Bexley · DA14

Worktop replacement in Ruxley

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

Ruxley kitchens

The kitchens we meet in Ruxley

Getting worktop replacement in Ruxley right is mostly a matter of knowing what you are dealing with before the order goes in, and that means looking properly. Postwar detached houses and bungalows on the green-belt edge with square kitchens and a utility off the side; runs are 3m to 3.5m with a peninsula, and single-storey bungalow extensions are the common project. Plenty of kitchens do not match either description exactly, which is what the measured survey is there to sort out.

A boiler hangs on the wall above the run in most of these, and its pipework drops exactly where a splashback wants to go. Taking the old tops off is also the first honest look at what has been going on underneath them. Water damage under a sink is the usual find.

Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. Post-war terraces have small, roughly square kitchens with a back door and a window in the middle of the run, so runs are short and joins are rare, but there are usually two corners and a window cill to work around in a couple of metres. The wall behind the old top has not been seen in years.

The fabric of the place is postwar detached, 1960s-70s estate housing and green-belt edge bungalow. That is why the same worktop costs differently two doors apart.

Undermounted sink cut-out in a quartz worktop
  • postwar detached
  • 1960s-70s estate housing
  • green-belt edge bungalow

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • The new material is guaranteed for 25 years and the labour for five.
  • New stone is fitted five to ten working days after the measure.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
Borough
Bexley
Postcodes
DA14
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Ruxley is its own job

Getting a worktop into a kitchen in Ruxley and getting it to sit right are the parts worth planning properly. Fast main-road frontages on the bypass side, but the houses themselves have drives and generous frontages with no parking restrictions to speak of. Bungalow extension work here usually has a flat roof and rooflight over the run, so check headroom before quoting tall units and upstands. That is why the quote is itemised: you can see what the building is costing you and what the stone is.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. The surface is cleared and the route out protected before anything is unfixed, because a top that has been sealed and screwed down for years leaves the house in pieces with edges on them. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

Replacement leaves the cabinetry, the doors and the appliances where they are, and changes only the horizontal plane above them. A bonded stone top is broken down where it sits before it is taken out, because it will not come away from the cabinets whole. The back door opens straight off the kitchen, so the old run leaves the house in a few steps. The tiling line and the wall behind it are dealt with too.

Sink cut-outs See the options

The money

What it costs in Ruxley

Taking the old surface off and getting rid of it is its own line rather than something folded quietly into the stone price. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. For a rough sense of the material, £110 to £550 per square metre supply only is the honest span. Treat it as one line of a quote that will carry several more. What is found underneath is raised before it is charged.

period detached houses and villas

The shape of the run

The joint where a peninsula meets the main run wants a gable directly under it, and where the units do not offer one, steel goes in to carry that joint instead. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Same shape, different cut list.

period detached houses and villas

Ruxley in the housing figures

Taken across Ruxley and the roads either side of it, planned post-war layouts account for most of the housing. The same original carcasses turn up again and again, and their surfaces came away the same way each time. Out in the morning, sealed by the afternoon.

period detached houses and villas

What Ruxley asks for

The housing on this patch does not throw up much of this. It throws up worktop installation. When it does come up, it gets the same template, the same bench and the same crew.

Access

Getting stone into a Ruxley kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Ruxley is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Ruxley

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Ruxley far enough out to be a problem for you?

Yes. Ruxley is on the patch, and the postcodes we work here are DA14. It is worked on our south east London run, along with the rest of Bexley. Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. A suspension for the full day beats half a day lost. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

02

What should I expect from worktop replacement in a Ruxley kitchen?

Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. The units are often 1970s or 80s and only around 500mm deep, so a standard 600mm stone top overhangs at the front and the doors and drawer fronts need checking against it. Old tops were scribed to a wall that has moved since. A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Levels get corrected before the new top is measured.

03

How would you get a worktop into a property in Ruxley?

Suction lifters need a clean dry face to hold, so in the wet the pads come off and the piece goes back to being carried on webbing by hand. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Out and in happen along the same protected route. A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Nothing goes out until the route back to the van is clear.

04

Do you get much worktop replacement work in Ruxley?

No, not particularly, and it would be easy to say otherwise. What the research on this patch actually lists is worktop installation. That is the local housing talking rather than anything about the job. It is priced, cut and fitted no differently here than anywhere else we cover. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Old top out Tuesday, tenant in on Friday. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The carcasses have to be sound, because stone is several times the weight of what is coming off. The flat earns nothing while it sits empty.

05

What moves the number on a quote around here?

A breakfast bar on the outer side is an overhang like any other, and the support under it is sized for people leaning on the end rather than for the weight of the stone alone. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The old cut-outs prove nothing. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

What state does a Ruxley kitchen have to be in before you template?

Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. We would rather find it at template than on the morning, which is why the templater looks behind the units. Same footprint, different tolerances. Empty the base units completely and have a plumber disconnect the sink, tap and any washing machine plumbed in under the worktop before we arrive. Residents are given written notice before anyone attends, and that notice period rather than the workshop is what governs the earliest sensible start. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Owners phase this work; a void period cannot.

07

What is actually on a Ruxley worktop quote?

Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. Material is quoted supply only and templating, fabrication and fitting sit on their own lines, so it is visible which part is stone and which is labour. Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. The sill was always low. Nobody had to care until now.

08

Is removal and disposal included on a Ruxley job?

Taking the old tops off and disposing of them is its own line on the quote rather than something folded into the stone price. Old tops are screwed or glued from underneath, so the drawer boxes come out before the worktop does. Carcasses stay. Surface changes. That is the whole of it. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. The old tops leave in one movement rather than piece by piece.

09

How much upkeep is a stone worktop?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. The bead where the sink and hob meet the stone is siliconed rather than sealed, and wants watching. Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Chipboard carcasses under the sink swollen from a slow leak will not take stone and get replaced before fit day. The units have settled with the floor and get re-levelled.

10

What do you need from me for the sink and hob cut-outs?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. Each cut-out is priced on its own line, so a range, a bowl and a half, a boiling tap and a drainer are four items rather than one. A peninsula projects into circulation space, so its outer corners usually take a radius rather than a point, and that radius is agreed at template rather than assumed. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Any overhang gets underpinned first.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Worktop replacement in Ruxley, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.