Lambeth · SE11

Splashbacks and upstands in Kennington

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Kennington kitchens

The kitchens we meet in Kennington

Anyone who has already replaced a kitchen in Kennington will tell you that splashback and upstand work is decided by the room long before anyone opens a colour chart. Georgian and early Victorian houses have their kitchens at lower-ground level in what were service rooms, so runs follow the original room proportions with a small island or a central table rather than a big open plan. Estate flats nearby have compact separate kitchens with fixed service positions. The quotation visit costs nothing and commits you to nothing. It is also the simplest way to find out which you have.

There is usually a step down into the back addition, so the kitchen floor and the hall floor are not the same level and neither of them is flat. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Boxed pipework decides the panel width before taste does.

Listing and conservation conditions apply to a good number of these, which constrains what can be altered around the kitchen rather than what goes on top of the units. A full-height panel in a chimney recess is templated as a trapezium, since that recess is square in neither direction. Nothing goes on a wall that will not hold it.

What we are usually templating in is Georgian terrace, Early Victorian terrace, Interwar and postwar estate block and Mansion flat. They were built to different tolerances, and the stone has to absorb that.

Worktop join finished flush against a wall
  • Georgian terrace
  • Early Victorian terrace
  • Interwar and postwar estate block
  • Mansion flat

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
Borough
Lambeth
Postcodes
SE11
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why Kennington is its own job

What we want to establish about your kitchen in Kennington is how we get to it and what we will be fixing against. Much of the Georgian stock is listed or in a conservation area with a lower-ground entrance down railed area steps that turn sharply at the bottom. Parking is permit-controlled and the northern edge falls close to the congestion charge boundary, so charges need checking by street. Lower-ground rooms in this stock are damp-prone and rarely flat, so the run needs packing and the floor level checked at both ends before any long piece is cut. We would rather tell you about that before you pay a deposit than explain it afterwards.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. Where a run is longer than one sheet will cover, the break is put on a vertical that has a reason to be there, and the two edges are cut as a pair so the seam closes without filler. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

The survey for these pieces is a separate visit with a separate drawing, made after the tops are in and the room has stopped changing. On natural stone a panel added a year later will read as a different stone, which is why the material behind the hob is settled at the same time as the surface. Chimney breasts in these kitchens leave a shallow opening where the range once stood, so the strip has to return into it on both sides. Machined to the room, not trimmed to it.

Corners and joins See the options

The money

What it costs in Kennington

Sockets and switches are cut-outs like any other, and their number does more to the price than the height of the panel does. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. Across the catalogue the supply-only rate is £110 to £550 per square metre, before any of the work that turns a slab into a worktop. Priced by the edge and the openings, not the wall.

period detached houses and villas

Kennington in the housing figures

Taken across Kennington and the roads either side of it, most of the housing is flats. Where the route is tight the panel is broken at a natural vertical joint rather than forced through in one. Set out around the sockets as they actually are.

period detached houses and villas

The building, and what it does to the job

Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. Upstands are scribed along their top edge as well as their bottom, which is slower than it looks and is the reason they sit tight. Height follows the sill, not the plan.

period detached houses and villas

What Kennington asks for

Infrequent work for this area, though we do it whenever it is asked for. Worktop replacement and worktop installation are the commoner calls. Nothing about the method or the standard varies with frequency.

Access

Getting stone into a Kennington kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South London patch

Kennington is covered on our south London run, along with the rest of Lambeth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Kennington

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Kennington on your patch?

Yes. Kennington is on the patch, and the postcodes we work here are SE11. It is worked on our south London run, along with the rest of Lambeth. Plenty of zones run at the weekend as well as through the week, so a Saturday date is not automatically the easier one to work. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Wind on an open street matters more than the walk does. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

02

Is there anything about Kennington buildings that catches worktop splashbacks & upstands out?

A basement kitchen has a flagged or concrete floor laid straight onto the ground, so it is solid, cold and rarely within ten millimetres of level. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall makes that decision, not the brochure. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Scribed along the top edge as well.

03

What do you check about the route into a Kennington property?

Boxed-in pipework running along the skirting looks harmless until a loaded trolley has to pass it. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Upstands make almost any turn a worktop will not. A permit covering the street is permission to park rather than a space reserved on it, and on a full street the difference is the whole morning. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Standing a panel on the pavement is the last resort.

04

Would you call Kennington a worktop splashbacks & upstands area?

Not really, and claiming otherwise would cost nothing and mean nothing. What the research on this patch actually lists is worktop replacement and worktop installation. It reflects the local housing rather than any difference in the work. It is quoted, cut and fitted here the same way it is anywhere else on the patch. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. One conversion drawing repeats its mistakes six times. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Cut now, stored for the next void.

05

Why do two Kennington kitchens the same size price differently?

Knee room under a breakfast bar is measured from the face of the cabinets rather than from the edge of the stone, so a deep apron quietly eats the depth somebody actually gets to sit in. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The hob panel is sized after the extractor, not before. Supply-only material is £110 to £550 per square metre, and templating, fabrication and fitting are quoted separately rather than rolled in.

06

What has to be finished before you can template?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The obstruction breaks the length, every time. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Access is arranged through a managing agent or a scheme office rather than with the household directly, so a date gets confirmed once in writing and moving it costs a fortnight. Full-height panels need the wall made good first, which is another trade and another timescale. Low maintenance is the honest choice for a let.

07

What is the order of events on a Kennington kitchen?

The same firm templates and fits. Nobody else is brought in to install. The design and quotation visit comes first. It is free and carries no obligation. If the units run late the template moves, not the fit: the gap between them is fabrication. Sash windows sit low in the rear wall, and the sill often lands below the height a worktop wants to run past. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Making the wall good first is cheaper than working around it.

08

What happens when the route into a Kennington kitchen is tighter than the worktop?

Where there is a lift, whether it can be booked out and padded matters as much as its size. If a piece cannot be got in at all, we say so at the template rather than on the day. Splitting a run costs a join, and that is the price of getting stone into the room at all. Where the staircase comes down into the hall the bottom treads project into the width, and nothing about that can be moved for the day. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Two people to a panel, however light it looks on the van.

09

What if the units in a Kennington kitchen have moved since they went in?

Units have to be fixed down as well as levelled. A loose carcass moves under stone. Packing takes up small variation. It is not there to hide something that belongs in the units. Small variation is taken up by packing under the top on the fitting day. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A tall panel exposes what an upstand forgives.

10

Can a Kennington worktop be done in one piece?

Slabs come in finite sizes, so a long run needs a join whatever the room looks like. A finished join is typically two to three millimetres, colour-matched and sanded flush. An island often runs in one piece where a wall run cannot. Three stools along one side need more clear length than most plans allow, and once the seating depth is fixed the piece either grows or it loses a seat. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. A joint behind a tap is a joint on show.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Excellent service and top quality workmanship. The worktop looks absolutely amazing and the attention to detail is impressive. The team was professional, punctual, and very easy to work with. Highly recommended for anyone looking for a premium kitchen worktop! 👌”
Costin RomanGoogle review
★★★★★
“Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5”
Kam 98Google review
★★★★★
“We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer any questions. The new worktops have completely transformed our kitchen and look amazing. Highly recommend Worktop WorX to anyone looking for high quality kitchen worktops, bespoke workmanship, and excellent customer service.”
Gabriel TivadarGoogle review · Laurent Gold sintered stone

Next step

Splashbacks and upstands in Kennington, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.