Hammersmith and Fulham · W12

Splashbacks and upstands in White City

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

White City kitchens

The kitchens we meet in White City

Most of the splashback jobs we do in White City land in one of a few kinds of kitchen, and which one you have changes the job long before the stone is ordered. Two extremes on the same postcode: 1930s estate flats with small closed kitchens of 2.0-2.6m and original ventilated larder recesses, and brand-new tower apartments with open-plan islands of 2.4-3m over a fixed services box. In the estate blocks the kitchen window is deep-set in a thick wall, so the worktop needs a generous scribe at the sill end. We would rather find the awkward corner now than on the day the stone arrives in White City, so the survey looks at everything.

Kitchens in this stock are compact and reasonably square, which makes the fixed lines a larger share of the total than the material is. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. Panel joints land over a unit line, never mid-span.

Some of these are dry-lined on battens over the concrete, so a fixing either finds a batten or goes straight through to the panel behind. The rough band left where tiles took the plaster with them is covered by the upstand rather than made good twice. A reveal in a thick wall changes where the panel stops.

Locally the mix runs to 1930s balcony-access estate block, postwar maisonette, 2010s-2020s high-rise apartment tower and former television studio conversion. What the units are screwed to varies between them, and that decides the fixings.

Worktop join finished flush against a wall
  • 1930s balcony-access estate block
  • postwar maisonette
  • 2010s-2020s high-rise apartment tower
  • former television studio conversion

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
Borough
Hammersmith and Fulham
Postcodes
W12
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why White City is its own job

Working in White City regularly means we plan for what catches people out here rather than finding it on the day. The older blocks are balcony access, which means the last leg is an open external walkway with a handrail on one side and front doors on the other - a slab on edge has to be walked, not wheeled, and wind on the upper decks is a genuine factor. New towers are the opposite: booked bay, goods lift, protection kit, and a security desk that will not let you past without a sign-in. On the 1930s decks the wind will catch a slab on edge above the third floor, so carry it flat to the door and stand it up inside. Fitters who templated the room turn up to fit it, which is why the awkward bits are already accounted for.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. Behind a hob the panel usually rises higher than the rest of the run and stops at the extractor instead of at the units. Concrete panel construction in these blocks will not accept a plug, so bonding a sheet to it suits the building better than fixing through would. Stone behind the hob, not grout.

Corners and joins See the options

The money

What it costs in White City

Sockets and switches are cut-outs like any other, and their number does more to the price than the height of the panel does. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. If you are holding two quotes, the £110 to £550 supply rate is the part they will agree on. Compare the join count, the edge profile and what the fitting line covers. The cut-outs are counted, not estimated.

ex-local-authority flats and estates

The carry, and what it rules out

Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. Nothing this long gets walked while a warden is circling.

ex-local-authority flats and estates

What White City asks for

The stock here does not generate much of this. What it generates is worktop replacement, worktop installation and worktop fabrication. The job itself is surveyed, quoted and fitted exactly as it would be anywhere else we work.

ex-local-authority flats and estates

White City in the housing figures

In this neighbourhood much of the housing went up in the twenties and thirties. The kitchens are compact, so the fixed lines outweigh the stone. The same wall build-up comes up again and again, so what works on one holds for the next. The wall as it is, not as it should have been.

Access

Getting stone into a White City kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

White City is covered on our west London run, along with the rest of Hammersmith and Fulham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in White City

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is White City far enough out to be a problem for you?

Yes. White City is on the patch, and the postcodes we work here are W12. It is worked on our west London run, along with the rest of Hammersmith and Fulham. The goods lift has its own booking sheet, and a bay slot without a lift slot only gets the stone as far as the lobby. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. The crate stays on the van until the route in is clear. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

02

Is there anything about White City buildings that catches worktop splashbacks & upstands out?

A refuse chute or a service duct takes a corner of the kitchen in several of the standard plans, and neither of them moves. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Blown plaster comes off before stone goes on. Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. A downstand sets the panel height, not the wall units.

03

What do you check about the route into a White City property?

Pieces get staged in the ground floor lobby and sent up singly, which needs somewhere to stand them where nobody will walk into them. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Break positions are chosen for the carry. A bay shared across a parade of shops turns over all day, so the arrival time matters more than the length of the booking does. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Distance from tail lift to door is the whole risk here.

04

Is White City really a worktop splashbacks & upstands area?

Not especially, and pretending otherwise would be simple enough. What the research on this patch actually lists is worktop replacement, worktop installation and worktop fabrication. It is a fact about the local housing rather than about the work. The job is quoted, cut and fitted the same way wherever on the patch it lands. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Upstands turn batch offcuts into finished rooms. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The cheap way to make eight kitchens look specified.

05

Why do two White City kitchens the same size price differently?

On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Tall panels are what push a job into a second slab. Supply only, material is £110 to £550 per square metre, with templating, fabrication and fitting quoted on their own lines.

06

What has to be finished before you can template?

A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Behind the boxing it becomes two pieces. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Planned programmes run several kitchens in sequence, so template, fabrication and fitting move as a rolling operation and one uncollected key holds up more than one flat. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Whoever specifies it signs the drawing.

07

Do you cut drainer grooves on White City kitchens?

They are cut with a fall towards the bowl, which is why they cannot be added on site later. The bowl position has to be settled before templating, since the grooves are set out from it. Where there is no room for a separate drainer, grooves are usually what gets specified instead. There is nearly always a boxed soil stack or a service riser in a corner of the run, and it is rarely mentioned at enquiry. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Sockets move on paper more easily than in stone.

08

What happens if a piece will not go up the stairs?

The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. A join added to get stone into the room is a different thing from a join added because the slab ran out, and the quote says which is which. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. The step and the gap at the car threshold catch a trolley wheel, so the piece comes off the trolley and goes in by hand. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A tall panel cannot be tilted to clear a turn, so it is sized not to need to.

09

What happens to the worktop that comes off?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. What comes out goes by the same route the new stone comes in by, which is why that route is walked before anything is lifted. The units below stay exactly as they are; only the surface is replaced. Building management is often the real gate rather than the bay itself, since the barrier, the shutter and the lift each need someone with a fob. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. A long carry turns a light piece into an awkward one.

10

Why would a White City kitchen need a join at all?

There are only ever a few legal positions, and the one taken is furthest from the light. Join count is a question about slab size and run length, nothing else. A finished join is typically two to three millimetres, colour-matched and sanded flush. Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Height is agreed before the cut list closes.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is very practical for everyday use. Highly recommend Worktop Worx for anyone looking for quality quartz worktops.”
RO74 TVXGoogle review · Calacatta Gold
★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review

Next step

Splashbacks and upstands in White City, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.