The building, and what it does to the job
Around here much of what is standing is recent build. The schedule matters more than the finish. A heavier surface may need the cabinets braced, which is settled once the old laminate is lifted. No gap in the kitchen overnight.
Ceiling heights are held to the minimum the plan allows, so the panel between worktop and wall units is a short piece. Communal areas are protected from the entrance to the flat door, because the building notices a mark long before the client does. Old fabric gets handled as old fabric.
The knock-through peninsula across an old serving arch is the recurring job here, and the arch reveal almost always needs an exact template rather than a stated dimension.
Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. We would rather find it at template than on the morning, which is why the templater looks behind the units. The stack was boxed in after the kitchen went in.
