The housing stock
What we are usually working with in Wallend
These were built with a coal store and an outside lavatory off the back, and where those got absorbed into the kitchen the walls around them are thinner and later. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. The whole run is dry-fitted before any adhesive is opened.
Interwar semis with a kitchen at the rear and a separate dining room, often knocked into one to make an L-shaped kitchen-diner with 3m plus a 1.5m return. Boilers are usually still in the kitchen and get boxed into a tall unit at the end of the run.
Side access and a straight rear run mean single-piece tops are usually achievable here, so the design conversation is about overhangs, not joints.
A good number have a garage attached to the flank wall with a door through from the kitchen, which is both a way in and a stretch of wall the run cannot use. The fitting itself is slower than the carry: original plaster on the party wall and around the old chimney breast is rarely square to the run, so back scribes get cut on site, and where a return wraps into a breast recess we template that shoulder tight and ease it in. Walked, measured, protected, then lifted.
What we find behind the front doors here is 1930s semi-detached, interwar terrace and post-war infill. They are not interchangeable, and a worktop finds the differences quickly.
Quartz and stone worktops in Wallend