Barnet · NW11

Worktop replacement in Temple Fortune

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Temple Fortune kitchens

The kitchens we meet in Temple Fortune

Getting worktop replacement in Temple Fortune right is mostly a matter of knowing what you are dealing with before the order goes in, and that means looking properly. Flats above the distinctive shopping parades have small, awkwardly shaped kitchens set into the roof and gable spaces with sloping ceilings that rule out wall units above part of the run. The surrounding houses are comfortable interwar semis where the kitchen is knocked through to the dining room for a 3.6m run and a peninsula. Ask for the design and quotation visit. It is free, it carries no obligation, and it settles all of this properly.

Crittall windows were swapped for plastic ones in openings that were made good rather than rebuilt, which leaves reveals that are neither straight nor equal. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. A single day, planned properly.

Rear windows are wide and low with a deep tiled cill, and that cill decides how tall the upstand behind the sink can be. The recess is measured again once the old top is out, since the original fit was often cut to whatever it found. Tile beds and adhesive come off before the new top goes on.

What the surveys keep coming back to is Arts and Crafts style parade with flats above, 1920s-30s semi and purpose-built mansion block. The run length that is easy in one is a join in another.

Mitred waterfall edge detail on a quartz island
  • Arts and Crafts style parade with flats above
  • 1920s-30s semi
  • purpose-built mansion block

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • A run longer than a single slab arrives in pieces, with a join between them.
  • Up to four quartz samples are posted free before you commit to a colour.
  • The new material is guaranteed for 25 years and the labour for five.
Borough
Barnet
Postcodes
NW11
Covered on
our north London run
Fitted
5–10 working days from template

The place

Why Temple Fortune is its own job

Getting a worktop into a kitchen in Temple Fortune and getting it to sit right are the parts worth planning properly. Flats over the parades are reached by narrow shared stairs from the rear yards, with no lift and a turn at each landing; Finchley Road frontage has loading restrictions and constant bus traffic. Sloping ceilings over part of the run mean the slab cannot be tilted upright at that end, so it has to enter the room already close to horizontal. That is the sort of thing we come and look at in Temple Fortune before we quote, not after you have committed.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

A replacement is priced in three parts: the new stone, the work of taking the old top out, and carting it away afterwards. Sink and hob are settled before the templater attends, because a change to either changes the cut-outs and cannot be added later. Kitchens in these were pushed into the old scullery, so half the run sits on newer cabinets and half on what came before. You keep the kitchen; only the top is new.

Waterfall ends See the options

The money

What it costs in Temple Fortune

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. Two quotes can agree on a supply rate of £110 to £550 per square metre and still land a long way apart, because the cut-outs, the joins and the edge profile are priced after it. You keep the units, and you see what that saves.

period detached houses and villas

Temple Fortune in the housing figures

In Temple Fortune, almost nothing has gone up in the last fifteen years, which makes the carcass check the first question rather than the last. A heavier surface may need the cabinets braced, which is settled once the old laminate is lifted. What comes off tells us what goes on.

period detached houses and villas

What Temple Fortune asks for

Whatever else we are booked for here, it is usually this. Then worktop installation.

period detached houses and villas

The carry, and what it rules out

Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. Nothing goes out until the route back to the van is clear.

Access

Getting stone into a Temple Fortune kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

North London patch

Temple Fortune is covered on our north London run, along with the rest of Barnet.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Temple Fortune

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Temple Fortune?

Yes. Temple Fortune is on the patch, and the postcodes we work here are NW11. It is worked on our north London run, along with the rest of Barnet. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The old tops leave in one movement rather than piece by piece. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

Does the housing in Temple Fortune change how worktop replacement works?

These went up as handed pairs, so in one house of the two the kitchen sits against the party wall and in the other it takes the alley side, and only one of them has an outside wall to work with. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. A replacement is measured against the walls as they are now. A cill projecting forward of the plaster line pushes the back edge out, and the units then stand off the wall by that amount for the whole length. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The sill was always low. Nobody had to care until now.

03

How does the stone actually reach a kitchen in Temple Fortune?

A piece carried on edge up a flight has to clear the ceiling above the stairs as well as the walls either side of it. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The route is protected once and then used four times. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Where the van must move, the waste goes on first.

04

Does worktop replacement come up more than anything else in Temple Fortune?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Four flats, four days, no scaffold week. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The carcasses have to be sound, because stone is several times the weight of what is coming off. Cam-lock carcasses get braced before stone lands.

05

What am I actually paying for, line by line?

A peninsula is an island with one end tied to a run, which means the join between them has to be planned rather than allowed to happen. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Any overhang gets underpinned first. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

06

Is there anything I have to finish before the template in Temple Fortune?

Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. We would rather find it at template than on the morning, which is why the templater looks behind the units. A straight swap is the exception in an older room. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. The surface changes and the kitchen stays the one they know.

07

Does a stone worktop need sealing?

A seal is not waterproofing. It only buys time to wipe a spill up. Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. A serving hatch through to the dining room was standard, and where it has been blocked up the patch sits on a different plane to the wall either side of it. What catches people out is the junction between the old floor and the extension floor, which is rarely at the same level, so a run carrying across it needs the units packed before stone goes on. The floor has dropped since the kitchen went in.

08

Do the template and the fit happen on the same visit?

If the units run late the template moves, not the fit: the gap between them is fabrication. The design and quotation visit comes first. It is free and carries no obligation. Nothing is measured until the sink, the tap and the hob are in the room to measure against. Ceilings are lath and plaster at the front and plasterboard in the extension, and the join between the two marks where the original back wall stood. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. What comes off tells you what goes on.

09

Do you take on fitting-only work in Temple Fortune?

Templating, fabrication and fitting are the same three lines whether the stone came from us or from you. The quote is itemised, so a job where you already hold the slab is the same job with the material line taken off it. Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Old tops out in the morning, new stone down and sealed the same afternoon. Housings set out for laminate are checked first.

10

Are drainer grooves cut on site or in the workshop?

The grooves sit inside the depth of the top with stone left either side, so a shallow run limits them. A groove set needs a clear stretch of worktop beside the bowl, so it competes with the run for length instead of being free surface. The consumer unit and the meter often sit high on the wall at one end of the kitchen, and neither of them is going to move to suit a run of stone. Taking the old tops off is also the first honest look at what has been going on underneath them. Stone is far heavier than what is coming off.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Worktop replacement in Temple Fortune, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.