Sutton · SM6

Splashbacks and upstands in Roundshaw

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Roundshaw kitchens

The kitchens we meet in Roundshaw

If you have had one quote for splashback and upstand work in Roundshaw and it did not match the next one, the difference is usually sitting in the room itself. Built on the old Croydon Airport land and largely rebuilt since, so the housing is modern-estate standard: compact kitchens of around 2.7m in an open-plan or semi-open layout, with a washing machine in the run because there is no utility. Guessing at this stage would only put a wrong number in front of you, so we do not do it.

Windows sit high and the sill line crosses the middle of the run, which limits what can go above the worktop. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. Full height needs a flat wall and a finished electrician.

The chimney breast in the kitchen served a back boiler behind the living room fire, so the flue is a shared one and the breast is deeper than a fireplace would need. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Where the plaster undulates, the shorter piece wins.

On these streets the housing is 1970s estate housing, 1990s-2000s rebuilt estate housing, low-rise flats and housing association terrace. None of them is harder than the others; they are awkward in different ways.

Polished stone edge profile close up
  • 1970s estate housing
  • 1990s-2000s rebuilt estate housing
  • low-rise flats
  • housing association terrace

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
Borough
Sutton
Postcodes
SM6
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why Roundshaw is its own job

A slab cut to the wrong assumption about Roundshaw is scrap, so the assumptions get checked in person first. Parking courts and pedestrian decks rather than roadside frontage, controlled bollards on some routes, and communal entrances to the flatted blocks with an intercom. With the washing machine in the worktop run the cut-outs sit close together, so the piece needs a support rail across the appliance gap or it will flex when the machine spins. That is why we survey Roundshaw kitchens first and quote second. Working the other way round is how deposits turn into arguments.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Behind a hob the choice of material stops being about looks: a resin-based surface will mark under sustained heat where a sintered one will not. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. Electrics in these flats were often surface-run in conduit, and stone will not sit flat over trunking that stands proud of the plaster. Machined to the room, not trimmed to it.

Edge profiles See the options

The money

What it costs in Roundshaw

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Across the catalogue the supply-only rate is £110 to £550 per square metre, before any of the work that turns a slab into a worktop. Height is a decision with a figure against it.

ex-local-authority flats and estates

What Roundshaw asks for

Where the provider has set the specification the material choice was made once for a great many kitchens, and the useful work is meeting it exactly rather than proposing something else on the day. Full-height panels need the wall made good first, which is another trade and another timescale. Plastering finishes on somebody else’s timescale.

Worktop replacement is what these streets ask for most; this comes next. Nothing about the process changes.

ex-local-authority flats and estates

Roundshaw in the housing figures

In this corner of the borough, the housing went up after the First World War, so the walls run truer than the London average. On a bowed run an upstand can be scribed in, where a single sheet would sit proud at one end. Measured off the fitted top, not the drawing.

Access

Getting stone into a Roundshaw kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South London patch

Roundshaw is covered on our south London run, along with the rest of Sutton.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Roundshaw

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Roundshaw, or is it a subcontractor?

Yes. Roundshaw is on the patch, and the postcodes we work here are SM6. It is worked on our south London run, along with the rest of Sutton. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. The crate stays on the van until the route in is clear. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop splashbacks & upstands in Roundshaw?

Meters were moved out to a box on the flank wall on a later programme, and the cupboard they came out of is usually still standing in the corner. That suits a full-height piece, because a large flat panel bonded across its back is more stable on concrete than a run of small tiles ever was. The tile bed comes off before anything is measured. Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed along the top edge as well.

03

Is access a problem in Roundshaw?

A height barrier on the car park entrance rules out a tail-lift van outright, and the stone then transfers to a trolley at the barrier itself. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Break positions are chosen for the carry. A skip, a delivery lorry or a run of scaffolding takes the frontage the van needed, so the street is worth a look the day before rather than on the morning. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Distance from tail lift to door is the whole risk here.

04

Does worktop splashbacks & upstands come up often in Roundshaw?

It is one of the three that come up most, though worktop replacement comes up more. Nothing changes between them: same template, same workshop, same installers. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. A spare panel is cheaper now than next year. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Reordered next year, it will not match.

05

What makes one Roundshaw kitchen dearer than the next?

Handles on opposing runs meet in the middle of the aisle, so a deep edge profile specified on both sides takes width out of the standing space twice over. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Behind an island there is no wall to hide against. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What holds a template up more often than anything else?

A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The obstruction breaks the length, every time. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Residents are given written notice before anyone attends, and that notice period rather than the workshop is what governs the earliest sensible start. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Priced on its own line so it can be deferred.

07

What happens if a piece will not go up the stairs?

Where there is a lift, whether it can be booked out and padded matters as much as its size. The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. If a piece cannot be got in at all, we say so at the template rather than on the day. Concierge buildings want the goods entrance, a booked lift and proof of insurance, all of which is straightforward when it is asked for a week out. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A tall panel cannot be tilted to clear a turn, so it is sized not to need to.

08

How many joins will a Roundshaw kitchen need?

A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. An island often runs in one piece where a wall run cannot. Older houses put the boiler or the meter on one of the two walls, and whatever is boxed in around it sets the point where that run has to stop. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Socket cut-outs are machined, not chipped in on site.

09

What happens to the worktop that comes off?

Disposal means it goes in the van, not into the garden to wait for a collection. An old stone top is heavier coming out than the new one is going in, and leaves in sections. The sink and hob are lifted out with the old top and kept aside if you are reusing them. Where parking runs down both sides the road is left as a single lane, and a van standing in it has to be somewhere it does not stop a bin lorry. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. A long carry turns a light piece into an awkward one.

10

What if a piece cracks while it is being carried in?

Every piece is dry-assembled on the bench before it is loaded, so a fabrication mistake is found in the workshop rather than in your kitchen. The workmanship guarantee runs 5 years on every kitchen we fit. Floors and units are protected before anything comes through the door. Bollards, planters and a one-way service road can turn what looks like a ten-metre carry into a fifty-metre one. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Panels are carried on edge from the tail lift to the wall.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review

Next step

Splashbacks and upstands in Roundshaw, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.