green worktop?

The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. The beading was covering a bowed wall.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Worktop replacement in Slade Green, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.