Hackney · N4

Splashbacks and upstands in Manor House

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island beside the belfast sink, tulips on a brass tray and a wooden stool tucked under the overhang

Manor House kitchens

The kitchens we meet in Manor House

The part of splashback and upstand work in Manor House that surprises people is how much of it is decided before anyone touches a slab. Mostly flats with compact fixed kitchens of 2.4-2.8m and appliances already in position, so replacement runs and upstands are the bread and butter. The Victorian terraces on the side streets give occasional rear-addition kitchens with a bit more length to work with. Old kitchens rarely announce what they are. That is why somebody comes out and looks before a price is written.

The side return was an outside toilet and a coal store before it was ever a kitchen, and the walls left over from that are half a brick thick. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Same slab run, same day, same batch.

A long piece has to come through the front door, down the hall, round the newel post and through a doorway with a step down into the addition. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Old plaster rarely gives you a flat metre.

The mix here is post-war estate block, Victorian terrace, 1930s block and new-build apartment. That is why the same worktop costs differently two doors apart.

Undermounted sink cut-out in a quartz worktop
  • post-war estate block
  • Victorian terrace
  • 1930s block
  • new-build apartment

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
Borough
Hackney
Postcodes
N4
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Manor House is its own job

The part of a Manor House job that goes wrong is almost never the stone, it is what nobody looked at first. Sitting on a major junction with red route sections and no stopping, so loading goes to the residential streets behind. The older blocks are walk-ups while the newer ones have lifts that need booking through the managing agent. Appliance positions are effectively fixed here, so template around the existing hob and sink footprints rather than assuming they can be shifted along the run. Far better to find it in Manor House with a tape measure in our hands than on the day the slab arrives.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. Cut from the slab the worktop came out of.

Sink cut-outs See the options

The money

What it costs in Manor House

It is priced as its own item so you can see what removing the grout line actually costs before deciding. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Supply-only material is £110 to £550 per square metre. The more useful question is not which end of that you are at, but how many operations the cut list carries. Ordered with the worktop, and cheaper for it.

ex-local-authority flats and estates

What Manor House asks for

It comes up regularly here without being the commonest job, which is worktop replacement. The visit, the workshop and the crew are identical either way.

ex-local-authority flats and estates

The carry, and what it rules out

Where only one car serves the building a breakdown on the morning halts the job outright, so the fallback route is worked out at template rather than on the landing. Panels travel on edge in a frame, and the frame needs the same clearance the finished piece does. Suction lifters take a panel where hands cannot get a grip.

ex-local-authority flats and estates

Manor House in the housing figures

Around here flats outnumber houses by a wide margin. A boxed riser is usually somewhere in the run. Where the route is tight the panel is broken at a natural vertical joint rather than forced through in one. The height is a decision, not a default.

Access

Getting stone into a Manor House kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Manor House is covered on our east London run, along with the rest of Hackney.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Manor House

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Manor House far enough out to be a problem for you?

Yes. Manor House is on the patch, and the postcodes we work here are N4. It is worked on our east London run, along with the rest of Hackney. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. The longer the walk, the fewer the panels per trip. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

Does the housing in Manor House change how worktop splashbacks & upstands works?

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall gets made good first or the gap shows. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Behind the boxing it becomes two pieces.

03

How does the stone actually reach a kitchen in Manor House?

A car that answers every floor button pressed while a piece is standing in it needs to be held on the key, and the key usually lives at a desk that wants notice. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Nothing is leaned anywhere it could slide down. A single red line has hours and a double red line does not, and the difference decides whether an early start is a plan or a penalty. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A narrow gap between parked cars decides how a panel turns.

04

Is worktop splashbacks & upstands common in Manor House?

It sits second or third on this patch, behind worktop replacement. Same template visit, same benches, same installers either way. Buyers upgrading before handover work to a choices deadline set by the sales office rather than by the build programme. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Plot spec panels are ordered by the plot, not the room. Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. One conversion drawing repeats its mistakes six times.

05

What am I actually paying for, line by line?

Walls at both ends mean two scribes on every piece, and a run that has to drop between two fixed points has no tolerance left to give away. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. A galley shows both walls at the same time. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

Is there anything I have to finish before the template in Manor House?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Nothing gets hidden behind a full-height panel. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. One owner can take a date next week while the flat below needs three weeks of notice, so several kitchens in one building end up scheduled by the slowest permission. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The tops and the wall are rarely one approval.

07

Can you get a full-length top into an upstairs kitchen in Manor House?

The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. An external stair, a side return or a rear garden counts as carry and is measured the same way. Piece length is set by the internal diagonal of the lift car, not by the length of the slab. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. The break goes where a joint reads as deliberate.

08

Will I be able to see the joins?

A join sits over a cabinet gable. It never spans a gap and never runs through a cut-out. A finished join is typically two to three millimetres, colour-matched and sanded flush. Join count is a question about slab size and run length, nothing else. An aisle under a metre stops being a working space the moment two people are in it, and the depth of the tops either side is what decides whether that happens. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Return ends are polished, not left sawn.

09

Which materials need sealing and which do not?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. A seal is not waterproofing. It only buys time to wipe a spill up. Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Solid plaster on brick takes a panel; a hollow wall wants thought.

10

Can I have stone up the wall in a Manor House kitchen?

Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. Ordered later from a different batch, the match is not reliable where the two pieces meet. Tiling and stone can meet, but where they meet is decided before the template rather than after. The addition is one room wide, so the run is a galley with a door at one end and a window at the other and no wall long enough for anything else. A full-height panel in a chimney recess is templated as a trapezium, since that recess is square in neither direction. A chimney breast breaks the run and the panels follow it.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Splashbacks and upstands in Manor House, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.