Kensington and Chelsea · SW1W SW3

Worktop replacement in Sloane Square

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Sloane Square kitchens

The kitchens we meet in Sloane Square

People ring us about worktop replacement in Sloane Square at the point where they have a kitchen in mind and no idea what their own walls are going to do to it. Estate leasehold flats dominate and the kitchens are original service positions - often a narrow room of 2.2-2.8m against an external wall with a light well window, and a separate utility cupboard. Landlord consent shapes the job more than the room does, so most work is like-for-like surface replacement with new upstands rather than a re-plan. Nothing gets cut from a description. It gets cut from a template taken off the units once they are in.

Chimney breasts and the alcoves either side of them break the run into short pieces before anyone has drawn a kitchen. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. A thicker top changes what clears the top drawer.

Wider halls make the carry noticeably easier, and that alone can remove a join that a narrower terrace would have forced into the run. Each piece is offered up and eased in rather than dropped, because nothing in the room is straight enough to drop into. Chipboard that has taken water will not take stone.

Around here the stock is Cadogan Estate red-brick and terracotta mansion block, late Victorian townhouse, Georgian survivor terrace and estate-managed leasehold flat. They were built to different tolerances, and the stone has to absorb that.

Worktop join finished flush against a wall
  • Cadogan Estate red-brick and terracotta mansion block
  • late Victorian townhouse
  • Georgian survivor terrace
  • estate-managed leasehold flat

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
Borough
Kensington and Chelsea
Postcodes
SW1W, SW3
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Sloane Square is its own job

If a firm has never fitted in Sloane Square, the things that decide the day will only turn up once the van is parked. Porters, sign-in books, lift protection and a works-hours window that typically runs weekday daytime only, with no weekend working permitted under the lease. Sloane Street and the square itself have short loading windows and heavy enforcement, so unloading is normally into the block's side or rear service door on a timed slot. Landlord consent and the lease decide what you are allowed to change, so confirm it is a straight replacement before templating anything that moves a service. Whatever the building does to a straight line, it is measured on the template and drawn before anything is cut.

The work

What worktop replacement involves

Replacement suits a kitchen that works but has a surface past saving, burnt, swollen at the joints, or lifting where water has found its way into the board underneath. The new pieces go down onto the same units the old ones came off, so the run is set, joined and sealed in the afternoon of a day that began with a strip-out. You end up with a job that stayed within its own boundaries. The floor, the plastering and the electrics were never opened up, because none of them is involved in changing a surface.

Replacement sometimes runs in the reverse order to a new fit, because the old top has to come off before what is under it can be templated. The wall behind the old splashback is made good and left flat before the new piece is templated against it. A kitchen in one of these has been re-fitted at least twice already, and every fit left something behind under the top. Support goes in before the weight does.

Corners and joins See the options

The money

What it costs in Sloane Square

What the old worktop was fixed to matters more to the price than what goes on top of it. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. The catalogue starts at £110 per square metre at the plainest end and reaches £550 at the top, supply only, with the same fabrication work sitting behind either choice. The strip-out and the disposal are their own lines.

mansion blocks and purpose-built flats

The carry, and what it rules out

Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Two carries in one day doubles what the distance costs.

mansion blocks and purpose-built flats

What Sloane Square asks for

Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. Several flats can be done on consecutive days, with one kitchen out of use at a time. Cam-lock carcasses get braced before stone lands.

This is the job the local stock asks for first, ahead of worktop splashbacks & upstands.

Access

Getting stone into a Sloane Square kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Sloane Square is covered on our west London run, along with the rest of Kensington and Chelsea.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Sloane Square

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Sloane Square, or is it a subcontractor?

Yes. Sloane Square is on the patch, and the postcodes we work here are SW1W, SW3. It is worked on our west London run, along with the rest of Kensington and Chelsea. The goods lift has its own booking sheet, and a bay slot without a lift slot only gets the stone as far as the lobby. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. A suspension for the full day beats half a day lost. You never have to visit anything or collect anything: we template in your kitchen and fit in your kitchen.

02

What is different about worktop replacement in Sloane Square?

Half-landings mean the back of the house sits at a slightly different level from the front, and a knocked-through kitchen crosses that line. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. The floor has dropped since the kitchen went in. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Nothing about it is a discovery on fitting day.

03

Is access a problem in Sloane Square?

A height barrier on the car park entrance rules out a tail-lift van outright, and the stone then transfers to a trolley at the barrier itself. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. The van stands for both movements, not just the delivery. A bay shared across a parade of shops turns over all day, so the arrival time matters more than the length of the booking does. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Nothing goes out until the route back to the van is clear.

04

Is worktop replacement what Sloane Square rings about?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Housings set out for laminate are checked first. Agents book this work at short notice, because the void only becomes a real date once the outgoing tenant confirms they are going. The carcasses have to be sound, because stone is several times the weight of what is coming off. A builder-finish kitchen upgrades in a morning.

05

What makes one Sloane Square kitchen dearer than the next?

A tall bank of housings at one end takes a chunk out of the working run, so the usable length of that side is always less than the length of the wall behind it. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Any overhang gets underpinned first. Supply only, material is £110 to £550 per square metre, with templating, fabrication and fitting quoted on their own lines.

06

What holds a template up more often than anything else?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate was scribed thin. Stone cannot be. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Work between tenancies runs against a fixed date rather than a preference, and stone has a lead time that has to fit inside that window with a few days spare. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Notice goes out before the crew is booked.

07

What is the order of events on a Sloane Square kitchen?

The template is taken in your kitchen after the units are in and fixed, never before. Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. No money changes hands before the template. The original front door is narrow and the hall is often the only way in, which puts a ceiling on the longest single piece. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. The units are relevelled before anything new is bedded.

08

What if the units in a Sloane Square kitchen have moved since they went in?

Small variation is taken up by packing under the top on the fitting day. Level is checked at the template, which is the point of measuring in the room rather than off a drawing. Levelling belongs in the carcasses, on their own legs and packers. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. A laminate top was scribed thin at the back to swallow it, and stone cannot be shaved down the same way. What is behind the old top decides the day.

09

What happens if a piece will not go up the stairs?

Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. The alternative to a join is a shorter run, which is usually the wrong thing to trade away. Splitting a run costs a join, and that is the price of getting stone into the room at all. Concierge buildings want the goods entrance, a booked lift and proof of insurance, all of which is straightforward when it is asked for a week out. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. A laminate run comes out easier than stone goes in.

10

Do you do undermounted sinks in Sloane Square?

Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. Where the hob lands is set out against the units and the wall behind, not off the kitchen plan. A full-depth tall unit projects past the worktop line, and the run has to be scribed against its side panel instead of carrying on past it. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. The shape is measured again, not copied off the old top.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst
★★★★★
“Great work, super helpful team. I'd definitely recommend!”
Andreea TanaseGoogle review
★★★★★
“Great experience from this company, I am happy with the materials, fitting and the team.”
Rrahim BratiGoogle review

Next step

Worktop replacement in Sloane Square, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.