Bexley · DA14

Worktop replacement in Foots Cray

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Foots Cray kitchens

The kitchens we meet in Foots Cray

Most of the replacements we do in Foots Cray land in one of a few kinds of kitchen, and which one you have changes the job long before the stone is ordered. Mixed stock along the river: small older cottages with tight rear kitchens, postwar estate flats with 2.4m galleys, and interwar semis in between. Most work is replacement rather than redesign in rooms that were never large. A worktop that fits is a worktop that was measured. The description is background, the template is the actual instruction.

A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. Units checked before stone goes on them.

Cottage terraces have no hall to speak of and the front door opens almost straight into the room, which makes the carry easier and the protection harder. Carcasses are checked for square and fixed back before a stone top goes on them. The building has kept moving; the new template catches up.

The stock we template in here is Victorian cottage terrace, 1930s semi, postwar council estate and 1960s maisonette. Which of those you have decides most of what follows.

Undermounted sink cut-out in a quartz worktop
  • Victorian cottage terrace
  • 1930s semi
  • postwar council estate
  • 1960s maisonette

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • A run longer than a single slab arrives in pieces, with a join between them.
  • Up to four quartz samples are posted free before you commit to a colour.
  • The new material is guaranteed for 25 years and the labour for five.
Borough
Bexley
Postcodes
DA14
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Foots Cray is its own job

If you have had a worktop fitted in Foots Cray before, you will recognise some of this. The main road through is busy and narrow with the river bridge as a pinch point; the estate sections have parking courts and rear pathways and the cottages have no off-street parking at all. The older cottages near the river have settled floors, level the units off a datum line, not off the floor. The template is where the room stops being a drawing and starts being measurements, and the price follows the measurements.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. Whatever sits on top of the old surface, tiling, an upstand or a run of sealant, has to be dealt with in the same visit, so it is priced with the job rather than left as a surprise. You end up spending on the surface rather than on the cabinetry, which is where the money shows, because a worn top ages a kitchen faster than doors that are still square.

Replacement is two jobs in one visit: taking the old surface out, and setting the new one on what is left behind. Sink and hob are settled before the templater attends, because a change to either changes the cut-outs and cannot be added later. A kitchen in one of these has been re-fitted at least twice already, and every fit left something behind under the top. The old surface leaves in our van, not your garden.

Sink cut-outs See the options

The money

What it costs in Foots Cray

Taking the old surface off and getting rid of it is its own line rather than something folded quietly into the stone price. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. That £110 to £550 per square metre buys the slab and nothing else. Templating, machining, edges, cut-outs and the fitting day are counted and charged one by one. The carcass check happens before the deposit.

Victorian and Edwardian terraces

The shape of the run

Where the sink and the hob face each other across the aisle, everything carried between them crosses the walkway, and that is the one movement the shape cannot design out. Cut-outs in the new tops rarely land exactly where the old ones did, so the sink and hob are checked against the new sizes rather than assumed to carry across. The return is remeasured even where it looks unchanged.

Victorian and Edwardian terraces

What Foots Cray asks for

First by volume on this patch, with worktop fabrication some distance back.

Victorian and Edwardian terraces

Foots Cray in the housing figures

Across this patch the bulk of the housing belongs to the rebuilding decades after the war. The same original carcasses turn up again and again, and their surfaces came away the same way each time. What the stock predicts, the strip-out confirms.

Access

Getting stone into a Foots Cray kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Foots Cray is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Foots Cray

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Foots Cray on your patch?

Yes. Foots Cray is on the patch, and the postcodes we work here are DA14. It is worked on our south east London run, along with the rest of Bexley. Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste run is planned, not improvised. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

Does the housing in Foots Cray change how worktop replacement works?

Floors are suspended timber over a shallow void and have moved, so the units are packed and levelled before anything is set on them. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. A new top on a settled run needs the run corrected first. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. This is the commonest reason a replacement turns out to need more than a straight swap. The sill was always low. Nobody had to care until now.

03

How does the stone actually reach a kitchen in Foots Cray?

Booked delivery windows on a managed estate run to an hour, and a worktop install does not happen inside an hour. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Two carries in one day needs the route free for both. A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. It is a full day at the kerb, not a delivery.

04

Is worktop replacement what Foots Cray rings about?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop fabrication. Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Shared-house tops take a decade of hard use. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Old tops out in the morning, new stone down and sealed the same afternoon. Specified for wear rather than for the photograph.

05

What am I actually paying for, line by line?

A run that stops in mid-air at the open end needs a finished end rather than a cut one, and that end takes the same edge work as the whole front. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Yield is worked out fresh for the new material. The stone is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted separately.

06

Is there anything I have to finish before the template in Foots Cray?

Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. We would rather find it at template than on the morning, which is why the templater looks behind the units. A straight swap is the exception in an older room. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where the provider has set the specification the material choice was made once for a great many kitchens, and the useful work is meeting it exactly rather than proposing something else on the day. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. A tired carcass is said before, not discovered after.

07

How do you cut out for an undermounted sink?

A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. A sit-on sink and an undermounted one are different cut-outs, so which it is gets settled before the template. Where a run finishes hard against a wall the last few millimetres are scribed, and where it finishes in open floor it is cut square and polished, which is two different jobs on one length. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. A run that flexed under laminate gets support now.

08

Which materials need sealing and which do not?

No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. The bead where the sink and hob meet the stone is siliconed rather than sealed, and wants watching. Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. A small room puts the sink, hob and tap cut-outs close together on one short length, and the bridge of stone left between them decides whether it can be cut in one piece. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. The fabric gets checked while it is open.

09

Will I be able to see the joins?

Each join is an item on the drawing, so the layout and the figure move together. Join count is a question about slab size and run length, nothing else. A join is glued and clamped flush on the day, so it is fixed rather than something to be undone. A doorway partway along one wall breaks that side into two separate pieces, and two short pieces cost more between them than the single long one they replace. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Appliance gaps are checked against the new thickness.

10

What is actually on a Foots Cray worktop quote?

Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. The quote is written from the template drawing. Before that it works from what you have described. The edge profile is its own line, so a shaped edge and a square one are two different figures. A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. The wall has not moved, and neither has the problem.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Worktop replacement in Foots Cray, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.