Kensington and Chelsea · SW3

Worktop replacement in Brompton

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Brompton kitchens

The kitchens we meet in Brompton

Before you settle on a material, it is worth understanding how worktop replacement in Brompton is shaped by the room it has to go into. Behind the Brompton Road shopping frontages the houses are deep and narrow with kitchens at lower ground, and many have been extended into a small rear courtyard giving an L of 3.2m by 2m. Flats over the retail parades have kitchens squeezed against a party wall with a lot of pipework boxed in, so the worktop is scribed to boxing rather than to plaster. Nothing gets cut from a description. It gets cut from a template taken off the units once they are in.

A stub wall divides the kitchen from the back lobby, and it rarely stayed where the original drawing put it. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. The wall behind the old top is rarely the wall on the drawing.

Rear access over a flat roof or up an external stair exists in some of these, and it is worth checking before the front stair is assumed. The units are often 1970s or 80s and only around 500mm deep, so a standard 600mm stone top overhangs at the front and the doors and drawer fronts need checking against it. The units have settled with the floor and get re-levelled.

What the surveys keep coming back to is red-brick Victorian terrace, stucco terrace, mansion flat over shop and mews behind the main road. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • red-brick Victorian terrace
  • stucco terrace
  • mansion flat over shop
  • mews behind the main road

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Kensington and Chelsea
Postcodes
SW3
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Brompton is its own job

What we want to establish about your kitchen in Brompton is how we get to it and what we will be fixing against. The main road is a red route with no stopping in the day, so unloading happens on the mews and side streets and the carry-in is on foot through gardens or a shared side passage. Flats above shops are reached by a single narrow street door and a straight steep stair with a hard 90 at the top, which is the piece-length limiter. Scribing is the skill here - decades of boxed-in services mean almost nothing behind a base unit is actually straight or plumb. Whatever the building does to a straight line, it is measured on the template and drawn before anything is cut.

The work

What worktop replacement involves

The service assumes the units stay in place, so it is not a route to changing the layout. Moving a sink or a run of cabinets makes it a kitchen job with a worktop in it. We take the old surface off, check the carcasses are sound and level, and fit the new tops the same day. Disposal of the old worktop is a separate line on the quote rather than folded into the price. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

Most of a replacement happens before any stone is unwrapped, because the removal and what it exposes set everything that follows. The existing top comes off in the order it went on, so the sealant is cut through first and the fixings released before anything is lifted. The back door opens straight off the kitchen, so the old run leaves the house in a few steps. The old surface leaves in our van, not your garden.

Waterfall ends See the options

The money

What it costs in Brompton

What the old worktop was fixed to matters more to the price than what goes on top of it. The corner is either a join or a single cut piece, and which one it is changes both the price and how the run reads. The rate is £110 to £550 per square metre supply only, though what you buy is slabs rather than square metres, which is why the material line follows the yield and not the tape. The carcass check happens before the deposit.

Victorian and Edwardian terraces

Brompton in the housing figures

Locally flats outnumber houses by a wide margin. Every survey starts from a blank sheet. A stone top leaves in sections, and getting those sections down the stairs is where the labour goes. Measured after the old surface is off, where it matters.

Victorian and Edwardian terraces

The carry, and what it rules out

Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. It also decides whether the sink and hob can stay connected while the pieces are moved. Whether the strip-out is a cut-up job is settled at template.

Victorian and Edwardian terraces

What Brompton asks for

If one job keeps us on this patch, it is this one.

Access

Getting stone into a Brompton kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Brompton is covered on our west London run, along with the rest of Kensington and Chelsea.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Brompton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Brompton, or is it a subcontractor?

Yes. Brompton is on the patch, and the postcodes we work here are SW3. It is worked on our west London run, along with the rest of Kensington and Chelsea. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old stone is heavier going out than it looked coming in. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What should I expect from worktop replacement in a Brompton kitchen?

A flat over a shop is reached by a separate street door and a straight steep stair, and that stair is the whole access question. Post-war terraces have small, roughly square kitchens with a back door and a window in the middle of the run, so runs are short and joins are rare, but there are usually two corners and a window cill to work around in a couple of metres. Tile beds and adhesive come off before the new top goes on. A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Nothing about it is a discovery on fitting day.

03

How would you get a worktop into a property in Brompton?

Every flight adds a set of handling movements, and handling is where stone gets damaged, so a fourth-floor walk-up is priced by the flight rather than by the metre. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Two carries in one day needs the route free for both. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The van has to stand through both halves of the day.

04

Is Brompton mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. One flat out of use at a time. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The carcasses have to be sound, because stone is several times the weight of what is coming off. Chosen against the doors that are staying.

05

What moves the number on a quote around here?

Butt-jointing over the gable puts the seam a few hundred millimetres back from the corner, below the eye line instead of straight across it. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. A run that flexed under laminate gets support now. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What state does a Brompton kitchen have to be in before you template?

Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate was scribed thin. Stone cannot be. Empty the base units completely and have a plumber disconnect the sink, tap and any washing machine plumbed in under the worktop before we arrive. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Units stay, so the flat is usable that evening.

07

How do you cut out for an undermounted sink?

A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Two bowls means two cut-outs and a bridge of stone between them, which decides where the sink can go. Corner sinks and corner hobs sit exactly where the joint wants to be, so on an L the cut-out positions get settled before the join positions do. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Appliance gaps are checked against the new thickness.

08

What do drainer grooves add to the job?

A groove set is its own item on the quote rather than something rolled in with the sink cut-out. A groove set needs a clear stretch of worktop beside the bowl, so it competes with the run for length instead of being free surface. Where there is no room for a separate drainer, grooves are usually what gets specified instead. A boiler hangs on the wall above the run in most of these, and its pipework drops exactly where a splashback wants to go. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Nothing new goes down until the run reads level end to end.

09

Will you fit stone onto units that are not level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Packing takes up small variation. It is not there to hide something that belongs in the units. Levelling belongs in the carcasses, on their own legs and packers. A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. What is behind the old top decides the day.

10

Do most Brompton kitchens take upstands or full-height splashbacks?

Both are templated after the worktop is down and settled, because they are cut to the wall itself. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. Tiling and stone can meet, but where they meet is decided before the template rather than after. The stair from the street is narrow with a tight turn at the top, which caps piece length well below anything the run itself needs. Chipboard carcasses under the sink swollen from a slow leak will not take stone and get replaced before fit day. A replacement is measured against the walls as they are now.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Worktop replacement in Brompton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.