Richmond upon Thames · TW2 TW11

Splashbacks and upstands in Fulwell

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Fulwell kitchens

The kitchens we meet in Fulwell

What splashback and upstand work actually involves in Fulwell depends on what you are fitting into, and around here that is not one thing. Consistent interwar semis backing onto the golf course and playing fields, most with a rear kitchen extended by 2m to 3m to create a kitchen-diner with a 4m run down one side and a low breakfast bar rather than a full island. We would rather find the awkward corner now than on the day the stone arrives in Fulwell, so the survey looks at everything.

These were built with a coal store and an outside lavatory off the back, and where those got absorbed into the kitchen the walls around them are thinner and later. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Full height needs a flat wall and a finished electrician.

The scullery floor was quarry tile bedded on concrete and it is often still under a laminate, sitting lower than the boards in the room it now joins. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Old walls lean back, and a tall panel shows it.

Around here the stock is 1920s and 1930s semi, 1930s detached, postwar infill and modern close. They were built to different tolerances, and the stone has to absorb that.

Worktop join finished flush against a wall
  • 1920s and 1930s semi
  • 1930s detached
  • postwar infill
  • modern close

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Richmond upon Thames
Postcodes
TW2, TW11
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Fulwell is its own job

A firm that has not worked in Fulwell tends to find out about the access on the morning of the fit, which is too late to change anything. Quiet, wide roads with driveways and garages, easy van access and space to open the tailgate on the plot; the level crossing at the station is the only regular hold-up. Extension floors here are usually a new slab butted to the old suspended floor, so expect a step and set the kitchen level off the units. Fitters who templated the room turn up to fit it, which is why the awkward bits are already accounted for.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with a joint that stays closed. It is siliconed rather than filled hard, so the wall and the surface can move against each other without opening a crack.

Fitting them is a couple of hours with no water, gas or electricity touched, which is why it usually comes back as a short return visit. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. These kitchens were pushed into the side return at some point, and the seam between original brickwork and newer plaster falls exactly where a tall sheet wants to sit. A hand's width, or all of it.

Corners and joins See the options

The money

What it costs in Fulwell

It is priced as its own item so you can see what removing the grout line actually costs before deciding. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. Quoted as its own item, so the grout line has a price.

1930s and inter-war semis

Fulwell in the housing figures

Taken across Fulwell and the roads either side of it, the share of homes lived in by their owners is among the larger ones in the capital. The joint to the worktop is siliconed rather than grouted, which matters more in a let property than an owner expects. The joint line is planned, not discovered.

1930s and inter-war semis

What Fulwell asks for

The housing on this patch does not throw up much of this. It throws up worktop installation. When it does come up, it gets the same template, the same bench and the same crew.

1930s and inter-war semis

The carry, and what it rules out

A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. Standing a panel on the pavement is the last resort.

Access

Getting stone into a Fulwell kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Fulwell is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Fulwell

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Fulwell, or is it a subcontractor?

Yes. Fulwell is on the patch, and the postcodes we work here are TW2, TW11. It is worked on our south west London run, along with the rest of Richmond upon Thames. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

02

Is there anything about Fulwell buildings that catches worktop splashbacks & upstands out?

The classic arrangement is the original back room with a later extension bolted onto it, so the kitchen is two ages of building in one room. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Sockets in a stud wall move more easily than sockets in brick. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail.

03

What do you check about the route into a Fulwell property?

Even an easy kerbside carry wants the pavement clear at the tail lift, because a three-metre piece on edge has a swing radius nobody expects until it is swinging. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. The panel is sized to the turn, not to the wall alone. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three.

04

Is worktop splashbacks & upstands what Fulwell is known for?

Not really, and claiming otherwise would cost nothing and mean nothing. What the research on this patch actually lists is worktop installation. It reflects the local housing rather than any difference in the work. It is quoted, cut and fitted here the same way it is anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets move on site far more often than plans do. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The extension electrician finishes after the drawing did.

05

Why do two Fulwell kitchens the same size price differently?

Peninsula tops are often the longest single piece in the kitchen, so if anything in the layout is going to force a second slab it is generally this one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Panels come off the same slab area as the run. Material alone is £110 to £550 per square metre, and templating, fabrication and fitting are never folded into that figure.

06

What has to be finished before you can template?

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed, dubbed out, or set proud. Pick one. The old tiling must be off and the wall made good and dry before templating, not on fitting day. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Committed early or dropped early, not left open.

07

What is the order of events on a Fulwell kitchen?

Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. The same firm templates and fits. Nobody else is brought in to install. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. The extension slab was poured to its own level, so there is a lip or a ramp where the new floor meets the original one. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. An upstand asks less of old plaster than a panel does.

08

What happens if a piece will not go up the stairs?

Splitting a run costs a join, and that is the price of getting stone into the room at all. If a piece cannot be got in at all, we say so at the template rather than on the day. A level threshold with hard standing outside it is the one arrangement where a full run goes in without a single re-grip. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It travels on edge, so the clearance is checked on edge.

09

What if the units in a Fulwell kitchen have moved since they went in?

Where a run meets an appliance, level decides whether that appliance door still clears the stone above it. An island is where this usually shows, standing free with no wall to level against. Small variation is taken up by packing under the top on the fitting day. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. The obstruction sets the joint, not the wall.

10

What if a piece cracks while it is being carried in?

Door frames and the stair route are protected too, since most contact happens on the way in. The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. Floors and units are protected before anything comes through the door. The tail lift is still the pinch point, because the piece has to be walked off it onto the trolley while it is sitting at chest height. Panels travel on edge in a frame, and the frame needs the same clearance the finished piece does. Break positions are chosen for the carry.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Splashbacks and upstands in Fulwell, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.