Lambeth · SW16

Splashbacks and upstands in Streatham Vale

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Streatham Vale kitchens

The kitchens we meet in Streatham Vale

A good quote for splashback and upstand work in Streatham Vale reads like a description of your kitchen rather than a price list, and that is deliberate. Uniform interwar semis with rear kitchens roughly 2.5m by 3m, and the standard project is a small rear extension or a knock into the dining room giving an L with a breakfast bar. Islands are rare because the extended room is used as a dining space instead. You do not have to work out which of those you have. We will look at it with you when we come to Streatham Vale.

These kitchens have usually been retiled twice and knocked through once, and both of those leave marks the worktop has to deal with. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Height is taken at the shortest point of the run.

The room is wide enough that an island turns up in nearly every scheme, and how far the drainage can be taken is what fixes where it sits. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Panels expose a wall; upstands forgive one.

The stock we template in here is 1930s semi, Interwar terrace and Postwar infill. The one you have sets the piece length before the kitchen does.

Undermounted sink cut-out in a quartz worktop
  • 1930s semi
  • Interwar terrace
  • Postwar infill

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
Borough
Lambeth
Postcodes
SW16
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why Streatham Vale is its own job

Because we work across Streatham Vale rather than one street of it, we know which questions are worth asking up front. Streets are quieter and largely uncontrolled compared with the Streatham high road, and many houses have hardstanding or a dropped kerb. The railway line and the limited crossings mean the approach route needs checking, and side alleys are around 780mm at the gate. These houses almost all still have the original back-boiler flue or a boxed vertical duct in the kitchen corner, so allow for a notched return leg as a matter of course. Have a look at the itemised quote and you can see what the building is costing and what the stone is costing.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. The height is settled first, since a slim upstand and a full sheet up to the wall units are different pieces of work and the wall between them is where the decision shows. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. Where a run is longer than one sheet will give, the split is put on a vertical that lines up with a cabinet gable or the end of the hob. These kitchens were pushed into the side return at some point, and the seam between original brickwork and newer plaster falls exactly where a tall sheet wants to sit. Cut from the slab the worktop came out of.

Sink cut-outs See the options

The money

What it costs in Streatham Vale

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. One continuous L takes more slab than its metreage implies, because the waste sits inside the angle. Two quotes can agree on a supply rate of £110 to £550 per square metre and still land a long way apart, because the cut-outs, the joins and the edge profile are priced after it. Priced by the edge and the openings, not the wall.

1930s and inter-war semis

The carry, and what it rules out

Grass and gravel will not take a loaded trolley, so a boarded track gets laid from the gate to the door before the first piece moves. A panel cracked on the way in is a full remake, because there is no repairing a polished face close to an edge. Full height goes in only where the way in allows full height.

1930s and inter-war semis

What Streatham Vale asks for

It would be overstating it to call this a speciality on this patch. Worktop installation and worktop replacement are far commoner. None of that changes the survey, the cut list or the fit.

1930s and inter-war semis

Streatham Vale in the housing figures

In Streatham Vale, most of the stock dates from the building boom of the twenties and thirties. The kitchens are compact, so the fixed lines outweigh the stone. The same wall build-up comes up again and again, so what works on one holds for the next. Set out around the sockets as they actually are.

Access

Getting stone into a Streatham Vale kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South London patch

Streatham Vale is covered on our south London run, along with the rest of Lambeth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Streatham Vale

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Streatham Vale on your patch?

Yes. Streatham Vale is on the patch, and the postcodes we work here are SW16. It is worked on our south London run, along with the rest of Lambeth. Where the drive is shared, the half-hour the van spends in the way is agreed with the neighbour in advance rather than apologised for at the time. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A panel carried past a live lane gets a second pair of hands. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

What should I expect from worktop splashbacks & upstands in a Streatham Vale kitchen?

The boiler has usually been moved out to the garage or the utility, leaving a capped flue and a run of dead pipework in the kitchen wall. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. What the wall can take decides how tall the stone goes. A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The sill caps the upstand before anything else does.

03

How would you get a worktop into a property in Streatham Vale?

A step up to a patio or a raised threshold at the back door means the piece is lifted rather than rolled, and that is where the crew size gets decided. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Upstands make almost any turn a worktop will not. A step up from the drive to the threshold turns the last two metres into a lift, and a lift is where two pairs of hands become the minimum. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Nothing this long gets walked while a warden is circling.

04

Is Streatham Vale really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation and worktop replacement. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The annexe gets the same panel as the main run. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. A repeated spec needs a repeatable splashback.

05

What moves the number on a quote around here?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Every internal corner is two pieces, not one. The stone is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted separately.

06

What state does a Streatham Vale kitchen have to be in before you template?

Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A downstand sets the panel height, not the wall units. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Upstand height taken from the specification.

07

When do I pay for a Streatham Vale worktop?

Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Behind the boxing it becomes two pieces.

08

What do drainer grooves add to the job?

Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. The bowl position has to be settled before templating, since the grooves are set out from it. Where there is no room for a separate drainer, grooves are usually what gets specified instead. The original plan put a larder and a back door on the same wall, and both leave awkward stubs once the room is opened up. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. A chimney breast breaks a panel run regardless of the drawing.

09

Which materials need sealing and which do not?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. The bead where the sink and hob meet the stone is siliconed rather than sealed, and wants watching. No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. Air bricks that once ventilated the original floor now open into the extension, and one of them is generally sitting behind a base unit. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. Old walls lean back, and a tall panel shows it.

10

How do you cut out for an undermounted sink?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. Each cut-out is priced on its own line, so a range, a bowl and a half, a boiling tap and a drainer are four items rather than one. Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Long walls break where the worktop breaks.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Splashbacks and upstands in Streatham Vale, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.