Bexley · DA14

Kitchen worktops in Foots Cray

Mixed stock along the river: small older cottages with tight rear kitchens, postwar estate flats with 2.4m galleys, and interwar semis in between. Most work is replacement rather than redesign in rooms that were never large.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island beside the belfast sink, tulips on a brass tray and a wooden stool tucked under the overhang

The housing stock

What we are usually working with in Foots Cray

A cast iron soil stack runs down the outside of the rear wall, so moving the sink means a fresh penetration through solid brick. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. Chipboard carcasses get bracing before stone lands on them.

The main road through is busy and narrow with the river bridge as a pinch point; the estate sections have parking courts and rear pathways and the cottages have no off-street parking at all. The older cottages near the river have settled floors, level the units off a datum line, not off the floor.

There is no back addition on these, so the kitchen is the original rear room and the run is one wall long with a door at each end of it. The old top ran under the tiles, so taking it out brings the bottom course with it and the upstand covers what is left. The old top hid it; the new one will not.

The building stock is Victorian cottage terrace, 1930s semi, postwar council estate and 1960s maisonette. Knowing which one it is before we arrive is half the survey done.

There is nothing to visit in Foots Cray. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Bexley
Postcodes
DA14
Covered on
our south east London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • Victorian cottage terrace
  • 1930s semi
  • postwar council estate
  • 1960s maisonette

Bexley

What gets asked for here

A run that stops in mid-air at the open end needs a finished end rather than a cut one, and that end takes the same edge work as the whole front. Cut-outs in the new tops rarely land exactly where the old ones did, so the sink and hob are checked against the new sizes rather than assumed to carry across. Breakfast bars get the steel they never had.

Foots Cray in the housing figures

In this corner of the borough, the bulk of the housing belongs to the rebuilding decades after the war. The corner is the piece that has to be right, and on a plan we know it falls in the same place each time. Every mitre is machined to the surveyed angle.

Corners and joins See the options

Nearby

We also work around Foots Cray

Foots Cray is one of 23 places we cover in Bexley. Our Bexley coverage

The whole New Malden patch

Questions

Working in Foots Cray

01

Do you take on Foots Cray kitchens?

Yes. Mixed stock along the river: small older cottages with tight rear kitchens, postwar estate flats with 2.4m galleys, and interwar semis in between. Most work is replacement rather than redesign in rooms that were never large. On a drive that only takes one vehicle nose-in, the van has to reverse the whole length of it to get back out, which decides which way it goes in. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The carry happens twice here, so the distance counts twice.

02

What is the housing like from a worktop point of view in Foots Cray?

Victorian cottage terrace, 1930s semi, postwar council estate and 1960s maisonette. That rear wall carries the back door and the only window, which leaves very little uninterrupted length for a sink run. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Same units, straighter line, better surface.

03

Is getting the worktop in the hard part in Foots Cray?

The main road through is busy and narrow with the river bridge as a pinch point; the estate sections have parking courts and rear pathways and the cottages have no off-street parking at all. Bollards, planters and a one-way service road can turn what looks like a ten-metre carry into a fifty-metre one. So the nesting is worked to the measured route first and to the slab second. Load order is set by the order the pieces will be carried.

04

What do you get asked for most in Foots Cray?

Worktop replacement and worktop fabrication, in that order. Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. So the nesting is planned around it rather than around a standard kitchen. Ten metres of upstand out of what the tops left. The older cottages near the river have settled floors, level the units off a datum line, not off the floor.

05

Why do Foots Cray quotes vary so much?

Where a run finishes hard against a wall the last few millimetres are scribed, and where it finishes in open floor it is cut square and polished, which is two different jobs on one length. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The new pieces are nested, not traced off the old ones. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. Cut it square where it should be radiused and the piece will fail on the lift, not in the kitchen. Geometry first, then the saw. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

06

Is a leasehold flat in Foots Cray any harder to do?

Consent for the work sits with the freeholder or the managing body, and getting it in writing first avoids a crew arriving to a locked door. The workshop works from the approved drawing, so whoever signs it off is signing off the join positions too. Appliance changes after nesting are a new piece. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

07

What happens if my units are not level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Units have to be fixed down as well as levelled. A loose carcass moves under stone. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. Internal corners are machined with a radius and polished, and kept well clear of any join or cut-out. A square internal corner is a crack waiting.

08

What if something breaks during the fit?

Chips at an edge or a corner are the usual form, because that is where stone is least supported. Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Damage found on the bench never leaves the workshop, and damage on the carry is remade under the same cover. The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. Getting that wrong leaves a finished, machined piece that cannot reach the room, which is a remake rather than a trim. A lift diagonal is a workshop dimension as much as a site one.

09

I have a slab already. Can you template and fit it in Foots Cray?

The quote is itemised, so a job where you already hold the slab is the same job with the material line taken off it. How much slab you hold matters: upstands and any remake have to come out of the same batch. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Pieces are dry-assembled and checked on the bench before anything is loaded. Spares crated with the batch and labelled by unit.

10

Can I have stone up the wall in a Foots Cray kitchen?

Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. Tiling and stone can meet, but where they meet is decided before the template rather than after. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. Many have had the ground floor chimney breast removed to gain three hundred millimetres, and the gained strip is newer blockwork standing proud of the old plaster. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. The wall behind the old top has not been seen in years.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review

Next step

Get your Foots Cray kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.