Bromley · BR6

Worktop installation in Green Street Green

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Green Street Green kitchens

The kitchens we meet in Green Street Green

Homeowners tend to arrive at worktop installation in Green Street Green with a picture saved on a phone and no clear sense of what their own kitchen will allow. Post-war detached and link-detached with integral garages, so the kitchen usually backs onto the garage and the utility is a converted garage corner with a second worktop run. Kitchens are moderate size, typically an L plus a peninsula, and clients often want the garage side made into a proper laundry. The tape measure decides it, not the description above, and not anything anybody says over the telephone.

A boiler hangs on the wall above the run in most of these, and its pipework drops exactly where a splashback wants to go. The fitting day is planned backwards from all of it, before the first piece comes off the van. One visit, our own installers.

The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Access is generally through the front door and a short straight hall into the kitchen, which is a good deal kinder than a Victorian terrace, though rear access through a back garden or shared path is often the better route if it exists. The house sets the order of work.

What we are cutting for, here, is 1960s detached, 1970s link-detached, 1980s cul-de-sac housing and bungalow. None of them is harder than the others; they are awkward in different ways.

Polished stone edge profile close up
  • 1960s detached
  • 1970s link-detached
  • 1980s cul-de-sac housing
  • bungalow

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • We arrive five to ten working days after the measurements are taken.
  • An overhang longer than about 300mm is carried on steel or a bracket, not on the stone alone.
  • The installers are ours, on our payroll, rather than a crew booked in for the day.
Borough
Bromley
Postcodes
BR6
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Green Street Green is its own job

The reason we survey rather than work from a drawing is that a drawing tells you nothing about getting into a kitchen in Green Street Green. Cul-de-sac layouts with turning heads, so the van can get right to the door, but garage-side entrances have a step and a fire door that limits swing. Utility runs in converted garages sit on a different floor level to the kitchen, so we template the two areas as separate jobs even when it is one continuous cabinet line on the drawing. We put it in writing at the quote, and the workmanship is guaranteed for five years after we have fitted it.

The work

What worktop installation involves

Installation is the fitting day. The pieces arrive cut, polished and finished, and they are levelled, joined and sealed in your kitchen by our own installers rather than by a subcontracted crew. How long the day takes is a function of how many pieces there are and how far each has to travel through the house, which is why it is quoted as a day rather than by the hour. You end up with the fitting day behind you in one go. There is no second appointment for a piece that did not fit and no trades left waiting on each other to come back.

The whole run is dry-laid before anything is fixed, so the levels, the wall line and the joins are all agreed while they can still be changed. Joins are drawn together with clamps and set flush, then cleaned off before the resin goes hard rather than sanded back afterwards. Runs are short and the cut-outs are close together, which puts most of the work into a small span. You get a fitted worktop, not a delivery.

Edge profiles See the options

The money

What it costs in Green Street Green

An access-driven join is priced like any other join, and it is the one people are most surprised to see on a straight run. An L has a return, and a return rarely nests neatly on a slab, so the yield question arrives earlier than it does on a straight run. That £110 to £550 per square metre buys the slab and nothing else. Templating, machining, edges, cut-outs and the fitting day are counted and charged one by one. The day is priced from the route, not from the room.

period detached houses and villas

Green Street Green in the housing figures

Around here the stock is houses, with hardly a block among them. No two kitchens are set out alike. A long carry is booked as a two-man job from the outset, not upgraded on the doorstep. One visit, our own fitters.

period detached houses and villas

What Green Street Green asks for

The surveys on these streets come back to this more often than to worktop replacement.

period detached houses and villas

The carry, and what it rules out

A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Two men and a long carry is a different day from two men and a drive, and the crew is sized on that. A booked bay only helps if it is empty when we arrive.

Access

Getting stone into a Green Street Green kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Green Street Green is covered on our south east London run, along with the rest of Bromley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Green Street Green

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Green Street Green on your patch?

Yes. Green Street Green is on the patch, and the postcodes we work here are BR6. It is worked on our south east London run, along with the rest of Bromley. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The clock on the bay runs whether the lift is free or not. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

02

Is there anything about Green Street Green buildings that catches worktop installation out?

Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. The fitting itself is about squaring up to walls that look modern and are not: block or breeze walls with a skim that has been patched over decades, so we still dry-lay and scribe rather than trust the template edge. Levelled first, then set, then sealed. A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Dry-lay, mark, cut, then bond.

03

What do you check about the route into a Green Street Green property?

Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. The fitting day is planned backwards from that point, before anything comes off the van. We would sooner lift a gate off its hinges than force a piece past it. A shared drive is only useful if the neighbour is not the one parked behind the van, so we ask which side the standing belongs to before the date is set. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. Slack in the day gets spent on the street or on the fit.

04

Is Green Street Green mostly worktop installation work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop replacement. Kitchens go in near the end of a conversion, behind the plastering and the flooring, by which point the programme has already absorbed whatever slipped earlier. The fitting day is scheduled to suit that rather than to suit the diary. A missing sink stops eight kitchens, not one. Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. Back-to-back slots need every flat ready on the first day.

05

Why do two Green Street Green kitchens the same size price differently?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Steel under the overhang before stone goes near it. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

06

What has to be finished before you can template?

Where two pieces meet over a fall in the floor the join has to be flush to the hand as well as true to the level, because the eye reads the join and forgives the room. Rushing that is what leaves a gap you look at every morning for fifteen years. Eased in, never forced. Unlock any rear or shared path gate and clear both the hall and the back approach so we can choose the better route on the day. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. The fitting day is arranged with whoever can actually give us access for the whole slot. The signature at the end belongs to somebody with authority.

07

What is the order of events on a Green Street Green kitchen?

The template is taken in your kitchen after the units are in and fixed, never before. Nothing is measured until the sink, the tap and the hob are in the room to measure against. The same firm templates and fits. Nobody else is brought in to install. Doorways are 762mm at best, and the turn from the hall into the kitchen is the pinch point rather than the front door. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. The route is walked before the first lift.

08

What is not included in the quoted figure?

What is quoted is what the drawing says, and the figure does not move unless the drawing does. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. The back edge is eased in progressively rather than offered up once and forced. It is the slow part of the day and it should be.

09

Can I have grooves instead of a separate drainer in Green Street Green?

Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. Where there is no room for a separate drainer, grooves are usually what gets specified instead. Plaster over blockwork is thin and hollow in patches, so anything fixed back to the wall needs a sound spot found first. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Sink and hob seated and sealed before we go.

10

What if the units in a Green Street Green kitchen have moved since they went in?

Small variation is taken up by packing under the top on the fitting day. A sloping floor is not the problem. The plane the unit tops finish in is. A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. It adds an hour or two to the day, and that time sits in the schedule rather than being taken out of the finishing. Offered up twice, bonded once.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review

Next step

Worktop installation in Green Street Green, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.