Bexley · DA15

Worktop replacement in Longlands

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Longlands kitchens

The kitchens we meet in Longlands

Booking replacements in Longlands without a site visit is how people end up with a worktop that fits the drawing and not the wall. Semis and chalet bungalows on the slope down to the Cray valley. Bungalow kitchens are square with low ceilings and sills close to the worktop, while the semis follow the usual rear-kitchen-plus-dining-room plan. You do not have to work out which of those you have. We will look at it with you when we come to Longlands.

The rear extension is usually the newest and truest part of the building, so it is the older half of the kitchen that gives the trouble. A kitchen that has stood twenty years has settled into a shape of its own, and the new stone is cut to that shape rather than the original one. The old top is heavy waste, and booked as waste.

The roof space above carries services, so a boiler flue or a soil vent can drop into a corner of the kitchen and stay exactly there. The cill over the sink is checked against the new upstand height before anything is cut. Nothing goes back on carcasses the building has pulled out of square.

What turns up on the job sheets is 1930s semi, interwar chalet bungalow and postwar terrace. What the units are screwed to varies between them, and that decides the fixings.

Worktop join finished flush against a wall
  • 1930s semi
  • interwar chalet bungalow
  • postwar terrace

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
Borough
Bexley
Postcodes
DA15
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Longlands is its own job

A worktop is made to fit one kitchen, and in Longlands the kitchen and the way into it are what we work from. Sloping residential roads with drives on most houses, though a few streets narrow sharply toward the railway with little turning space for a long van. Low window sills in the bungalows kill a standard 100mm upstand, so measure sill height at template stage. That is a survey question, not a fitting-day question, and we treat it as one.

The work

What worktop replacement involves

A replacement is quoted the same way as a new kitchen: material per square metre supply-only, with templating, fabrication and fitting each written on their own line. We take the old surface off, check the carcasses are sound and level, and fit the new tops the same day. Disposal of the old worktop is a separate line on the quote rather than folded into the price. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

A replacement is measured against the kitchen standing in the room today rather than the layout it was fitted to years ago. The carcasses are read for swelling, soft ends and any fall along the length once the top is off, and that reading is what the day gets costed against. The larder recess usually holds an odd short length that has to be dealt with at the same time or lived with afterwards. The old surface leaves in our van, not your garden.

Corners and joins See the options

The money

What it costs in Longlands

A replacement is priced against the kitchen that is there now, and the carcasses are the one condition that can change it. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. The rate is £110 to £550 per square metre supply only, though what you buy is slabs rather than square metres, which is why the material line follows the yield and not the tape. Priced on the kitchen you have, not the one on the plan.

1930s and inter-war semis

Longlands in the housing figures

In this neighbourhood there are very few flats. The rooms therefore start closer to true than in most of London. The old tops have to leave the way the new ones arrive, and a laminate run is easier to remove whole than to carry whole. What the stock predicts, the strip-out confirms.

1930s and inter-war semis

What Longlands asks for

This is the job the local stock asks for first, ahead of worktop installation.

1930s and inter-war semis

The building, and what it does to the job

Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The stack was boxed in after the kitchen went in.

Access

Getting stone into a Longlands kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Longlands is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Longlands

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Longlands?

Yes. Longlands is on the patch, and the postcodes we work here are DA15. It is worked on our south east London run, along with the rest of Bexley. Where the drive is shared, the half-hour the van spends in the way is agreed with the neighbour in advance rather than apologised for at the time. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Old stone is heavier going out than it looked coming in. The measuring and the fitting are both done at the property, so there is nothing to visit or collect.

02

Why would worktop replacement in Longlands be any different from anywhere else?

Everything on one level means no stairs, no landings and no turns, which is about the easiest carry there is in domestic work. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. Units kept, surface changed, one day. Casement handles and stays swing down into the space above the worktop, so the clearance that counts is the one measured with the window open. This is the commonest reason a replacement turns out to need more than a straight swap. A postformed top swallowed the fall. This will not.

03

What is the carry like in Longlands?

A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Both movements are planned as one. A step up from the drive to the threshold turns the last two metres into a lift, and a lift is where two pairs of hands become the minimum. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The van has to stand through both halves of the day.

04

Do you end up doing worktop replacement more than the rest in Longlands?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. The annexe top goes in on the same day. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The carcasses have to be sound, because stone is several times the weight of what is coming off. Booked at short notice, because the notice is short.

05

Where does the money go on a Longlands worktop?

The two runs are read against each other rather than against the floor, so they are set to one datum taken across the aisle instead of measured up from the boards. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Level the units first, measure the shape second. Material alone is £110 to £550 per square metre, and templating, fabrication and fitting are never folded into that figure.

06

What needs to be ready before you come to Longlands?

A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. We would rather find it at template than on the morning, which is why the templater looks behind the units. The alcove was never square and it still is not. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Nothing to reseal is the point in a let.

07

Is taking the old top off part of the job?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. The tap and waste have to be disconnected by a plumber before we start and reconnected once the stone is in. The units below stay exactly as they are; only the surface is replaced. Where the van cannot turn on the plot it has to arrive already facing the right way, so the approach along the street is part of the plan. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. A one-hour window will not hold a two-way job.

08

The floor in my Longlands kitchen slopes. Does that matter?

If the carcasses are corrected, the template is taken again, since a drawing off units that then moved is worthless. Small variation is taken up by packing under the top on the fitting day. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. What passed for a fit in chipboard will not pass in stone.

09

Can the price change after templating?

Cut-outs, edge profile and join count are itemised, so taking one out removes a line rather than starting an argument. What is quoted is what the drawing says, and the figure does not move unless the drawing does. Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. It usually explains the odd filler piece or strip of beading in the existing run that nobody could account for. Taking the top off is what exposes the floor.

10

What if a worktop will not physically fit through the building?

The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. The old top leaves by the route the new one arrives on.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review

Next step

Worktop replacement in Longlands, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.