Skip to content

Greenwich · SE18

Worktops in Plumstead

The surface itself: which stone, what it costs by the square metre, and what the room does to that number.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Plumstead kitchens

The kitchens we meet in Plumstead

dense Victorian terraceEdwardian terracepostwar estate1980s infill

A survey is where stone worktop supply and fitting in Plumstead stops being a guess, because until someone has stood in the kitchen nobody knows what it is going to ask for. Tight Victorian terraces stepping up the hill, most with a narrow back-addition kitchen, and a high proportion of flat conversions where the kitchen has been fitted into whatever room was left. Straight galley runs of 2.4m to 3.2m, wall units both sides, no island. Bring us the problem rather than the diagnosis. Working out what you have got is the first thing we do.

The side return was an outside toilet and a coal store before it was ever a kitchen, and the walls left over from that are half a brick thick. Weight arrives as a figure per square metre and turns into a question about the floor, which is worth asking in any building where a timber span carries the kitchen. What the room does to the number is most of the number.

The flat entrance door is a certified fire door on a closer, and taking it off for an hour means dealing with the seals and the closer before the day ends. Rooms in these houses run long and narrow with the only honest daylight at the garden end, so a pale honed surface does more for the working half of the kitchen than any colour with depth in it. Even light lets a mid-tone hold its own.

The stock behind these kitchens runs to dense Victorian terrace, Edwardian terrace, postwar estate and 1980s infill. Which of those you have decides most of what follows.

True everywhere

Worktops, in short

  • Supply is £110 to £550 per square metre across the 181 surfaces we fit.
  • Quartz runs £130 to £500 per square metre, granite £121 to £550 and Dekton £110 to £366.
  • Templating is done in the room itself, once the units are fixed and level.
  • Fitting happens five to ten working days after the template is taken.
Borough
Greenwich
Postcodes
SE18
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Plumstead is its own job

Every kitchen we template in Plumstead gets looked at for access and for what the walls are going to do to the run. Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads, the carry is usually uphill and through the house rather than round the side. Old lath-and-plaster and soft brick mean scribing to bowed walls is normal; assume the back wall is out by 15mm over 3m. Once the template is signed off the price is fixed. It does not move because the job turned out fiddly.

The work

What worktops involves

The material carries a twenty five year guarantee and the fitting workmanship five years, and both are handed over in writing with the paperwork for the slab. Fitting follows the template by five to ten working days, and the pieces arrive finished, with joins bonded in a resin mixed to the colour of the slab. You get an itemised figure that shows what the slab cost, what the edges cost and what the openings cost, so the layout can be adjusted before anything is cut.

That figure per square metre buys the slab and nothing else. Machining, edge work, openings and fitting are separate lines, which is why a rate is never a bill. Twenty millimetres and thirty millimetres are the two thicknesses that matter, and twenty with a laminated front edge gives the look of thirty without the slab cost of it. Painted period joinery and tall ceilings carry a thicker front edge comfortably, and a slim one tends to look apologetic beside them. Machined to the millimetre and guaranteed by the decade, not the year.

Undermounted sink cut-out in a quartz worktop
Sink cut-outsSee the options

The money

What it costs in Plumstead

The rate per square metre buys stone and nothing else, so the machining, the openings, the polished edges and the fitting are set out beside it rather than folded into it. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. The catalogue starts at £110 per square metre at the plainest end and reaches £550 at the top, supply only, with the same fabrication work sitting behind either choice. The slab, then the machining, then the fitting, each on its own line.

Victorian and Edwardian terraces

The carry, and what it rules out

An inward-opening door swinging back against the wall leaves less clear opening than the frame measures, and a storm porch in front of it is tighter again. Scuffing on the way in lands at the arris, so a punishing approach argues for a softened profile and for battens under every face that has been finished. Damage in transit lands on corners, so corners get eased.

Victorian and Edwardian terraces

What Plumstead asks for

Infrequent work for this area, though we do it whenever it is asked for. Worktop replacement and worktop fabrication are the commoner calls. Nothing about the method or the standard varies with frequency.

Victorian and Edwardian terraces

Plumstead in the housing figures

Around here the bands run low by London standards. Where homes are specified in bulk the yield question is answered across a whole scheme, and the waste factor falls once several rooms nest together. Tight spaces can afford an expensive material; sprawling ones frequently cannot.

Access

Getting stone into a Plumstead kitchen

Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads, the carry is usually uphill and through the house rather than round the side.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

south east London patch

Plumstead is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Plumstead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Plumstead far enough out to be a problem for you?

