Lambeth · SE11

Worktop replacement in Kennington

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

Kennington kitchens

The kitchens we meet in Kennington

People often assume worktop replacement in Kennington is a straight swap, and sometimes it is, though the kitchen usually has an opinion about that. Georgian and early Victorian houses have their kitchens at lower-ground level in what were service rooms, so runs follow the original room proportions with a small island or a central table rather than a big open plan. Estate flats nearby have compact separate kitchens with fixed service positions. None of that has to be decided before you get a price. It is what the survey is for.

Gas, waste and later wiring were boxed in against the wall long after the house was built, and that boxing is what the run has to clear. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Twenty years of settlement is measured, not argued with.

A basement kitchen has a flagged or concrete floor laid straight onto the ground, so it is solid, cold and rarely within ten millimetres of level. Each piece is offered up and eased in rather than dropped, because nothing in the room is straight enough to drop into. What is behind the old splashback decides the new one.

The building stock is Georgian terrace, Early Victorian terrace, Interwar and postwar estate block and Mansion flat. That is why the same worktop costs differently two doors apart.

Undermounted sink cut-out in a quartz worktop
  • Georgian terrace
  • Early Victorian terrace
  • Interwar and postwar estate block
  • Mansion flat

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • A run longer than a single slab arrives in pieces, with a join between them.
  • Up to four quartz samples are posted free before you commit to a colour.
  • The new material is guaranteed for 25 years and the labour for five.
Borough
Lambeth
Postcodes
SE11
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why Kennington is its own job

We have carried enough stone into kitchens in Kennington to know what to allow for before the day arrives. Much of the Georgian stock is listed or in a conservation area with a lower-ground entrance down railed area steps that turn sharply at the bottom. Parking is permit-controlled and the northern edge falls close to the congestion charge boundary, so charges need checking by street. Lower-ground rooms in this stock are damp-prone and rarely flat, so the run needs packing and the floor level checked at both ends before any long piece is cut. It is our problem to solve, and solving it starts with a tape measure.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

Most of a replacement happens before any stone is unwrapped, because the removal and what it exposes set everything that follows. The carcasses are read for swelling, soft ends and any fall along the length once the top is off, and that reading is what the day gets costed against. A kitchen in one of these has been re-fitted at least twice already, and every fit left something behind under the top. Nothing is taken apart that does not have to be.

Sink cut-outs See the options

The money

What it costs in Kennington

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. Two quotes can agree on a supply rate of £110 to £550 per square metre and still land a long way apart, because the cut-outs, the joins and the edge profile are priced after it. You keep the units, and you see what that saves.

period detached houses and villas

The shape of the run

Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. The return is remeasured even where it looks unchanged.

period detached houses and villas

What Kennington asks for

If we are on this patch at all, this is usually the reason. Worktop installation follow.

period detached houses and villas

Kennington in the housing figures

Across this patch most of the housing is flats. The old tops have to leave the way the new ones arrive, and a laminate run is easier to remove whole than to carry whole. The replacement fits the kitchen that is there now.

Access

Getting stone into a Kennington kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South London patch

Kennington is covered on our south London run, along with the rest of Lambeth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Kennington

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Kennington far enough out to be a problem for you?

Yes. Kennington is on the patch, and the postcodes we work here are SE11. It is worked on our south London run, along with the rest of Lambeth. A short lunchtime window of control exists to keep commuters off the street, and it still catches a trade van standing there for an hour. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste run is planned, not improvised. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

Does the housing in Kennington change how worktop replacement works?

The closet wing is a narrow projection at the back with windows on two sides, which leaves very little continuous wall for a run. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. A new top on a settled run needs the run corrected first. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. This is the commonest reason a replacement turns out to need more than a straight swap. The laminate has been covering it up.

03

How does the stone actually reach a kitchen in Kennington?

A hall that widens further in is still only as good as its tightest point, and that point is usually within a metre of the front door. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. That is agreed before a plumber is booked. Where the nearest legal space is a couple of streets back, the walk with each piece becomes the job, and the crew is sized for walking rather than wheeling. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. It is a full day at the kerb, not a delivery.

04

Does worktop replacement come up more than anything else in Kennington?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Specified for wear rather than for the photograph. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Old tops out in the morning, new stone down and sealed the same afternoon. No sealing schedule for anybody to forget.

05

What am I actually paying for, line by line?

An island carries its own edge detail all the way round, so a mitred 100mm apron on four sides is four mitres cut, bonded and polished before the piece ever leaves the bench. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Yield is worked out fresh for the new material. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

Is there anything I have to finish before the template in Kennington?

A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. We would rather find it at template than on the morning, which is why the templater looks behind the units. Found at template, not on fit day. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Planned programmes run several kitchens in sequence, so template, fabrication and fitting move as a rolling operation and one uncollected key holds up more than one flat. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. The plumber is booked by whoever holds the contract.

07

What if something breaks during the fit?

A remade piece is cut from the same slab run wherever the slab allows, because a replacement from another batch will not match across a join. Our own installers do the carry, so there is nobody in the middle to argue with about it. Door frames and the stair route are protected too, since most contact happens on the way in. A front path with a gate and a turn or two adds handling before the door is even reached, and every handling movement is another chance to catch a corner. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. The way out is measured with the way in.

08

Does a stone worktop need sealing?

Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Original panelling and shutter boxes stand out from the structural wall, so the face the units meet is joinery rather than plaster. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. The fabric gets checked while it is open.

09

Do you take on fitting-only work in Kennington?

Sinks, taps and hobs are yours to buy in any case, and they only have to be in the room for the template. How much slab you hold matters: upstands and any remake have to come out of the same batch. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. A surface swap is the fastest upgrade available on a kitchen that is otherwise sound. The annexe top goes in on the same day.

10

Can I have stone up the wall in a Kennington kitchen?

Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. Ordered later from a different batch, the match is not reliable where the two pieces meet. Tiling and stone can meet, but where they meet is decided before the template rather than after. A basement is often reached by its own door under the front steps, and that door is smaller than anything else on the route. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Old fixings come out of soft brick and better ones go in.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Worktop replacement in Kennington, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.