Richmond upon Thames · TW9

Worktop replacement in Kew

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Kew kitchens

The kitchens we meet in Kew

The part of worktop replacement in Kew that surprises people is how much of it is decided before anyone touches a slab. Neat Victorian and Edwardian terraces where the standard project is a modest side-return infill giving a 3.2m run plus a 1.5m return, with a rooflight over the sink; kitchens stay lighter and smaller in scale here than in the big Sheen semis, and islands are the exception. If that sounds like guesswork, it is not: it is measured on the day, in your kitchen, before anything is cut.

Chimney breasts are often taken out at ground level and left standing above, so the middle of the run is newer wall than the two ends of it. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. Twenty years of settlement is measured, not argued with.

There is a solid base under the old scullery end and suspended timber where the addition meets the house, and the two part company along that joint. Each piece is offered up and eased in rather than dropped, because nothing in the room is straight enough to drop into. Sound carcasses are the one condition.

The archetypes on this patch are Georgian house on the Green, Victorian terrace, Edwardian terrace and 1930s semi. The floor datum is the thing that changes most between them.

Mitred waterfall edge detail on a quartz island
  • Georgian house on the Green
  • Victorian terrace
  • Edwardian terrace
  • 1930s semi

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • The carcasses have to be sound: stone is far heavier than laminate.
  • Templating happens in the room, and it is the measurement everything else is cut from.
  • A run longer than a single slab arrives in pieces, with a join between them.
Borough
Richmond upon Thames
Postcodes
TW9
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Kew is its own job

A fit in Kew is planned around the building it is going into, which is what the survey is for. Conservation area covering most of the streets, so skips and scaffolding are consented and frontages are protected; parking is permit-controlled all day and the level crossing and one-way loops make the approach slow. Conservation rules keep the extensions narrow, so the run ends up long and thin - watch the overhang at the return where the wall kicks out. The point of the free visit is that we see the Kew job for ourselves rather than guessing at it from an email.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. We take the old surface off, check the carcasses are sound and level, and fit the new tops the same day. Disposal of the old worktop is a separate line on the quote rather than folded into the price. You end up with the same kitchen and a completely different surface, in one fitting day rather than a kitchen refit that empties the room for a fortnight.

A replacement is priced in three parts: the new stone, the work of taking the old top out, and carting it away afterwards. Sink and hob are settled before the templater attends, because a change to either changes the cut-outs and cannot be added later. A kitchen in one of these has been re-fitted at least twice already, and every fit left something behind under the top. Nothing is taken apart that does not have to be.

Waterfall ends See the options

The money

What it costs in Kew

What the old worktop was fixed to matters more to the price than what goes on top of it. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. If you are holding two quotes, the £110 to £550 supply rate is the part they will agree on. Compare the join count, the edge profile and what the fitting line covers. You keep the units, and you see what that saves.

period detached houses and villas

Kew in the housing figures

Across Kew, almost nothing has gone up in the last fifteen years, which makes the carcass check the first question rather than the last. A plumber disconnects before we arrive and reconnects after we have gone. Any fall in the carcasses is packed out first.

period detached houses and villas

What Kew asks for

The research on this patch does not put this among the three commonest jobs. Worktop installation do. That changes how often we are here, not how the work is done.

period detached houses and villas

The shape of the run

On a book-matched pair the halves are laid out so the mirror line runs down the length of the piece, and once that line is set the top cannot be turned round to suit anything else. The shape is already there to be measured, which makes the template straightforward and leaves the strip-out as the part that actually needs planning. The return is remeasured even where it looks unchanged.

Access

Getting stone into a Kew kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Kew is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Kew

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Kew?

Yes. Kew is on the patch, and the postcodes we work here are TW9. It is worked on our south west London run, along with the rest of Richmond upon Thames. A suspension only works if the cones and the notice are actually there on the morning, and now and then a car is sitting in the bay regardless. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

Does the housing in Kew change how worktop replacement works?

The original range recess often survives as a shallow alcove with an iron lintel over it, a hundred millimetres deeper than the wall either side of it. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Off in the morning, on by the afternoon. Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The stack was boxed in after the kitchen went in.

03

How does the stone actually reach a kitchen in Kew?

A level threshold with hard standing outside it is the one arrangement where a full run goes in without a single re-grip. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The way out is measured with the way in. Where the permit is a digital session rather than a paper one, somebody in the house has to start it at the hour the van actually arrives. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Two loads, one space, one day.

04

Would you call Kew a worktop replacement area?

Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop installation. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Specified for wear rather than for the photograph. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. The carcasses have to be sound, because stone is several times the weight of what is coming off. No sealing schedule for anybody to forget.

05

What am I actually paying for, line by line?

A waterfall leg is a separate piece bonded to the top on a mitre, so the floor it stands on has to be level enough for that mitre to close along its full height. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Yield is worked out fresh for the new material. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

Is there anything I have to finish before the template in Kew?

Casement handles and stays swing down into the space above the worktop, so the clearance that counts is the one measured with the window open. This is the commonest reason a replacement turns out to need more than a straight swap. A postformed top swallowed the fall. This will not. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Flats bought out of managed stock keep the original kitchen dimensions long after the ownership changed, so the layout says very little about who is paying for the work. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Two visits mean two people taking a day off.

07

When do I pay for a Kew worktop?

Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. Material is quoted supply only and templating, fabrication and fitting sit on their own lines, so it is visible which part is stone and which is labour. No installed price per square metre is published, because it is not a real number. A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. The alcove was never square and it still is not.

08

Do the template and the fit happen on the same visit?

The design and quotation visit comes first. It is free and carries no obligation. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. An under-stairs cupboard eats one end of most of these kitchens, and the run stops at a door that has to keep opening. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. The old top comes off in pieces, not whole.

09

What happens if my units are not level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. An island is where this usually shows, standing free with no wall to level against. Packing takes up small variation. It is not there to hide something that belongs in the units. Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. What passed for a fit in chipboard will not pass in stone.

10

How do you cut out for an undermounted sink?

We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. Where the hob lands is set out against the units and the wall behind, not off the kitchen plan. A tap under a window board still needs room for its handle to lift, which is checked at the template. It is the heaviest single piece in the kitchen, so the number of hands needed on the day and the route in are worked out from that piece rather than from the runs. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. A run that flexed under laminate gets support now.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review

Next step

Worktop replacement in Kew, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.