City of Westminster · W2

Worktop replacement in Paddington

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The same kitchen from the doorway, Arctic Starburst turning both corners past the induction hob to the tall units

Paddington kitchens

The kitchens we meet in Paddington

Half of what we get asked about worktop replacement in Paddington could be answered by a tape measure and ten minutes in the room in question. Basin-side apartment blocks with developer kitchens - a 3m wall run in a matt finish plus a peninsula facing the living area, integrated appliances, and a stone-effect surface the second owner wants swapped for real quartz. Almost no layout changes, all like-for-like upgrades. We would rather find the awkward corner now than on the day the stone arrives in Paddington, so the survey looks at everything.

The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. The wall behind the old top is rarely the wall on the drawing.

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The room itself is the easy part: walls are plumb, corners are square and the floor is flat, so scribes are minimal and joins can be tight. The shell is the constant here; the surface is not.

The kitchens we see here sit in 2000s canalside tower, 2010s Merchant Square apartment and Victorian terrace. None of them is harder than the others; they are awkward in different ways.

Polished stone edge profile close up
  • 2000s canalside tower
  • 2010s Merchant Square apartment
  • Victorian terrace

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
City of Westminster
Postcodes
W2
Covered on
our central London run
Fitted
5–10 working days from template

The place

Why Paddington is its own job

Stone is heavy, unforgiving and cut to a millimetre, so what governs a job in Paddington is everything around it. These towers run a full logistics process - book the loading bay off the estate road, a two-hour slot, ID and RAMS to concierge, protection in the lift, and no works outside 8am to 6pm weekdays. Some blocks require materials to go through a basement service corridor rather than the residential lobby. Concierge slots are short, so the whole slab set has to be on site in one movement - stage it kerbside first rather than making three trips to the van. You get a drawing you have agreed, a price that is fixed, and a five year guarantee on the workmanship.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. The template and the fit are separate visits with three to seven working days between them, so the kitchen is only out of action on the day the old surface comes off. You end up with cut-outs machined for the sink and hob you have now, which is not always what the old top was cut for, and a run that meets the wall as it stands today.

Replacement sometimes runs in the reverse order to a new fit, because the old top has to come off before what is under it can be templated. The carcasses are read for swelling, soft ends and any fall along the length once the top is off, and that reading is what the day gets costed against. Building management wants the removal notified as much as the delivery, and both belong in the same booking. Sink and hob settled before the templater attends.

Edge profiles See the options

The money

What it costs in Paddington

The saving on a replacement is that you keep the units. The risk is what is found under the old top, and that is checked before a deposit rather than after. The return into the wall and the free end are two different details on one piece, and both are machined rather than cut square. Nothing about the £110 to £550 supply range changes once the template is done. What the template settles is the piece count and the operations, and that is where the figure firms up. The strip-out and the disposal are their own lines.

Victorian and Edwardian terraces

What Paddington asks for

On the job sheets for this area, this is the line that keeps repeating, above worktop installation.

Victorian and Edwardian terraces

The carry, and what it rules out

Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The strip-out waits until the new stone has somewhere to stand.

Victorian and Edwardian terraces

Paddington in the housing figures

On the Paddington streets we cover, the council tax banding sits near the top of the London range. The lift car is part of the specification here. A plumber disconnects before we arrive and reconnects after we have gone. Disposal is a line on the quote, not a surprise.

Access

Getting stone into a Paddington kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central London patch

Paddington is covered on our central London run, along with the rest of Westminster.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Paddington

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Paddington?

Yes. Paddington is on the patch, and the postcodes we work here are W2. It is worked on our central London run, along with the rest of Westminster. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Loading out is loading in, done in reverse and heavier. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

Is there anything about Paddington buildings that catches worktop replacement out?

Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. The work is all in the building, not the kitchen. Nothing goes back on carcasses the building has pulled out of square. Dot-and-dab plasterboard sounds solid and is hollow behind, so anything fixed through it has to hit a dab or a batten rather than a void. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Same footprint, different tolerances.

03

What do you check about the route into a Paddington property?

Where the parking court sits behind the block the carry crosses open ground and gets boarded, because loaded trolleys and block paving do not agree. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Where it will not come out whole it comes out in sections. The goods lift has its own booking sheet, and a bay slot without a lift slot only gets the stone as far as the lobby. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Two carries in one day doubles what the distance costs.

04

Is Paddington mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Replacing one plot years after handover is the problem nobody plans for, because a quartz colour can be reordered and a granite block cannot. The carcasses have to be sound, because stone is several times the weight of what is coming off. Booked at short notice, because the notice is short. New-build kitchens are usually smaller than the plan suggests once the appliances are in, so the usable run is shorter than the drawn run. Old tops out in the morning, new stone down and sealed the same afternoon. Nothing else in the room has to change.

05

Why do two Paddington kitchens the same size price differently?

A peninsula projects into circulation space, so its outer corners usually take a radius rather than a point, and that radius is agreed at template rather than assumed. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The units stay, the surface changes. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What has to be finished before you can template?

Taped internal angles in plasterboard belly at the corner, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. This is the commonest reason a replacement turns out to need more than a straight swap. The sill was always low. Nobody had to care until now. Book the service lift, loading bay and concierge access for the full day, and confirm the building's permitted working hours in writing. Some doors in a building need a consent letter and some need nothing at all, so the first question is which arrangement applies here rather than which one is usual. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Out and in on the same permission.

07

Do you take the old worktop away?

Old tops are screwed or glued from underneath, so the drawer boxes come out before the worktop does. Disposal means it goes in the van, not into the garden to wait for a collection. Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. A bay shared across a parade of shops turns over all day, so the arrival time matters more than the length of the booking does. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. A suspension for the full day beats half a day lost.

08

Is the quote a fixed price or an estimate?

Ask for the lines rather than the total. One number for a kitchen tells you nothing you can check. What moves the figure after templating is a change you make: a different edge, an extra cut-out, a bigger sink chosen late. Plumbing, gas and electrical work are not in the figure, because we do not do them. Where a partition has been built off the floor screed rather than off the slab, it moves, and a mitre bonded across that corner is the first thing to open. We would rather find it at template than on the morning, which is why the templater looks behind the units. A straight swap is the exception in an older room.

09

What happens when the route into a Paddington kitchen is tighter than the worktop?

Splitting a run costs a join, and that is the price of getting stone into the room at all. The alternative to a join is a shorter run, which is usually the wrong thing to trade away. An external stair, a side return or a rear garden counts as carry and is measured the same way. Booked delivery windows on a managed estate run to an hour, and a worktop install does not happen inside an hour. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Cutting a top down indoors means emptying the room first.

10

Do you cut drainer grooves on Paddington kitchens?

They are cut with a fall towards the bowl, which is why they cannot be added on site later. Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. Where there is no room for a separate drainer, grooves are usually what gets specified instead. Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Nothing new goes down until the run reads level end to end.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review

Next step

Worktop replacement in Paddington, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.