Richmond upon Thames · SW13
Splashbacks and upstands in Castelnau
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Castelnau kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The wall decides, not the brochure.
Distinctive early Victorian paired villas with tall rooms and deep plans - kitchens usually at the rear or in a lower ground, with 3.5m to 4m runs, high ceilings that allow full-height splashbacks, and space for a proper island in the wider houses.
Tall rooms tempt full-height slab splashbacks, and at 2.4m plus these become the heaviest single piece on the job - plan the lift for the splashback, not the top.
Walls are thick, lime-plastered and built in a soft brick, so they take a scribe well and take a fixing badly. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here — it rides the bow and hides the junction the worktop can never close on its own. The wall makes that decision, not the brochure.
The buildings themselves are mostly 1840s stucco villa, Victorian semi, interwar flats and postwar infill. Which of those you have decides most of what follows.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the New Malden patch. Fitted 3–7 working days from template.
period detached houses and villas
Getting stone into the room
The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance.
period detached houses and villas
The building, and what it does to the job
Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail.
period detached houses and villas
What gets asked for here
This is the job the local stock asks for first, ahead of worktop fabrication and worktop installation.
Access
Getting stone into a Castelnau kitchen
The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Castelnau is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Castelnau
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Castelnau, or just list it?
Yes. Castelnau is on the patch, and the postcodes we work here are SW13. It is run from the New Malden side, covering South West London & Surrey. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in Castelnau?
Rooms are tall with deep window reveals, and a run finishing into a reveal is templated to it rather than assumed square. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here — it rides the bow and hides the junction the worktop can never close on its own. The wall makes that decision, not the brochure. Tall rooms tempt full-height slab splashbacks, and at 2.4m plus these become the heaviest single piece on the job - plan the lift for the splashback, not the top.
Is access a problem in Castelnau?
The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance. The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is Castelnau mostly worktop splashbacks & upstands work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop fabrication and worktop installation. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day.
What decides the price of a worktop in Castelnau?
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.
Related
More around Castelnau
Other work we do in Castelnau
Next step
Splashbacks and upstands in Castelnau, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.