Greenwich · SE18

Splashbacks and upstands in Woolwich Dockyard

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Woolwich Dockyard kitchens

The kitchens we meet in Woolwich Dockyard

What makes splashback and upstand work in Woolwich Dockyard worth thinking about properly is that the same worktop behaves very differently depending on what it is being fitted around. Small Victorian terraces and low-rise estate housing where the kitchen is the original back room, 2.1m to 2.7m of run, a boiler on the wall and an external door landing in the middle of the best worktop wall. None of that changes what you pay in Woolwich Dockyard. The figure is set at template and it holds from there.

Ground floors fall away towards the garden across the whole footprint, so the units are packed up long before anything is measured for stone. A wall out by a few millimetres over a metre will show behind a full-height panel and disappear behind an upstand. Panel joints land over a unit line, never mid-span.

A small room puts the sink, hob and tap cut-outs close together on one short length, and the bridge of stone left between them decides whether it can be cut in one piece. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Sockets in a stud wall move more easily than sockets in brick.

The housing behind these kitchens is Victorian terrace, 1970s low-rise estate and 1980s infill housing. They are not interchangeable, and a worktop finds the differences quickly.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • 1970s low-rise estate
  • 1980s infill housing

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
Borough
Greenwich
Postcodes
SE18
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Woolwich Dockyard is its own job

Our survey in Woolwich Dockyard exists to answer how the stone gets to the room and what it has to be levelled against. Narrow streets running down toward the river with parking on both sides and a couple of routes severed by the rail line; short carries, but rarely anywhere legal to stop for long. Expect to work around a wall-hung combi and a back door, usable run is often a metre shorter than the room suggests. The itemised quote is deliberately boring reading, because a boring quote is one with no surprises left in it.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. The height is settled first, since a slim upstand and a full sheet up to the wall units are different pieces of work and the wall between them is where the decision shows. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Behind a hob the choice of material stops being about looks: a resin-based surface will mark under sustained heat where a sintered one will not. A flexible bead does that seam, never grout, because the two pieces work against each other and grout has nothing to give. Chimney breasts in these kitchens leave a shallow opening where the range once stood, so the strip has to return into it on both sides. A hand's width, or all of it.

Waterfall ends See the options

The money

What it costs in Woolwich Dockyard

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. That £110 to £550 per square metre buys the slab and nothing else. Templating, machining, edges, cut-outs and the fitting day are counted and charged one by one. Priced by the edge and the openings, not the wall.

Victorian and Edwardian terraces

What Woolwich Dockyard asks for

Infrequent work for this area, though we do it whenever it is asked for. Worktop replacement and worktop fabrication are the commoner calls. Nothing about the method or the standard varies with frequency.

Victorian and Edwardian terraces

Woolwich Dockyard in the housing figures

In Woolwich Dockyard, landlords hold the greater part of the stock. The kitchens are compact, so the fixed lines outweigh the stone. Whether it is stone or tile is usually a budget decision made by someone who will never see the room. Templated after the top is in, never before.

Victorian and Edwardian terraces

The carry, and what it rules out

A piece carried on edge up a flight has to clear the ceiling above the stairs as well as the walls either side of it. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. They stand upright in the van and stay upright until they are on the wall.

Access

Getting stone into a Woolwich Dockyard kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Woolwich Dockyard is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Woolwich Dockyard

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Woolwich Dockyard?

Yes. Woolwich Dockyard is on the patch, and the postcodes we work here are SE18. It is worked on our south east London run, along with the rest of Greenwich. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

Does the housing in Woolwich Dockyard change how worktop splashbacks & upstands works?

There is no back addition on these, so the kitchen is the original rear room and the run is one wall long with a door at each end of it. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. What the plaster is stuck to matters more than its colour. Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. A bowed wall shows on a panel and hides under an upstand.

03

How does the stone actually reach a kitchen in Woolwich Dockyard?

Open-tread and cantilevered stairs give nothing to lean a piece against, so the whole weight stays on the crew for the full length of the flight. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A door frame catches a tall panel long before a short one. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. That is why they are crated the way they are.

04

Is worktop splashbacks & upstands what Woolwich Dockyard is known for?

Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop replacement and worktop fabrication. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Wipe-down beats sealed grout on a turnaround. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Plot spec panels are ordered by the plot, not the room.

05

What am I actually paying for, line by line?

The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

06

Is there anything I have to finish before the template in Woolwich Dockyard?

A notch around a boxed stack is machined with a radius at the internal corner, because a square inside corner there is exactly where a top will crack. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Mitred returns come from one place in the slab. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. A leaseholder paying for their own kitchen inside managed stock still needs the freeholder to consent, and that consent is about the building and the common parts rather than about the worktop. Full-height panels need the wall made good first, which is another trade and another timescale. Agreed with whoever is paying for both.

07

Which materials need sealing and which do not?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Topping a seal up is a wipe-on job with a cloth. That rear wall carries the back door and the only window, which leaves very little uninterrupted length for a sink run. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. A reveal in a thick wall changes where the panel stops.

08

What is actually on a Woolwich Dockyard worktop quote?

Plumbing, gas and electrical work are not in the figure, because we do not do them. Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. Taking the old tops away is a line rather than an assumption, so it comes off if you do not want it. A live soil stack cannot be chased back into the wall, so the depth it steals is permanent and the run is planned around it rather than through it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The pier takes a joint against it, not across it.

09

Will you fit stone onto units that are not level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Packing takes up small variation. It is not there to hide something that belongs in the units. If the carcasses are corrected, the template is taken again, since a drawing off units that then moved is worthless. Boxing built in plasterboard on a light frame will take no useful fixing, so nothing bears on it and the stone is carried off the carcasses either side. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. A window board below worktop height ends the upstand argument.

10

What if something breaks during the fit?

Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Door frames and the stair route are protected too, since most contact happens on the way in. A remake goes back through the same cutting and polishing, so it is a return visit rather than a patch. A handrail that has to come off before a piece will pass is twenty minutes at the start of the day, and it goes back on the wall before we leave. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Splashbacks and upstands in Woolwich Dockyard, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.