Greenwich · SE18

Worktop replacement in Plumstead

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Plumstead kitchens

The kitchens we meet in Plumstead

The part of worktop replacement in Plumstead that surprises people is how much of it is decided before anyone touches a slab. Tight Victorian terraces stepping up the hill, most with a narrow back-addition kitchen, and a high proportion of flat conversions where the kitchen has been fitted into whatever room was left. Straight galley runs of 2.4m to 3.2m, wall units both sides, no island. None of that changes what you pay in Plumstead. The figure is set at template and it holds from there.

Party wall settlement pulls the floor down at one side of the room, so a long run reads level at one end and not at the other. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Cutting the old top out saves the units below it.

Floors are the original joists with a later acoustic layer laid over them, and that layer is not flat where it meets the doorways. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. The old top hid it; the new one will not.

The building stock is dense Victorian terrace, Edwardian terrace, postwar estate and 1980s infill. Two of those can sit on the same street and quote a long way apart.

Undermounted sink cut-out in a quartz worktop
  • dense Victorian terrace
  • Edwardian terrace
  • postwar estate
  • 1980s infill

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Greenwich
Postcodes
SE18
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Plumstead is its own job

A fit in Plumstead is planned around the building it is going into, which is what the survey is for. Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads, the carry is usually uphill and through the house rather than round the side. Old lath-and-plaster and soft brick mean scribing to bowed walls is normal; assume the back wall is out by 15mm over 3m. Every kitchen we template in Plumstead gets measured on its own terms, and the quote is built from those measurements.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. We take the old surface off, check the carcasses are sound and level, and fit the new tops the same day. Disposal of the old worktop is a separate line on the quote rather than folded into the price. You end up with tiling, sealant and the wall line all finished against the new surface, so there is no strip of old grout left showing where the previous top used to sit.

A replacement is measured against the kitchen standing in the room today rather than the layout it was fitted to years ago. Laminate lifts light and long, so the difficulty is turning a three-metre length in a small room rather than carrying its weight. Original cabinets are long gone here, and what comes out is a flat-pack run that has spent fifteen years on a cold solid floor. You keep the kitchen; only the top is new.

Sink cut-outs See the options

The money

What it costs in Plumstead

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. For a rough sense of the material, £110 to £550 per square metre supply only is the honest span. Treat it as one line of a quote that will carry several more. No surprises pulled out from under the old top.

Victorian and Edwardian terraces

What Plumstead asks for

More of our week goes on this than on worktop fabrication put together.

Victorian and Edwardian terraces

The carry, and what it rules out

Two people will walk a two-metre piece in through a front door; the same hall with a three-metre piece wants four, purely because nobody can let go halfway. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. Where it will not come out whole it comes out in sections.

Victorian and Edwardian terraces

Plumstead in the housing figures

Around here the bands run low by London standards. The units stay and only the surface changes, so the whole job turns on what the carcasses will take. Booked around what the stock actually is.

Access

Getting stone into a Plumstead kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Plumstead is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Plumstead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Plumstead on your patch?

Yes. Plumstead is on the patch, and the postcodes we work here are SE18. It is worked on our south east London run, along with the rest of Greenwich. A bay suspension carries a fee and a notice period, and the notice period is the part that catches people out when a date moves. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Old stone is heavier going out than it looked coming in. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

Does the housing in Plumstead change how worktop replacement works?

The communal stair is wide and handsome and the flat door at the top of it is a standard leaf, which is where a long piece stops. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Same units, straighter line, better surface. A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. This is the commonest reason a replacement turns out to need more than a straight swap. It was there long before we were.

03

How does the stone actually reach a kitchen in Plumstead?

The front door is often the cheapest hundred millimetres on the route, because a door lifted off its hinges gives back the width its own thickness was taking. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Cutting a top down indoors means emptying the room first. Some zones are controlled for a short window in the middle of the day and open either side of it, which makes the timing of the visit the whole question. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The van has to stand through both halves of the day.

04

Is worktop replacement the job you do most in Plumstead?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop fabrication. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Old top out Tuesday, tenant in on Friday. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. The carcasses have to be sound, because stone is several times the weight of what is coming off. The flat earns nothing while it sits empty.

05

What am I actually paying for, line by line?

Where the sink and the hob face each other across the aisle, everything carried between them crosses the walkway, and that is the one movement the shape cannot design out. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Same shape, different cut list. The stone is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted separately.

06

Is there anything I have to finish before the template in Plumstead?

Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. We would rather find it at template than on the morning, which is why the templater looks behind the units. The old top hid it. The drawing will not. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Disposal is named, not assumed.

07

Do I have to get rid of the old tops myself in Plumstead?

Carcasses stay. Surface changes. That is the whole of it. Take the old tops off yourself if you would rather, and the quote simply carries one line fewer. The template can be taken with the old top still down, which is why one visit covers both. A suspension only works if the cones and the notice are actually there on the morning, and now and then a car is sitting in the bay regardless. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. A one-hour window will not hold a two-way job.

08

Which materials need sealing and which do not?

Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Marble is the one people underestimate. It is porous, like granite, and wants sealing. Kitchens in the upper flats often sit in the return wing at half-landing level, so there are three or four steps inside the flat before the room is reached at all. Carcasses are checked for square and fixed back before a stone top goes on them. The wall behind the old top has not been seen in years.

09

Can you fit stone I have already bought for a Plumstead kitchen?

Thickness has to be known before quoting, since it decides the edge, the cut-outs and what the units carry. Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. Remnants bought elsewhere are the awkward case, because the drawing is then made to fit the stone. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. Old tops out in the morning, new stone down and sealed the same afternoon. Same day, because the void is the whole budget.

10

What do drainer grooves add to the job?

A groove set is its own item on the quote rather than something rolled in with the sink cut-out. Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. The bowl position has to be settled before templating, since the grooves are set out from it. Gas, waste and later wiring were boxed in against the wall long after the house was built, and that boxing is what the run has to clear. Taking the old tops off is also the first honest look at what has been going on underneath them. Door fronts and drawers get checked against the new thickness.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Worktop replacement in Plumstead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.