The building, and what it does to the job
Taken across Queen's Park and the roads either side of it, the great majority of the housing predates the First World War. Nothing is bonded until every piece has been offered up and the run sits flat. Protection down before the first piece comes through.
Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. Communal areas are protected from the entrance to the flat door, because the building notices a mark long before the client does. Soft brick takes a different plug to blockwork.
Because the side return has been built over, there is no side access left on most of these houses, so hall width and the stair newel decide the maximum piece.
The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. It adds an hour or two to the day, and that time sits in the schedule rather than being taken out of the finishing. Packers go under the carcass, never under the stone.
