Croydon · SE25
Splashbacks and upstands in Selhurst
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Selhurst kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The wall decides, not the brochure.
Terraced and semi-detached stock with modest rear kitchens, mostly straight runs of 2.7-3.2m with the boiler and the back door competing for the same wall.
Match-day traffic and parking restrictions around the stadium close streets off at short notice, and the rest of the time the terraces have no off-street parking at all. We check the fixture list before booking a fit here, because a Saturday delivery on a home game day means the van will not get down the street. A lot of tenanted properties, so hard-wearing finishes and simple layouts rather than islands.
Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Decided before fabrication starts.
The stock behind these kitchens runs to Victorian terrace, Edwardian semi, post-war infill and converted flats. Which of those you have decides most of what follows.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the New Malden patch. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
The building, and what it does to the job
Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed, dubbed out, or set proud. Pick one.
Victorian and Edwardian terraces
What gets asked for here
It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.
Victorian and Edwardian terraces
True everywhere, stated once
What decides between a slim upstand and a full-height splashback is nearly always the wall: what it is made of, how flat it is, and where the sockets ended up.
Access
Getting stone into a Selhurst kitchen
Match-day traffic and parking restrictions around the stadium close streets off at short notice, and the rest of the time the terraces have no off-street parking at all.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Selhurst is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Selhurst
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Selhurst, or just list it?
Yes. Selhurst is on the patch, and the postcodes we work here are SE25. It is run from the New Malden side, covering South West London & Surrey. On an event day the controls are wider, tighter and enforced harder than the signage suggests on any other morning of the week. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in Selhurst?
Lease conditions and the other flats in the building decide when noisy work can happen, so the fitting day has a start and a finish that are not ours to set. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Decided before fabrication starts. We check the fixture list before booking a fit here, because a Saturday delivery on a home game day means the van will not get down the street.
Is access a problem in Selhurst?
Match-day traffic and parking restrictions around the stadium close streets off at short notice, and the rest of the time the terraces have no off-street parking at all. Garden routes carry their own hazards: a drain cover, a step up to a patio, wet decking, or a lawn that will not take a loaded trolley. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Do you do much worktop splashbacks & upstands around Selhurst?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day.
What decides the price of a worktop in Selhurst?
Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
A notch around a boxed stack is machined with a radius at the internal corner, because a square inside corner there is exactly where a top will crack. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.
Related
More around Selhurst
Other work we do in Selhurst
Next step
Splashbacks and upstands in Selhurst, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.