Yes. Plumstead is on the patch, and the postcodes we work here are SE18. It is worked on our south east London run, along with the rest of Greenwich. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. A granite kitchen ends its day with a sealer, and a sealer wants a dry face and a quiet hour afterwards, so that hour is written into the day rather than borrowed from it. The offcut is yours if you want it and ours if you do not. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

What should I expect from worktops in a Plumstead kitchen?

Boxed sash frames swallow a hundred millimetres of wall on each side of the opening, so the wall between a window and a corner is shorter than a plan makes it look. The kitchen in one of these sits in the back addition and takes its daylight from one end, so the working half of the run is the darker half and a pale stone with a honed or matt face does more there than any colour with depth in it. Two slabs change the question from price to preference. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. Every notch and every scribe is machined into the piece before it leaves the works, and a hard sintered surface is the least forgiving of a tight internal corner, so one is always cut with a generous radius. A cranked piece eats more slab than the two straights it replaces.

How would you get a worktop into a property in Plumstead?

A step up off the pavement means the piece is lifted to the threshold before it is carried anywhere, and that first lift is the one that wants four hands. That caps the longest piece, and a run split into two lengths nests differently on the slab, which moves the yield and moves the figure with it. A long granite length at full thickness is four hands, not two. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. Sintered surfaces are the hardest of the three to machine and the messiest to cut wet, which is precisely why none of that happens on a public pavement. A sealer needs a dry face and a quiet hour after it.

Do you get much worktops work in Plumstead?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement and worktop fabrication. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Where several kitchens are ordered together the sensible move is to take them all off one batch, because two slabs of the same name bought six months apart will not sit happily in the same building. A surface for a let flat is chosen for the next tenant, not this one. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. Volume work tends to live at the entry end of the range, and the entry end is genuine stone rather than a compromise, since the lowest supply figure we quote is a sintered surface and not a thin laminate pretending to be one. Where the cooking is serious, heat tolerance leads the list.

What moves the number on a quote around here?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. A shape like that nests kindly on a slab, so more of what gets bought ends up on the units and the rate per square metre behaves much as the brochure says it will. Long unbroken lengths are what make a plain stone look dear. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

What state does a Plumstead kitchen have to be in before you template?

A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. A hob dropped into the middle of a length puts sustained warmth at the lip of a cut-out, and an engineered surface will yellow there across ten years where a natural one takes it without comment. Short lengths are where a full slab starts to pay for itself. Send the run lengths, say where the sink and hob will sit, and tell us which way the room faces and what lighting is going in above the working run. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. That changes which questions are worth asking about the stone, because somebody staying put wants to know how a honed face marks in five years and somebody selling wants to know how it photographs next spring. A let kitchen is specified for indifference, and rightly so.

Can I have stone up the wall in a Plumstead kitchen?

A full-height piece behind the hob has to allow for the extractor, so that gets settled first. Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. Original shutter boxes survive in the reveals of the front rooms and stand proud of the plaster, and that is the line a run under the window has to be scribed to. The alcoves either side of a breast break the run into short pieces, and short pieces are exactly where buying a full slab outright starts to beat buying stone by the metre. The island earns the liveliest part of the stone.

Does a stone worktop need sealing?

Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Topping a seal up is a wipe-on job with a cloth. Where the kitchen has taken the bay, the end of the room is three facets of glass set at angles and there is no straight wall left to finish against. Ceilings are tall and the joinery is usually painted, which is the setting where a thirty millimetre edge looks right and a slim one reads as a saving somebody made. Movement needs length, and length is what these rooms have.

What happens if my units are not level?

The check comes before the measuring rather than after, because the whole drawing is set out from that plane. A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. A run that sits under strong sun for hours every afternoon suits a surface built to be stable in daylight, because a resin-bound stone is made for indoor use and sustained sunlight is the one thing it was never designed around. The narrowest return in the kitchen is its weakest stone.

Are drainer grooves cut on site or in the workshop?

Grooves are machined into the surface rather than applied to it, so there is nothing to come loose later. Where there is no room for a separate drainer, grooves are usually what gets specified instead. They read strongly across a dark stone and are nearly invisible on a pale one, so look before deciding. Party wall settlement pulls the floor down at one side of the room, so a long run reads level at one end and not at the other. Which stone belongs on top of all that is a separate question from the building itself, and it is the one with a figure attached, because supply alone runs from £110 to £550 per square metre before a single cut has been made. Edges are charged along their length, not across the surface.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!

esther boadu

Google review · granite

Nice work from worktop worx. Highly recommended

Rasika Kumarage

Google review

Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation

Loreta Skalisiene

Google review

Next step

Worktops in Plumstead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489